Completed No litigation declared Residential / Group Housing project

Solitaire Ten

By ASHOK DHANRAJ CHORDIA

RG-MH-65599 · RERA P52100045976 · Last updated on MahaRERA portal: 29 Oct 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
4 of 6Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

Solitaire Ten is a Residential / Group Housing project by ASHOK DHANRAJ CHORDIA in Pune, Maharashtra, registered with MahaRERA as P52100045976 on 15 Jun 2022. The registration is recorded completed; possession was promised by 23 Mar 2026. The completion date has moved by 12 months from the original filing. 2 of the 6 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSolitaire Ten
  • TypeResidential / Group Housing
  • Location
    • Shivajinagar
    • Bhosale Nagar
    • Peth
    • Haveli
    • Pune
    • 411016
  • Pincode411016
  • RERA no.P52100045976
  • ReraGenie IDRG-MH-65599

Builder

  • NameASHOK DHANRAJ CHORDIA
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2022First promiseMar 2025Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jun 2022
  • Promised completion23 Mar 2026
  • Revised completionRevised to 23 Mar 2026 (originally 24 Mar 2025)
  • Buildings1 building record
  • Documents filed111 files

Current status

33%2 of 6 units booked
92.3%Work done, per cost certificate

Figures as on 29 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Solitaire TenNA76606

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Solitaire Ten: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered19
Open Space19

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area506 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on21 May 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1616.0
Proposed, not sanctioned1,616 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJangli Maharaj Road, Dist Pune -411004
Estimated costRs 7.25 cr
Cost incurredRs 6.69 cr
Work done92.35%
BuildingWingEstimatedIncurred
Solitaire TenNARs 6.91 crRs 6.55 cr
-NARs 33.69 lakhRs 14.22 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKrushna Mahajan
EngineerWasim Jamdhar
Chartered AccountantRSVA & co
Chartered AccountantSPAK & Co
Chartered AccountantGMKS & Co.
PartnerRole in project
ASHOK DHANRAJ CHORDIA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027898Mar 2025 → Mar 2026

Reason as filed by the promoter1. I Ashok Dhanraj Chordia, are developing a Residential Project under the name and style “Solitaire Ten” which is registered under the Real Estate (Regulations and Development) Act, 2016 (‘RERA’) bearing Project Registration Number P52100045976 2. Despite our diligent efforts, the construction of the project has faced unavoidable delays due to delays in obtaining necessary sanctions from the relevant authorities, which was beyond our controls. These delays have significantly impacted the smooth execution of construction activities and, consequently, the timely completion of the project. 3. As

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Solitaire Ten - Mar 25.pdf29 Oct 2025
Form 2File: Form 2 - Solitaire Ten - Mar 25.pdf29 Oct 2025
Form 3File: Form 3 - Solitaire Ten - Mar 25.pdf29 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure - Solitaire Ten - Mar 25.pdf29 Oct 2025
Occupational CertificateFile: Completion Certificate.pdf29 Oct 2025
Occupational CertificateFile: Sol -10 - OC Verification email confirmation.pdf29 Oct 2025
Withdrawal Update Form 1File: Form 1- Solitaire Ten - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 2File: Form 2- Solitaire Ten - Sept 2025.pdf14 Oct 2025
Withdrawal Update Form 3File: Form 3- Solitaire Ten - Sept 2025.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: Solitaire Ten -Form 5-FY 24-25.pdf18 Sep 2025
Withdrawal Update Form 1File: Form 1 Sol Ten Jun-25.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Sol Ten Jun-25.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3 Sol Ten Jun-25.pdf19 Jul 2025
Withdrawal Update Form 1File: Form 1 - Solitaire Ten - Mar 25.pdf10 Jul 2025
Withdrawal Update Form 2File: Form 2 - Solitaire Ten - Mar 25.pdf10 Jul 2025
Withdrawal Update Form 3File: Form 3 - Solitaire Ten - Mar 25.pdf10 Jul 2025
Withdrawal Update Form 1File: Form 1 - Solitaire Ten - Mar 25.pdf21 May 2025
Withdrawal Update Form 2File: Form 2 - Solitaire Ten - Mar 25.pdf21 May 2025
Withdrawal Update Form 3File: Form 3 - Solitaire Ten - Mar 25.pdf21 May 2025
Solitaire 10 - BAR Chart29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Solitaire Ten - Mar 25.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Solitaire 10_Sep-24_Signed_page-0001 (1).pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - sol Ten- Dec 24_compressed.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Solitaire Ten - Mar 25.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Solitaire Ten - Mar 25.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Disclosure - Solitaire Ten - Mar 25.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Solitaire Ten - Mar 25.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - sol Ten- Dec 24 Singed.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sold Ten - Mar 24 - Signed.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sol Ten - Jun 24 - Signed.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate - Jun22siged.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Solitaire Ten - Sept 22.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Solitaire Ten - Dec 22.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Solitaire Ten - Mar 23.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Solitaire Ten - Jun 23.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Solitaire Ten - Sept 23.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Solitaire Ten - Dec 23.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Solitaire Ten - Mar 24.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sol Ten - Jun 24.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Solitaire Ten - Sept 24.pdf20 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Sol Ten - Mar 23.pdf20 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A - Mar 24 - Solitaire Ten.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sol Ten - Dec 23 - Singed.pdf19 Mar 2025
Declaration in FORM BFile: Form B - Solitaire ten.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - sol Ten- Dec 24 Singed.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - sol Ten- Dec 24 Singed.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Disclosure - Solitaire Ten - Dec 24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sol Ten - Jun 23.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sol Ten - Jun 24.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sold Ten - Mar 24.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sol Ten - Dec 23.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Sol Ten- Sept - 2023.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sol Ten - Mar 23.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sol Ten - Dec 22.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sol Ten - Sept - 22.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sol Ten - Dec 22.pdf4 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sol 10 Jun 23.pdf4 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Solitaire Ten- Dec 24.pdf4 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Sol Ten -Sep-22.pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Solitaire Ten - Form 5 FY 23-24.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Discloure - Sol 10 - Sept 2024.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1- Sol 10 - Jun 24.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sol 10 - Sept 24.pdf15 Oct 2024
Form 1File: Architect Certificate for RERA dtd. 31.05.2022.pdf25 Sep 2024
Form 2File: FORM 2 Engineer certificate - Jun22siged.pdf25 Sep 2024
Form 3File: Form 3 Sol Ten.pdf25 Sep 2024
Disclosure of Sold and Booked InventoryFile: Sold Disclosure Jun 22.pdf25 Sep 2024
Disclosure of sold/ booked inventoryFile: Solitaire Ten.pdf31 Jul 2024
Disclosure of sold/ booked inventoryFile: Solitaire Ten - Sold Disclosure - Mar 24.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Mar 24 - Solitaire Ten.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A - Mar 24 - Solitaire Ten.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate Sol 10.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Sol Ten Dec 23 Sold Disclosure.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A - Sol Ten - Dec 23.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: Sol ten - Sept 23 Sold Disclosure.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A- Sol Ten Sept 23.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Sol Ten FY 22-23.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sol Ten - Sept 2023.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SBH Baner II Jun 23_Done.pdf14 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sol 10 Jun 23.pdf28 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Solitaire Homes PashanP52100020848PASHAN, Pune120May 2019CompletedDec 2023Dec 2022

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Solitaire Ten on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhosale Nagar13,700+ in Pune

Builder: ASHOK DHANRAJ CHORDIA

ASHOK DHANRAJ CHORDIA has 2 registrations on MahaRERA, including Solitaire Homes Pashan and Solitaire Ten. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Solitaire Ten is delayed beyond 23 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Solitaire Ten?

The registered promoter entity is ASHOK DHANRAJ CHORDIA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Solitaire Ten?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Solitaire Ten?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Solitaire Ten?

The professionals named in the filing: Architect: Krushna Mahajan; Engineer: Wasim Jamdhar; Chartered Accountant: RSVA & co; Chartered Accountant: SPAK & Co; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Solitaire Ten?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Solitaire Ten. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Solitaire Ten to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.