SONA PARADISE
RG-MH-44582 · RERA P51700008053 · Last updated on MahaRERA portal: 2 Dec 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 6 complaints at MahaRERA
- Completion date moved by 84 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SONA PARADISE is a Residential / Group Housing project by SONA ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700008053 on 18 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 84 months from the original filing. 6 complaints are on record with the regulator.
At a glance
Project
- NameSONA PARADISE
- TypeResidential / Group Housing
- Location
- Thane (M Corp.)
- Thane
- 421201
- Pincode421201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700008053
- ReraGenie IDRG-MH-44582
Builder
- NameSONA ENTERPRISES
- Entity typePartnership
- PartnerARCHANA RAJENDRAKUMAR WAGHMARE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2018)
- Buildings1 building record
- Documents filed45 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SONA PARADISE | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.
SONA PARADISE: 46% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 48% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed10
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VINAY PATIL |
| Engineer | ANAND SAWANT |
| Partner | Role in project |
|---|---|
| SONA ENTERPRISES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSona Paradise Project is a joint venture project which is on 50% - 50% basic between Land Lord and Developer. The Development Agreement and Power of Attorny is made and entered between Land Owner Smt. Vijaya Powar and M/s Sona Enterprises, Which are registered in the office of Sub-Registar, Thane, and 80% development work has been done by the developer and before the completion of project, There is hurdle to completion of 20% work by Land Owner, because The Land Owner Smt. Vijaya Powar has terminated the said Development Agreement and revokes the power Of Attorny. In such Circumstance; m/s Son
Reason as filed by the promoterDue to financial crisis of previous promoter
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 924/2016 | CIVIL COURT THANE | HEARING |
| 1737/2018 | HIGH COURT OF BOMBAY | HEARING |
| 32410/2017 | HIGH COURT OF BOMBAY | HEARING |
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000303 | Nadim Mohammed Ali Chilwan | Hasmukh Punshi Nisar, Archana waaghmare | 03/09/2017 |
| CC006000000001196 | Afroz Mohammad Ali Chilwan | Hasmukh Punshi Nisar and Archana Waghmare | 10/10/2017 |
| CC006000000000304 | Gufran Zainuddin khan | Sona Enterprises (Hasmukh punshi Nihsar/Archana Waghmare | 04/09/2017 |
| CC006000000000320 | VIJAYA POWAR | M/s.SONA ENTERPRISES | 29/08/2017 |
| CC006000000023193 | ANSARI PARVEZ QAMAR | Vijaya Powar | 02/02/2018 |
| CC006000000012510 | HASMUKH PUNSHI NISAR | HASMUKH PUNSHI NISAR | 19/12/2017 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed45
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Form B .pdf | 2 Dec 2023 |
| Certificates of CA (Form 3)File: form 3.pdf | 2 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: declaration regarding legal.pdf | 28 Nov 2023 |
| Details of encumbrances concerned to LegalFile: declaration regarding legal.pdf | 28 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5 2021-22.pdf | 28 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A_compressed.pdf | 28 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of personal intrest in RERA.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form5 2017-18.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf | 28 Nov 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 28 Nov 2023 |
| Proforma of Agreement for saleFile: Agreement.pdf | 28 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account .pdf | 28 Nov 2023 |
| Declaration in FORM BFile: form b.pdf | 19 Oct 2023 |
| Declaration in FORM BFile: form b.pdf | 19 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: archi cert.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 19_compressed.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 20_compressed.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Dec 21_compressed.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: sept 23_compressed.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold .pdf | 19 Oct 2023 |
| Certificates of CA (Form 3)File: SONA PARADISE RERA-1 form 2.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: March 2018_compressed.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: March 2018_compressed (1).pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: March 19_compressed.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: March 20_compressed.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: March 22_compressed.pdf | 19 Oct 2023 |
| Home Buyer /Allottee Grievance Redressal CellFile: Afroz Received Money for Cancer.pdf | 19 Oct 2023 |
| OtherFile: Afroz Received Money for Cancer.pdf | 19 Oct 2023 |
| OtherFile: rera New Doc 2017-09-25.pdf | 26 Sep 2017 |
| Layout approvalFile: images.pdf | 25 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: images.pdf | 25 Sep 2017 |
| Layout approvalFile: SONA021.pdf | 30 Jul 2017 |
| Building plan approvalFile: SONA APPROVAL PLAN.pdf | 30 Jul 2017 |
| PAN CardFile: images.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: SONA TITLE CERT.pdf | 30 Jul 2017 |
| Details of encumbrancesFile: SONA ENCOMBRANCE.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: SONA021.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: SONA APPROVAL PLAN.pdf | 30 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: SONA COMMENCEMENTS CERT.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: SONA FORM B.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SONA ARCHITECT FORM NO 1.pdf | 30 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGEENEEER CERT NO 2.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: ca cERTIFICATE.PDF | 30 Jul 2017 |
| Proforma of Allotment letterFile: SONA ALLOTMENT L.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 45 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SONA PARADISE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Thane (M Corp.)7,600+ in Thane
Filed coordinates, straight-line distance. 306 registered projects within 2 km.
MY CITY PHASE II CLUSTER 5 PART II
HORIZON PROJECTS PVT LTD
MY CITY PHASE II CLUSTER 5 PART III
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 3 Bldg No 27-28
Runwal Residency Private Limited
Runwal Gardens Phase 4 Bldg No. 35-36
Runwal Residency Private Limited
VASTU LUXURIA
LAUKIK DEVELOPMENT CORPORATION
KAPLESHWARA RESIDENCY
KAPLESHWARA HOMES LLP
See every Thane project, with the district possession charts
Builder: SONA ENTERPRISES
SONA ENTERPRISES has 1 registration on MahaRERA, including SONA PARADISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SONA PARADISE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SONA PARADISE is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SONA PARADISE?
The registered promoter entity is SONA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SONA PARADISE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SONA PARADISE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SONA PARADISE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SONA PARADISE?
The professionals named in the filing: Architect: VINAY PATIL; Engineer: ANAND SAWANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SONA PARADISE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback