Registration lapsed No litigation declared Residential / Group Housing project

SPACE WORLD BUILDING NO 2 B WING

By VIKAASHA HOUSING

RG-MH-27235 · RERA P52000008029 · Last updated on MahaRERA portal: 10 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 90%
18 of 28Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

SPACE WORLD BUILDING NO 2 B WING is a Residential / Group Housing project by VIKAASHA HOUSING in Raigarh, Maharashtra, registered with MahaRERA as P52000008029 on 18 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing. 10 of the 28 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSPACE WORLD BUILDING NO 2 B WING
  • TypeResidential / Group Housing
  • Location
    • ANJAP
    • KARJAT
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000008029
  • ReraGenie IDRG-MH-27235

Builder

  • NameVIKAASHA HOUSING
  • Entity typePartnership
  • GSTIN27AAMFV0631N1ZR
  • PartnersSANTOSHKUMAR RAVINATH SHETTY, BHAVESH RAMESH THAKKAR, VINAYPRAKASH AKHLESHPRATAP SINGH, SACHIN LALJI THAKKAR, NIRAV HASMUKHRAI PANCHMATIA, MONA SANJAY PABARI
  • Other registrations9 more →
  • No longer live10 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseDec 2022Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed101 files

Current status

36%10 of 28 units booked

Figures as on 10 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA9728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

B WING: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered1
Open Space29

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area802 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKarjat Municipal Corporation
Permissible FSI816.0
Proposed, not sanctioned816 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR NO 19 NEW PANVEL NAVI MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATISH MANOHAR
Chartered AccountantManish Kumar Gupta & Co
Chartered AccountantAryan Patwari & Associates
PartnerRole in project
VIKAASHA HOUSING-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000027711Dec 2022 → Dec 2025

Reason as filed by the promoter1.The promoter has suffered from financial difficulties due to adverse economic condition in the Indian Real Estate Market. 2.Sales figures have been consistently lower than expected, impacting the revenue needed to fund ongoing construction efforts, Construction activities will catch pace once a more favourable financial outlook is achieved, and currently construction is progressing at a slower pace.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600723NITIN BHAUSAHEB SALVIVIKAASHA HOUSING08/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Sep-25.pdf10 May 2026
Form 2File: Building No 2B.pdf10 May 2026
Form 3File: CA Certificate 30-09-2025 Building No 2B.pdf10 May 2026
Disclosure of Sold and Booked InventoryFile: Building No 2B Sep-25.pdf10 May 2026
Form 1File: Dec-25.pdf10 May 2026
Form 2File: Building No 2B.pdf10 May 2026
Form 3File: CA Certificate 31-12-2025 Building No 2B.pdf10 May 2026
Disclosure of Sold and Booked InventoryFile: Building No 2B Dec-25.pdf10 May 2026
Form 3File: 2B Form 3 CA Certificate Mar 2025.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory 2B.pdf10 Oct 2025
Form 1File: 4 B Wing - Mar 2025.pdf10 Oct 2025
Form 2File: 2 B March 2025.pdf10 Oct 2025
Form 3File: 2B Form 3 CA Certificate Jun 2025.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory 2B.pdf10 Oct 2025
Form 1File: 1 B June 2025.pdf10 Oct 2025
Form 2File: 2 B June 2025.pdf10 Oct 2025
Declaration in FORM BFile: Affidavit Declaration vikasha housing 2B.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Engineers Certificate 2B-31-7-2017.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Engineers Certificate 2B-31-7-2018.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Engineers Certificate 2B-31-3-2019.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Engineers Certificate 2B-31-3-2020.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Engineers Certificate 2B-31-3-2021.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Engineers Certificate 2B-31-3-2022.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Engineers Certificate 2B-31-3-2023.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Engineers Certificate 2B-31-3-2024.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Engineers Certificate 2B-30-6-2024.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Engineers Certificate 2B-30-9-2024.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Engineers Certificate 2B-31-12-2024.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SW B2-Wing-B 31-03-2020.pdf31 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SW B2-Wing-B 31-03-2021.pdf31 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold unsold inventory 2B.pdf31 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SW B2-Wing-B 31-03-2022.pdf31 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SW B2-Wing-B 31-03-2023.pdf31 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SW B2-Wing-B 31-03-2024.pdf31 Mar 2025
Declaration in FORM BFile: Affidavit 2.pdf27 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2B Form 1.pdf27 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2B Form 1.pdf27 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2B Form 1.pdf27 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2B Form No 1.pdf27 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2B Form 1.pdf27 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2B Form 1.pdf27 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 B-Wing - June 2024.pdf27 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 B Wing - Sep 2024.pdf27 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 B Wing - Dec 2024.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate June 2024.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate Dec 2024.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate Sept 2024.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate 2024.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate 2023.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate 2021.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate 2021.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate 2020.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate 2019.pdf27 Feb 2025
Certificates of CA (Form 3)File: 2B Form 3 CA Certificate 2022.pdf27 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 B Wing-31-03-2024.pdf27 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building 2B - 31-12-2024.pdf27 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building 2B - 30-09-2024.pdf27 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building 2B - 30-06-2024.pdf27 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 B Wing-31-03-2023.pdf27 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 B Wing-31-03-2022.pdf27 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 B Wing-31-03-2021.pdf27 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 B Wing-31-03-2020.pdf27 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 2018-19 2B.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20 2B.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21 2B.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22 2B.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23 2B.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24 2B.pdf26 Feb 2025
Copy of the legal title reportFile: Search Space India.pdf21 Sep 2019
Copy of the legal title reportFile: TITLE Space India.pdf21 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B2- B.pdf12 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building 2 - B Wing.pdf12 Dec 2018
Certificates of CA (Form 3)File: CA Certificate B-2, B-wing.pdf12 Dec 2018
Certificates of CA (Form 5)File: CA certificate Building 2 B.PDF15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 1.pdf30 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 2-1.pdf30 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 2-3-4.pdf30 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 3.pdf30 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 3.pdf30 Mar 2018
Layout approvalFile: 7-7.pdf31 Jul 2017

How this compares with Raigarh

36%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 36 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SPACE WORLD BUILDING NO 2 B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KARJAT5,900+ in Raigarh

2 kmSPACE WORLD BUILDING NO Lapsed / revoked 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: VIKAASHA HOUSING

VIKAASHA HOUSING has 10 registrations on MahaRERA, including SPACE WORLD BUILDING NO 1 A WING and SPACE WORLD BUILDING NO 1 B WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that SPACE WORLD BUILDING NO 2 B WING shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SPACE WORLD BUILDING NO 2 B WING is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPACE WORLD BUILDING NO 2 B WING?

The registered promoter entity is VIKAASHA HOUSING, a partnership as per the filing. Its GSTIN 27AAMFV0631N1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPACE WORLD BUILDING NO 2 B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SPACE WORLD BUILDING NO 2 B WING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SPACE WORLD BUILDING NO 2 B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPACE WORLD BUILDING NO 2 B WING?

The professionals named in the filing: Architect: SATISH MANOHAR; Chartered Accountant: Manish Kumar Gupta & Co; Chartered Accountant: Aryan Patwari & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPACE WORLD BUILDING NO 2 B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPACE WORLD BUILDING NO 2 B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPACE WORLD BUILDING NO 2 B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.