SOM NIWAS

By Naman Developers

RG-MH-59583 · RERA P51900019850 · Last updated on MahaRERA portal: 4 Aug 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 34 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedmoved 34 months from the original
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 98%
0 of 1Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

SOM NIWAS is a Residential / Group Housing project by Naman Developers in HINDU COLONY - DADAR (EAST), 400014, registered with MahaRERA as P51900019850 on 5 Mar 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 34 months from the original filing. 9 of the 1 unit on this registration is recorded sold or booked, and 7 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSOM NIWAS
  • TypeResidential / Group Housing
  • Location
    • GM LAD ROAD
    • HINDU COLONY - DADAR (EAST)
    • 400014
  • Pincode400014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900019850
  • ReraGenie IDRG-MH-59583

Builder

  • NameNaman Developers
  • Entity typeOthers
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2019First promiseFeb 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Mar 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 23 Feb 2024)
  • Buildings1 building record
  • Documents filed132 files

Current status

900%9 of 1 units booked
98.0%Work done, per cost certificate

Figures as on 4 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Som NiwasNA2320101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.

Som Niwas: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area390 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1315.0
Proposed, not sanctioned974 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNC KELKAR ROAD KOLS GALLI DADAR WEST
Estimated costRs 13.00 cr
Cost incurredRs 12.74 cr
Work done98.0%
BuildingWingEstimatedIncurred
Som NiwasNARs 12.50 crRs 12.25 cr
-NARs 50.00 lakhRs 49.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFor Nirmeek Associates of Mr Pradeep Harachkar
Architect1 ARCHITECTURAL CONSULTANT
EngineerGopal M Bennur
EngineerBrixwell Engineering
Chartered AccountantSangoi & Sangoi
Chartered AccountantPiyush Chandulal Parvadiya

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900019694Feb 2024 → Dec 2024

Reason as filed by the promoterfinancial proble

EXT51900026044Feb 2024 → Sep 2025

Reason as filed by the promoterLABOUR & MATERIAL PROBLEM

EA05062621246Feb 2024 → Dec 2026

Reason as filed by the promoterThe Construction work of the project is completed but, the process of securing the Occupation Certificate has taken longer than anticipated due to procedural and compliance-related requirements. Given the circumstances, we kindly request an extension until 31-12-2026, to complete the project and fulfill all regulatory requirements for obtaining the Occupation Certificate.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000261974Dr. Ajit Raghunath GandbhirShri Navin V Shah proprietor19/07/2022
CC006000000261980Bharati Harish LalanNavin Shah Prop Naman Developers19/07/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - March 2026.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 - March 2026.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 - June 2026.pdf4 Aug 2026
Withdrawal Update Form 2File: Form 2 - March 2026.pdf4 Aug 2026
Withdrawal Update Form 2File: Form 2 - March 2026.pdf4 Aug 2026
Withdrawal Update Form 2File: Form 2 - June 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 - (March 2026).pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 - (March 2026).pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 - (March 2026).pdf4 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A - 2024 - 2025.pdf7 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - 2025 - 2026.pdf7 Jul 2026
Form 1File: FORM 1 JUN 25.pdf25 Feb 2026
Form 2File: Form-2 JUN 25.pdf25 Feb 2026
Form 3File: Naman_Som Niwas_Form 3_25-26_Q1.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Naman_Som Niwas_Form 3_25-26_Q1.pdf25 Feb 2026
Form 1File: FORM 1 SEP 25.pdf25 Feb 2026
Form 2File: Form 2 - Naman Developers Sep 2025.pdf25 Feb 2026
Form 3File: Naman_Som Niwas_Form 3_25-26_Q2.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Naman_Som Niwas_Form 3_25-26_Q2.pdf25 Feb 2026
Form 1File: FORM 1 MAR 25.pdf25 Feb 2026
Form 2File: FORM 2 MAR 25.pdf25 Feb 2026
Form 3File: Naman_Som Niwas_Form 3_24-25_Q4.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Naman_Som Niwas_Form 3_24-25_Q4.pdf25 Feb 2026
Form 1File: FORM 1 31 dec 2024.pdf25 Feb 2026
Form 2File: FORM 2 31 dec 2024.pdf25 Feb 2026
Form 3File: Naman_Som Niwas_Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Naman_Som Niwas_Form 3.pdf25 Feb 2026
Form 1File: FORM 1 NAMAN 300924.pdf25 Feb 2026
Form 2File: FORM 2 NAMAN 300924.pdf25 Feb 2026
Form 3File: Naman_Som Niwas_Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Naman_Som Niwas_Form 3.pdf25 Feb 2026
Form 1File: FORM 1 NAMAN 300624.pdf25 Feb 2026
Form 2File: FORM 2 NAMAN 300624.pdf25 Feb 2026
Form 3File: Naman_Som Niwas_Form 3.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Naman_Som Niwas_Form 3.pdf25 Feb 2026
Form 1File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 31-03-2024.pdf25 Feb 2026
Form 2File: Form 2 - Naman Developers - March 2024.pdf25 Feb 2026
Form 3File: CA CERTIFICAT.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: CA CERTIFICAT.pdf25 Feb 2026
Form 1File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 31-12-2023.pdf25 Feb 2026
Form 2File: Form 2 - Naman Developers - Dec 2023.pdf25 Feb 2026
Form 3File: CA CERTIFICAT.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: CA CERTIFICAT.pdf25 Feb 2026
Form 3File: CA CERTIFICAT.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: CA CERTIFICAT.pdf25 Feb 2026
Form 1File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 30-09-2023.pdf25 Feb 2026
Form 2File: Form 2 - Naman Developers - Sep 2023.pdf25 Feb 2026
Form 1File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 30-06-2023.pdf25 Feb 2026
Form 2File: Form 2 - Naman Developers - June 2023.pdf25 Feb 2026
Form 3File: CA CERTIFICAT.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: CA CERTIFICAT.pdf25 Feb 2026
Declaration in FORM BFile: Form B.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold flats .pdf13 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 31 dec 2024.pdf3 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31 dec 2024.pdf3 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 NAMAN 300624.pdf26 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 NAMAN 300924.pdf26 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 NAMAN 300624.pdf26 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 NAMAN 300924.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FOR FY 2023-24.pdf26 Oct 2024
Certificates of CA (Form 3)File: CA CERTIFICAT.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: SOLD FLAT SOM NIWAS.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf13 May 2024
Certificates of CA (Form 3)File: FORM 3 CA.pdf13 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 30-06-2023.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 30-09-2023.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 31-12-2023.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 31-03-2024.pdf10 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Naman Developers - March 2023.pdf10 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Naman Developers - June 2023.pdf10 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Naman Developers - Sep 2023.pdf10 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Naman Developers - Dec 2023.pdf10 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Naman Developers - March 2024.pdf10 May 2024
Certificates of CA (Form 3)File: Form 3 CA.pdf10 May 2024
Declaration in FORM BFile: Form B.pdf8 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf8 May 2024
Certificates of CA (Form 3)File: Form 3 .pdf8 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 30-06-2023.pdf4 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 30-09-2023.pdf4 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE- SOM HEIGHTS as on 31-12-2023.pdf4 May 2024

Keep SOM NIWAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HINDU COLONY - DADAR (EAST)

2 kmSOM NIWASCompleted 19Lapsed / revoked 10Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: Naman Developers

Naman Developers has 5 registrations on MahaRERA, including SOM NIWAS and NEELKANTH APARTMENT. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if SOM NIWAS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SOM NIWAS?

The registered promoter entity is Naman Developers, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SOM NIWAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SOM NIWAS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SOM NIWAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SOM NIWAS?

The professionals named in the filing: Architect: For Nirmeek Associates of Mr Pradeep Harachkar; Architect: 1 ARCHITECTURAL CONSULTANT; Engineer: Gopal M Bennur; Engineer: Brixwell Engineering; Chartered Accountant: Sangoi & Sangoi; Chartered Accountant: Piyush Chandulal Parvadiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOM NIWAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOM NIWAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOM NIWAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.