Red flags

  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 36 months from the original
9 of 11Construction stages donefurthest along: Staircases, 92%
3 of 6Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

SOHAM SHREE is a Residential / Group Housing project by SOHAM DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100050479 on 17 Apr 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 36 months from the original filing. 3 of the 6 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSOHAM SHREE
  • TypeResidential / Group Housing
  • Location
    • BRAMHAVRUNDA COLOENY
    • BESIDE SATHE PETROL PUMP
    • Pimple Nilakh
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050479
  • ReraGenie IDRG-MH-40581

Builder

  • NameSOHAM DEVELOPERS
  • Entity typePartnership
  • GSTIN27AEPFS9214R1ZY
  • PartnersABHIJEET BANKAR, MADHUKAR BANKAR
  • Other registrations8 more →
  • Completed4 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredApr 2023First promiseDec 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed86 files

Current status

50%3 of 6 units booked
94.5%Work done, per cost certificate

Figures as on 21 Nov 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SOHAM SHREENA53606

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 92%.

SOHAM SHREE: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Open Space26

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area335 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Aug 2026
LandownerVillageDistrict
SMITA SHRIKRISHNA PARCHUREParvatiPune
SHRIKRISNA VISHWANATH PARCHUREParvatiPune
SOHAM DEVELOPERSPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI961.95
Proposed, not sanctioned577 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPPOSIT LALIT MAHAL FC ROAD PUNE
Estimated costRs 1.08 cr
Cost incurredRs 1.02 cr
Work done94.53%
BuildingWingEstimatedIncurred
SOHAM SHREENARs 1.01 crRs 95.01 lakh
-NARs 7.28 lakhRs 7.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR DAYANAND SHINDE
EngineerG A BHILARE CONSULTANTS
EngineerPrathamesh Pandurang Vaidya
Chartered AccountantV P B and Associates
Chartered AccountantANIL MARDIKAR & CO.
PartnerRole in project
SOHAM DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027448Dec 2024 → Dec 2025

Reason as filed by the promoterOur project was initially registered with a three-floor structure, with a planned extension of two additional floors above. At present, we have successfully completed 99% of the construction work for the registered three floors. We have also received part completion for the same and uploaded in the documents for your reference. However, we are awaiting the necessary sanctions and approvals for the additional two floors. Since the completion and delivery of the project, including the extended structure, is contingent upon receiving the necessary approvals, we respectfully seek an extension of t

EA19082622230Dec 2024 → Dec 2027

Reason as filed by the promoterWe, M/s. Soham Developers, the Promoter of the project "Soham Shree", hereby solemnly declare and state as under: 1. Sanctioned Plan: The basic building plan of the project was duly sanctioned by the competent authority, Pimpri Chinchwad Municipal Corporation (PCMC), vide Commencement Certificate No. बी. पी. पिंपळे निलख ५६/२०२२ dated 22/09/2022. 2. Issue regarding TDR Loading: Subsequently, at the stage of loading/utilisation of TDR for the project, certain objections have been raised by the competent authority, PCMC, regarding the proposed TDR loading. We have taken the position that the prop

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf21 Nov 2026
Withdrawal Update Form 1File: form 1.pdf21 Nov 2026
Withdrawal Update Form 1File: form 1.pdf21 Nov 2026
Withdrawal Update Form 2File: form 2.pdf21 Nov 2026
Withdrawal Update Form 2File: form 2.pdf21 Nov 2026
Withdrawal Update Form 2File: form 2.pdf21 Nov 2026
Withdrawal Update Form 3File: form 3.pdf21 Nov 2026
Withdrawal Update Form 3File: form 3.pdf21 Nov 2026
Withdrawal Update Form 3File: form 3.pdf21 Nov 2026
Form 5 (FY 2025-2026)File: Form 5 fy 25-26 soham.pdf21 Nov 2026
Form 2A (FY 2023-2024)File: FY 2023-2024 Form 2A_11zon.pdf19 Aug 2026
Form 2A (FY 2024-2025)File: FY 2024-2025 Form 2A_11zon.pdf19 Aug 2026
Form 2A (FY 2025-2026)File: FY 2025-2026 Form 2A_11zon.pdf19 Aug 2026
Form 1File: Q3 FY 25-26 Form 1.pdf14 Aug 2026
Form 2File: Q3 FY 25-26 Form 2.pdf14 Aug 2026
Form 3File: Q3 FY 25-26 Declaration no progress and form 3.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Q3 FY 25-26 sold unsold decl.pdf14 Aug 2026
Form 1File: SOHAM SHREE - FORM 1 FY25-26 Q1.pdf27 Nov 2025
Form 2File: SOHAM SHREE - FORM 2 FY25-26 Q1_compressed.pdf27 Nov 2025
Form 3File: SOHAM SHREE - FORM 3 FY25-26 Q1_compressed.pdf27 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD - FY25-26 Q1.pdf27 Nov 2025
Form 1File: SOHAM SHREE - FORM 1 FY25-26 Q2.pdf27 Nov 2025
Form 2File: SOHAM SHREE - FORM 2 FY25-26 Q2_compressed.pdf27 Nov 2025
Form 3File: SOHAM SHREE - FORM 3 FY25-26 Q2_compressed.pdf27 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD - FY25-26 Q2.pdf27 Nov 2025
Declaration in FORM BFile: Ext Form B_copy-1_compressed.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 02052025.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 02052025_compressed.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 01052025.pdf19 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 01052025.pdf19 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Letter on Soham Devlopers Letter Head 02052025.pdf19 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 01052025.pdf19 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 3_compressed.pdf19 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24 Soham Developers _compressed.pdf19 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B RERA ACCOUNT NO on Bank letter.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Q2_compressed.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Q3_compressed.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 - P1.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 - P1.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC Q2_compressed.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC Q3_compressed.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_compressed.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 01 JAN 24.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate for 01 JAN 24.pdf10 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Soham Shree CA Cert Page 1 to 4 Dt 01 FEB 24.pdf10 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Soham Shree CA Cert Page 5 to 7 Dt 01 FEB 24.pdf10 Feb 2024
Disclosure of sold/ booked inventoryFile: Soham Shree Flat Disclosure dated 30 Sept 23.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Soham Shree Form 3 CA CERT Compr 30 Sep 23.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate RERA July - Sep 2023.pdf18 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate for 30 Sept 23.pdf18 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance of SD.pdf18 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Cert Form 1 Q2 2023 Soham Shree.pdf18 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engnr Cert Form 2 Q2 2023 Soham Shree.pdf18 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Form 3 Q2 2023 Soham Shree.pdf18 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificte Soham shree.pdf11 Apr 2023
Proforma of Agreement for saleFile: AFS 31 MARCH 2023_compressed-10-18.pdf6 Apr 2023
Proforma of Agreement for saleFile: AFS 31 MARCH 2023_compressed-19-27.pdf6 Apr 2023
Proforma of Agreement for saleFile: AFS 31 MARCH 2023_compressed-28-38.pdf6 Apr 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance PN.pdf31 Mar 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance PN.pdf31 Mar 2023
Proforma of Agreement for saleFile: AFS 31 MARCH 2023_compressed-1-9.pdf31 Mar 2023
Deviation Report with respect to model copy of AgreementFile: AFS DEVIATION 31 MARCH 2023_compressed.pdf31 Mar 2023
Other - LegalFile: Disclosure of Interest ANNEXURE A AMB Soham Shree.pdf13 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Annex A MBB Soham Shree.pdf11 Feb 2023
Details of encumbrances concerned to FinanceFile: Declaration Financial Encrumbrace Soham Shree.pdf9 Feb 2023
Details of encumbrances concerned to LegalFile: Declaration Financial Encrumbrace Soham Shree.pdf9 Feb 2023
Declaration in FORM BFile: Form B Soham Developers Soham Shree.pdf9 Feb 2023
Declaration in FORM BFile: Form B Parchure Smita and Shrikrisna Soham Shree.pdf9 Feb 2023
CERSAI detailsFile: CERSAI Asset Based Search 21 12 2022 Soham Shree.pdf9 Feb 2023
Proforma of Allotment letterFile: Allotment Letter Page 1-3 Soham Shree.pdf9 Feb 2023
Proforma of Allotment letterFile: Allotment Letter Page 4-6 Soham Shree.pdf9 Feb 2023
Proforma of Allotment letterFile: Allotment Letter Annex A Soham Shree.pdf9 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Sheet Allotment Letter Soham Shree.pdf9 Feb 2023
Copy of the legal title reportFile: Title Report Flow Page 1 2 Soham Shree.pdf8 Feb 2023
Copy of the legal title reportFile: Title Report Page 1 2 Soham Shree.pdf8 Feb 2023
Copy of the legal title reportFile: Title Report Page 3 4 5 Soham Shree.pdf8 Feb 2023
Layout approvalFile: Sanctioned Plan Soham Shree.pdf15 Dec 2022
Copy of Layout Approval (in case of layout)File: Sanctioned Plan Soham Shree.pdf15 Dec 2022
Building plan approvalFile: Sanctioned Plan Soham Shree.pdf13 Dec 2022
PAN CardFile: PAN Soham Developers.pdf13 Dec 2022

How this compares with Pune

50%of this project is bookeddistrict median 29%
28%of Pune projects moved their completion datethis one moved by 36 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SOHAM SHREE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BESIDE SATHE PETROL PUMP14,000+ in Pune

2 kmSOHAM SHREECompleted 91Lapsed / revoked 36Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: SOHAM DEVELOPERS

Soham Developers has 9 registrations on MahaRERA, including OMEGA COMMERCIAL COMPLEX - SOHAM ICON and SONAL CO-OP HOUSING SOCIETY. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SOHAM SHREE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SOHAM SHREE?

The registered promoter entity is SOHAM DEVELOPERS, a partnership as per the filing. Its GSTIN 27AEPFS9214R1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SOHAM SHREE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SOHAM SHREE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SOHAM SHREE?

The professionals named in the filing: Architect: AR DAYANAND SHINDE; Engineer: G A BHILARE CONSULTANTS; Engineer: Prathamesh Pandurang Vaidya; Chartered Accountant: V P B and Associates; Chartered Accountant: ANIL MARDIKAR & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOHAM SHREE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOHAM SHREE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOHAM SHREE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.