Home / Browse projects / Raigarh, Maharashtra / SPACE WORLD BUILDING NO 2 A WING
SPACE WORLD BUILDING NO 2 A WING
RG-MH-27227 · RERA P52000007986 · Last updated on MahaRERA portal: 10 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SPACE WORLD BUILDING NO 2 A WING is a Residential / Group Housing project by VIKAASHA HOUSING in Raigarh, Maharashtra, registered with MahaRERA as P52000007986 on 18 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing. 4 of the 56 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameSPACE WORLD BUILDING NO 2 A WING
- TypeResidential / Group Housing
- Location
- ANJAP
- KARJAT
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000007986
- ReraGenie IDRG-MH-27227
Builder
- NameVIKAASHA HOUSING
- Entity typePartnership
- GSTIN27AAMFV0631N1ZR
- PartnersSANTOSHKUMAR RAVINATH SHETTY, BHAVESH RAMESH THAKKAR, VINAYPRAKASH AKHLESHPRATAP SINGH, SACHIN LALJI THAKKAR, NIRAV HASMUKHRAI PANCHMATIA, MONA SANJAY PABARI
- Other registrations9 more →
- No longer live10 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 10 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 9 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
A WING: 72% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 10 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed51
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SATISH MANOHAR |
| Chartered Accountant | Aryan Patwari & Associates |
| Chartered Accountant | Manish Kumar Gupta & Co |
| Partner | Role in project |
|---|---|
| VIKAASHA HOUSING | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1.The promoter has suffered from financial difficulties due to adverse economic condition in the Indian Real Estate Market. 2.Sales figures have been consistently lower than expected, impacting the revenue needed to fund ongoing construction efforts, Construction activities will catch pace once a more favourable financial outlook is achieved, and currently construction is progressing at a slower pace.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Sep-25.pdf | 10 May 2026 |
| Form 2File: Building No 2A.pdf | 10 May 2026 |
| Form 3File: CA Certificate 30-09-2025 Building No 2A.pdf | 10 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Building No 2A Sep 25.pdf | 10 May 2026 |
| Form 1File: Dec-25.pdf | 10 May 2026 |
| Form 2File: Building No 2A.pdf | 10 May 2026 |
| Form 3File: CA Certificate 31-12-2025 Building No 2A.pdf | 10 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Building No 2A Dec-25.pdf | 10 May 2026 |
| Form 3File: 2A Form 3 CA Certificate Mar 2025.pdf | 10 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Bookd Inventor 2A.pdf | 10 Oct 2025 |
| Form 1File: 4 A Wing - Mar 2025.pdf | 10 Oct 2025 |
| Form 2File: 2 A March 2025.pdf | 10 Oct 2025 |
| Form 3File: 2A Form 3 CA Certificate Jun 2025.pdf | 10 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Bookd Inventor 2A.pdf | 10 Oct 2025 |
| Form 1File: 1 A June 2025.pdf | 10 Oct 2025 |
| Form 2File: 2 A June 2025.pdf | 10 Oct 2025 |
| Declaration in FORM BFile: Affidavit Declaration vikasha housing 2A.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Engineers Certificate 2A-31-07-2017.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Engineers Certificate 2A-31-07-2018.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Engineers Certificate 2A-31-3-2019.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Engineers Certificate 2A-31-3-2020.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Engineers Certificate 2A-31-3-2021.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Engineers Certificate 2A-31-3-2022.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Engineers Certificate 2A-31-3-2023.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Engineers Certificate 2A-31-3-2024.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Engineers Certificate 2A-30-6-2024.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Engineers Certificate 2A-30-9-2024.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Engineers Certificate 2A-31-12-2024.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SW B2-Wing-A 31-03-2020.pdf | 31 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SW B2-Wing-A 31-03-2021.pdf | 31 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Bookd Inventor 2A.pdf | 31 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SW B2-Wing-A 31-03-2022.pdf | 31 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SW B2-Wing-A 31-03-2023.pdf | 31 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SW B2-Wing-A 31-03-2024.pdf | 31 Mar 2025 |
| Declaration in FORM BFile: Affidavit 2A.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2A Form 1.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2A Form 1.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2A Form 1.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2A Form No 1.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2A Form 1.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building No 2A Form 1.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 A Wing - June 2024.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 A Wing - Sep 2024.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 A Wing - Dec 2024.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: 2A Form 3 CA Certificate June 2024.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: 2A Form 3 CA Certificate Dec 2024.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: 2A Form 3 CA Certificate Sept 2024.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: 2A Form 3 CA Certificate 2024.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: 2A Form 3 CA Certificate 2022.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: 2A Form 3 CA Certificate 2021.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: 2A Form 3 CA Certificate 2020.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: 2A Form 3 CA Certificate 2019.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: 2A Form 3 CA Certificate 2023.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 A Wing-31-03-2024.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building 2A - 31-12-2024.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building 2A - 30-09-2024.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building 2A - 30-06-2024.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 A Wing-31-03-2023.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 A Wing-31-03-2022.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 A Wing-31-03-2020 pdf.pdf | 27 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Space World Building No 2 A Wing-31-03-2020 pdf.pdf | 27 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 2018-19 2A.pdf | 26 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20 2A.pdf | 26 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21 2A.pdf | 26 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22 2A.pdf | 26 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23 2A.pdf | 26 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24 2A.pdf | 26 Feb 2025 |
| Copy of the legal title reportFile: Search Space India.pdf | 21 Sep 2019 |
| Copy of the legal title reportFile: TITLE Space India.pdf | 21 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B2- A.pdf | 12 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building 2 - A Wing.pdf | 12 Dec 2018 |
| Certificates of CA (Form 3)File: CA Certificate B-2, A-wing.pdf | 12 Dec 2018 |
| Certificates of CA (Form 5)File: CA certificate Building 2 A.PDF | 15 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 1.pdf | 30 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 2-1.pdf | 30 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 2-3-4.pdf | 30 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 3.pdf | 30 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Vikasha Na order 4.pdf | 30 Mar 2018 |
| Layout approvalFile: 2-7.pdf | 31 Jul 2017 |
| Layout approvalFile: 7-7.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SPACE WORLD BUILDING NO 2 A WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KARJAT5,900+ in Raigarh
Filed coordinates, straight-line distance. 13 registered projects within 2 km.
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: VIKAASHA HOUSING
VIKAASHA HOUSING has 10 registrations on MahaRERA, including SPACE WORLD BUILDING NO 1 A WING and SPACE WORLD BUILDING NO 1 B WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that SPACE WORLD BUILDING NO 2 A WING shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SPACE WORLD BUILDING NO 2 A WING is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SPACE WORLD BUILDING NO 2 A WING?
The registered promoter entity is VIKAASHA HOUSING, a partnership as per the filing. Its GSTIN 27AAMFV0631N1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SPACE WORLD BUILDING NO 2 A WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SPACE WORLD BUILDING NO 2 A WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SPACE WORLD BUILDING NO 2 A WING?
The professionals named in the filing: Architect: SATISH MANOHAR; Chartered Accountant: Aryan Patwari & Associates; Chartered Accountant: Manish Kumar Gupta & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SPACE WORLD BUILDING NO 2 A WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback