ReraGenieLog inGet a buyer report

Home / Browse projects / SPARKLE

Registration lapsed No litigation declared Residential / Group Housing project

SPARKLE

By SKYRISE VENTURES LLP

RG-MH-22654 · RERA P52100032572 · Last updated on MahaRERA portal: 9 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2025Possession promised16 months past this date
11 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 50%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

SPARKLE is a Residential / Group Housing project by SKYRISE VENTURES LLP in Near Gokul Nagar, 411015, registered with MahaRERA as P52100032572 on 11 Jan 2022. Possession was promised by 30 Jun 2025 and is now 16 months past that date.

At a glance

Project

  • NameSPARKLE
  • TypeResidential / Group Housing
  • Location
    • D P Road
    • Near Gokul Nagar
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032572
  • ReraGenie IDRG-MH-22654

Builder

  • NameSKYRISE VENTURES LLP
  • Entity typePartnership
  • PartnersMUKESH TILAKCHAND AGARWAL, AMIT RAJENDRA GOYAL, ARUN SHAM AGARWAL, VIHAAN LANDMARKS LLP through its authorized representative KAPIL SHAMLAL GOYAL
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

16 months past promisethis monthRegisteredJan 2022PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Jan 2022
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SPARKLE A WINGNA140000
SPARKLE B WINGNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 50%.

SPARKLE A WING63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SPARKLE B WING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities31

As on 9 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Yoga areaYes0%
Society OfficeYes0%
Smart Security SystemYes0%
Senior Citizen Seat outYes0%
Power Backup for Common area and LiftYes0%
Multipurpose courtYes0%
Automatic Gearless LiftYes0%
CCTV Common areaYes0%
Children PlayYes0%
Children Play areaYes0%
LibraryYes0%
Led Light for Common areaYes0%
Jogging and walking trackYes0%
Indoor GamesYes0%
GymYes0%
Club HouseYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI13972.39
Proposed, not sanctioned6,572 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchYerwada

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architect Associates
EngineerHimanshu Bansal
Chartered AccountantAGH & Associates
PartnerRole in project
SKYRISE VENTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 Q3.pdf9 Jun 2025
Form 2File: FORM 2 Q3.pdf9 Jun 2025
Form 3File: Form 3 Q3.pdf9 Jun 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Q3.pdf9 Jun 2025
Self-declaration of Quarterly ProgressFile: FORM 1 Q3.pdf9 Jun 2025
Form 1File: FORM 1 Q4.pdf9 Jun 2025
Form 2File: FORM 2 Q4.pdf9 Jun 2025
Form 3File: Form 3 Q4.pdf9 Jun 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Q4.pdf9 Jun 2025
Self-declaration of Quarterly ProgressFile: FORM 1 Q4.pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1.pdf19 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Q4.pdf19 Jul 2024
Layout approvalFile: 1 RPlan Sparkle layout.pdf18 Jan 2024
Building plan approvalFile: 2 Rplan Sparkle Parking Layout.pdf18 Jan 2024
Building plan approvalFile: 3 R Plan Sparkle Wing A shops.pdf18 Jan 2024
Building plan approvalFile: 4 Rplan Sparkle Wing A Flats.pdf18 Jan 2024
Building plan approvalFile: 5 Rplan Sparkle Wing A building design.pdf18 Jan 2024
Building plan approvalFile: 6 Rplan Sparkle Wing B Flats.pdf18 Jan 2024
Building plan approvalFile: 7 Rpaln Sparkle Wing B building design.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: 1 RPlan Sparkle layout.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Rplan Sparkle Parking Layout.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 R Plan Sparkle Wing A shops.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 Rplan Sparkle Wing A Flats.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Rplan Sparkle Wing A building design.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Rplan Sparkle Wing B Flats.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 Rpaln Sparkle Wing B building design.pdf18 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC2523 23 Sparkle B.pdf18 Jan 2024
Declaration about Commencement CertificateFile: Cc Dcl sparkle .pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Skyrise Ventures FY22-23.pdf25 Dec 2023
Proforma of Agreement for saleFile: 2 Proforma of Allotment letter.pdf25 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Q1- APR-JUNE 23-24.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 -apr-june 23-24.pdf25 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form two.pdf25 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form three.pdf25 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Q4.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Q4.pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Q4-.pdf11 Jul 2023
Details of encumbrancesFile: enc one.pdf1 Apr 2023
Details of encumbrances concerned to FinanceFile: encourage legal two.pdf1 Apr 2023
Details of encumbrances concerned to LegalFile: encourage legal two.pdf1 Apr 2023
Deviation Report with respect to Allotment letterFile: allotment three.pdf1 Apr 2023
Deviation Report with respect to model copy of AgreementFile: AGREEMENT FOUR.pdf1 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form one arch.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form Two eng.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form three ca CC.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form ONE Sparkle Q two.pdf27 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form two sparkle Q two.pdf27 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form THREE Sparkle Q CC.pdf27 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form one Skyrise Ventures LLP.pdf19 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form two sparkle.pdf19 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form three Skyrise Ventires LLP.pdf19 Apr 2022
Layout approvalFile: one layout.pdf3 Jan 2022
Building plan approvalFile: Two layout-compressed.pdf3 Jan 2022
Building plan approvalFile: Three layout-compressed.pdf3 Jan 2022
Building plan approvalFile: 4 P.pdf3 Jan 2022
Building plan approvalFile: 5 P.pdf3 Jan 2022
Copy of the legal title reportFile: Rera search report sparkle_compressed-compressed.pdf3 Jan 2022
Copy of Layout Approval (in case of layout)File: one layout.pdf3 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Two layout-compressed.pdf3 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Three layout-compressed.pdf3 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 4 P.pdf3 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: 5 P.pdf3 Jan 2022
Declaration about Commencement CertificateFile: Declaration of CC.pdf3 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_.pdf30 Dec 2021
Declaration in FORM BFile: Form B Rera.pdf3 Dec 2021
Proforma of Allotment letterFile: AGREEMENT sparkle.pdf30 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form two Engineer Certificate.pdf20 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form three Skyrise Ventures LLP_compressed.pdf20 Nov 2021
Proforma of Allotment letterFile: Allotment letter.pdf19 Nov 2021
Details of encumbrancesFile: ENCUM.pdf9 Nov 2021
PAN CardFile: Firm Pan Card.pdf1 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: CC SPARKLE.pdf1 Nov 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
CASTLE ROYAOSr. No. 286 hissa 2 Lohegaon80CompletedDec 2019Dec 2019

Keep SPARKLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Gokul Nagar

2 kmSPARKLECompleted 37Lapsed / revoked 18Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 75 registered projects within 2 km.

Builder: SKYRISE VENTURES LLP

SKYRISE VENTURES LLP has 2 registrations on MahaRERA, including SPARKLE and SPARKLE Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.

Frequently asked questions

What does it mean that SPARKLE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SPARKLE is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPARKLE?

The registered promoter entity is SKYRISE VENTURES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPARKLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SPARKLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPARKLE?

The professionals named in the filing: Architect: Cubix Architect Associates; Engineer: Himanshu Bansal; Chartered Accountant: AGH & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPARKLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPARKLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPARKLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.