Completed No litigation declared Residential / Group Housing project

Solitaire Homes Pashan

By ASHOK DHANRAJ CHORDIA

RG-MH-04873 · RERA P52100020848 · Last updated on MahaRERA portal: 13 Dec 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 164 documents Report an error

Solitaire Homes Pashan is a Residential / Group Housing project by ASHOK DHANRAJ CHORDIA in Pune, Maharashtra, registered with MahaRERA as P52100020848 on 15 May 2019. The registration is recorded completed; possession was promised by 30 Dec 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSolitaire Homes Pashan
  • TypeResidential / Group Housing
  • Location
    • PASHAN
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100020848
  • ReraGenie IDRG-MH-04873

Builder

  • NameASHOK DHANRAJ CHORDIA
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 May 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed164 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1 - 1st Floor To 5th FloorNA80000
Building 2 - 6th Floor To 12th FloorNA80000
bNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Building 1 - 1st Floor To 5th Floor91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building 2 - 6th Floor To 12th Floor91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
b91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed124

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots124
Closed/Covered124
BuildingClosed/CoveredTotal
Building 1 - 1st Floor To 5th Floor5252
Building 2 - 6th Floor To 12th Floor7272

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,200 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8617.02
Proposed, not sanctioned8,617 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDeccan Gymkhana Branch

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmit Ghate Architect
EngineerDelcon Consultants India Private Limited
Chartered AccountantSPAK And Co
Chartered AccountantRSVA
PartnerRole in project
ASHOK DHANRAJ CHORDIA-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000064467Kunal NerkarAshok Dhanraj Chordia08/08/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Dec 2024

Documents filed164

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 164 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SHP - FY 23-24 - Form 5.pdf13 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SHP - Sept 22.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SHP - Jun 2019.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -SHP - Mar 23.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SHP - Dec 22.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-SHP Pashan _ Jun 22.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-SHP Certificate.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SHP - Dec 21.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -SHP- Sept 21.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-SHP- Mar 2021.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SHP - Sept 2019.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- SHP - Dec 2019.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1- SHP -Mar 2020.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Jun 2020.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SHP - Sept 20.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SHP - Dec 2020.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -SHP- Jun 21.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3 - SHP - Jun 21.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3- SHP - Mar 23.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3 - SHP - Dec 22.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3 - SHP - Sept 22.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3-SHP Pashan _ Jun 22.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3- SHP - Mar 22.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3 - SHP - Dec 21.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3 - SHP - Sept 21.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form -3- SHP Dec -2020.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form -3- SHP Sept-2020.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form -3- SHP Jun 2020.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form -3- SHP Mar 2020.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form -3- SHP Dec- 2019.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form -3- SHP Sept-2019.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form -3- SHP Jun-2019.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3 - SHP - Mar 21.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Sept 20.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Mar 23.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Dec 22.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP - Sept 22.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP - Jun 22.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP - Mar 22.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Dec 21.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Sept 21.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Jun 21.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Mar 21.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP - Dec 20.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Jun 20.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Mar 20.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP - Dec 19.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP -Sept 19.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SHP - Jun19.pdf2 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 - Revised - SHP.pdf2 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - SHP.pdf13 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Pashan-Society Registration Certificate.pdf6 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - SHP.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: SHP Sept 23 Sold disclosure.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - SHP FY 22-23.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - SHP - Sept - 2023.pdf6 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A SHP June 23.pdf28 Jul 2023
Disclosure of sold/ booked inventoryFile: Solitaire Homes Pashan_March23.pdf12 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate SHP.pdf21 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A SHP March 2023.pdf12 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold_Disclosure_SHP_Dec_22.pdf27 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A SHP Dec-22.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: SHP_Sep_22.pdf21 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Solitaire Home Pashan.pdf30 Sep 2022
Disclosure of sold/ booked inventoryFile: SHP SOld_compressed.pdf11 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report SHP.pdf6 Aug 2022
Declaration about Commencement CertificateFile: Solitaire Homes Pashan.pdf7 Apr 2022
Declaration about Commencement CertificateFile: 13 SOLITAIRE HOMES PASHAN DEC 2021.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: SHP Building 1-2 Sold Disclosure Dec 2021.pdf8 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SHP Form 2A Mar 20.pdf8 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SHP Form 2A Mar 21.pdf8 Nov 2021
Copy of the legal title reportFile: TSR_29092021_PASHAN HOMES_compressed.pdf19 Oct 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD SHP B1.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD SHP B2.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SOLITAIRE HOMES PASHAN PROJECT.pdf30 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SHP 2A June-21.pdf9 Sep 2021
Declaration about Commencement CertificateFile: SHP 30.pdf4 Sep 2021
Declaration about Commencement CertificateFile: SHP 15.pdf4 Sep 2021
Layout approvalFile: 1.pdf2 Sep 2021
Building plan approvalFile: 2.pdf2 Sep 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Solitaire Homes Pashan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PASHAN13,700+ in Pune

Builder: ASHOK DHANRAJ CHORDIA

ASHOK DHANRAJ CHORDIA has 2 registrations on MahaRERA, including Solitaire Homes Pashan and Solitaire Ten. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Solitaire Homes Pashan is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Solitaire Homes Pashan?

The registered promoter entity is ASHOK DHANRAJ CHORDIA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Solitaire Homes Pashan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Solitaire Homes Pashan?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Solitaire Homes Pashan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Solitaire Homes Pashan?

The professionals named in the filing: Architect: Amit Ghate Architect; Engineer: Delcon Consultants India Private Limited; Chartered Accountant: SPAK And Co; Chartered Accountant: RSVA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Solitaire Homes Pashan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Solitaire Homes Pashan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Solitaire Homes Pashan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.