Home / Browse projects / Mumbai Suburban, Maharashtra / Solitaire Edge
Solitaire Edge
RG-MH-30352 · RERA P51800030831 · Last updated on MahaRERA portal: 27 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Solitaire Edge is a Others project by MAHAVEER CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030831 on 14 Sep 2021. Possession is promised by 31 Dec 2026. 91 of the 127 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameSolitaire Edge
- TypeOthers
- Location
- VILLAGE - WADHAWAN
- KANDIVALI EAST
- Borivali
- Mumbai Suburban
- 400101
- Pincode400101
- RERA no.P51800030831
- ReraGenie IDRG-MH-30352
Builder
- NameMAHAVEER CONSTRUCTION
- Entity typePartnership
- PartnerPinakin Dineshchandra Shah
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Sep 2021
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed123 files
Current status
Figures as on 27 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Solitaire Edge | NA | 43 | 32 | 126 | 1 | 127 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Solitaire Edge: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed111
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Solitaire Edge | NA | Rs 94.10 cr | Rs 84.06 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VISHWAS SATODIA |
| Engineer | M/s. STS Consultants LLP |
| Chartered Accountant | NEHALI & CO |
| Partner | Role in project |
|---|---|
| MAHAVEER CONSTRUCTION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Nov 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Nov 2023
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: From 1 Sep-25 .pdf | 27 Jun 2026 |
| Withdrawal Update Form 1File: From 1 Sep-25 .pdf | 27 Jun 2026 |
| Withdrawal Update Form 2File: From 2 Sep-25 .pdf | 27 Jun 2026 |
| Withdrawal Update Form 2File: From 2 Sep-25 .pdf | 27 Jun 2026 |
| Withdrawal Update Form 3File: Signed CA Certificate - Solitaire Edge Sept 25.pdf | 27 Jun 2026 |
| Withdrawal Update Form 3File: Signed CA Certificate - Solitaire Edge Sept 25.pdf | 27 Jun 2026 |
| Building plan approvalFile: Amended IOA 13-06-25.pdf | 11 Nov 2025 |
| Layout approvalFile: LAY SALE BLDG 2.pdf | 11 Nov 2025 |
| Withdrawal Update Form 1File: From 1 Sep-25 .pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: From 2 Sep-25 .pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: Signed CA Certificate - Solitaire Edge Sept 25.pdf | 11 Nov 2025 |
| Withdrawal Update Form 1File: 2Architect form 1.pdf | 8 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 June 2025.pdf | 8 Nov 2025 |
| Withdrawal Update Form 3File: form 3.pdf | 8 Nov 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 25.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate - Solitaire Edge Dec24.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24.pdf | 7 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-2024.pdf | 22 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate - Solitaire Edge Sept 24 (1).pdf | 15 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 24.pdf | 15 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 March 2024.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 June 24.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate.pdf | 23 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2Architect form 1.pdf | 16 Jul 2024 |
| Layout approvalFile: Plans (1)_compressed_1-2.pdf | 18 May 2024 |
| Layout approvalFile: Plans (1)_compressed_3-5.pdf | 18 May 2024 |
| Layout approvalFile: Plans (1)_compressed_6-end.pdf | 18 May 2024 |
| Copy of Layout Approval (in case of layout)File: Plans (1)_compressed_1-2.pdf | 18 May 2024 |
| Copy of Layout Approval (in case of layout)File: Plans (1)_compressed_3-5.pdf | 18 May 2024 |
| Copy of Layout Approval (in case of layout)File: Plans (1)_compressed_6-end.pdf | 18 May 2024 |
| Building plan approvalFile: IOA 02-05-2024.pdf | 17 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA 02-05-2024.pdf | 17 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC upto 32nd Floor 2 May 2024.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT-23.pdf | 9 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2 DEC-23.pdf | 9 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate - Solitaire Edge sep'23 Final.pdf | 9 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate - Solitaire Edge Dec '23 FInal.pdf | 9 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 19 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf | 19 Jan 2024 |
| Layout approvalFile: Plans _1-3.pdf | 29 Nov 2023 |
| Layout approvalFile: Plans _1-3.pdf | 29 Nov 2023 |
| Building plan approvalFile: Plans _4-6.pdf | 29 Nov 2023 |
| Layout approvalFile: Plans _7-end.pdf | 29 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Plans _1-3.pdf | 29 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Plans _1-3.pdf | 29 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Plans _7-end.pdf | 29 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plans _4-6.pdf | 29 Nov 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OCC 10 Nov 2023.pdf | 29 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Achitect Certificate 05-10-23.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 20 Apr 2023.pdf | 31 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate July 23.pdf | 31 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 MARCH 23.pdf | 31 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 JUNE 23.pdf | 31 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM -2A MARCH 23.pdf | 31 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate - Solitaire Edge Mar'23.pdf | 31 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate - Solitaire Edge june'23.pdf | 31 Jul 2023 |
| Layout approvalFile: 1.pdf | 4 Apr 2023 |
| Layout approvalFile: 2.pdf | 4 Apr 2023 |
| Layout approvalFile: 3.pdf | 4 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 4 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 2.pdf | 4 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 3.pdf | 4 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Dated 29-03-2023.pdf | 4 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 march 22.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 june 22.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 september 22.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 december 22.pdf | 11 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 april 2022.pdf | 10 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 september 2022.pdf | 10 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 december 2022.pdf | 10 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 22.pdf | 10 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 June22.pdf | 10 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Sept22.pdf | 10 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Dec22.pdf | 10 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: From 5.pdf | 10 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Solitaire Edge on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KANDIVALI EAST6,700+ in Mumbai Suburban
Sheetal Uptown
SIDHESHWAR LIFESPACES PRIVATE LIMITED
ENSO SANZA
Sai Aastha Developers
SPRINGWOODS
PRATIK CONSTRUCTION
Godrej Nest
Shivam Megastructures Pvt Ltd
PATON TOWERS
PRAVIN VIRAM SATRA
Godrej Bliss
SHIVAM DEVELOPERS
See every Mumbai Suburban project, with the district possession charts
Builder: MAHAVEER CONSTRUCTION
MAHAVEER CONSTRUCTION has 1 registration on MahaRERA, including Solitaire Edge. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Solitaire Edge is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Solitaire Edge?
The registered promoter entity is MAHAVEER CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Solitaire Edge?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Solitaire Edge?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Solitaire Edge?
The professionals named in the filing: Architect: VISHWAS SATODIA; Engineer: M/s. STS Consultants LLP; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Solitaire Edge?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.