ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SMK PRIDE

Registered No litigation declared Residential / Group Housing project

SMK PRIDE

By SMK BUILDCON LLP

RG-MH-53863 · RERA PR1260002503055 · Last updated on MahaRERA portal: 19 Aug 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedno revision filed
1 of 10Construction stages donefurthest along: Basement (if any), 50%
19 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 10 documents Report an error

SMK PRIDE is a Residential / Group Housing project by SMK BUILDCON LLP in Pune, Maharashtra, registered with MahaRERA as PR1260002503055 on 27 Mar 2026. Possession is promised by 1 Jul 2028. 5 of the 24 units on this registration are recorded sold or booked, and 1 of 10 construction stages are filed complete.

At a glance

Project

  • NameSMK PRIDE
  • TypeResidential / Group Housing
  • Location
    • Patil Nagar
    • Dehu-Alandi Road
    • Chikhali
    • Haveli
    • Pune
    • 411062
  • Pincode411062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002503055
  • ReraGenie IDRG-MH-53863

Builder

  • NameSMK BUILDCON LLP
  • Entity typeLimited Liability Partnership
  • LLPINACC-7105
  • GSTIN27AFCFS0854F1Z2
  • PartnersKETAN AJIT MAHADAR, Siddhalingappa Baburao Mangarule, UMESH SUDAM KUTTARVADE, OMKAR HANUMANT SHINDE, ABHISHEK DILIP KADAM, SHIVASHARAN SIDRAMAPPA BADADAL

Key dates

this monthRegisteredMar 2026PromisedJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Mar 2026
  • Promised completion1 Jul 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed10 files

Current status

21%5 of 24 units booked
20.9%Work done, per cost certificate

Figures as on 19 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA6424024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 10 construction stages are filed complete. The stage furthest along is Basement (if any), at 50%.

A Building: 15% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area768 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Mar 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI1857.42
Proposed, not sanctioned1,845 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.1, BIG INDIA, BIG INDIA CHOWK,PRADHIKARAN 16/27, NIGDI,PUNE - 411044, TOLL FREE NO. - 18004194332
Estimated costRs 3.73 cr
Cost incurredRs 78.09 lakh
Work done20.94%
BuildingWingEstimatedIncurred
A BuildingNARs 3.36 crRs 70.28 lakh
-NARs 37.29 lakhRs 7.81 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPG ASSOCIATES
EngineerABHISHEK DILIP KADAM
Chartered AccountantDiksha Garg & associates
PartnerRole in project
SMK BUILDCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Jul 2028

Documents filed10

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: SMK PRIDE - FORM 2 A.pdf19 Aug 2026
Withdrawal Update Form 1File: Form 1 Jun 26.pdf20 Jul 2026
Withdrawal Update Form 2File: SMK Buildcon Form 2 Jun 26 signed.pdf20 Jul 2026
Withdrawal Update Form 3File: SMK Buildcon Form 3 Jun 26 signed.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 Mar 26.pdf10 Apr 2026
Withdrawal Update Form 2File: Form 2 Mar 26 (2).pdf10 Apr 2026
Withdrawal Update Form 3File: SMK pride - form 3 Updated COMPRESSED.pdf10 Apr 2026
Layout approvalFile: SMK Pride Chikhali Issue Copy_V2 1.pdf5 Mar 2026
Building plan approvalFile: SMK Pride Chikhali Issue Copy_V2 2.pdf5 Mar 2026
Declaration and undertaking (Annexure A)File: 33 ANNEXURE - A declaration for one plot one project.pdf5 Mar 2026

How this compares with Pune

21%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SMK PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dehu-Alandi Road13,700+ in Pune

2 kmSMK PRIDECompleted 55Lapsed / revoked 27Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 119 registered projects within 2 km.

Builder: SMK BUILDCON LLP

SMK BUILDCON LLP has 1 registration on MahaRERA, including SMK PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SMK PRIDE is delayed beyond 1 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SMK PRIDE?

The registered promoter entity is SMK BUILDCON LLP, a limited liability partnership as per the filing. Its LLPIN ACC-7105 and GSTIN 27AFCFS0854F1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SMK PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SMK PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SMK PRIDE?

The professionals named in the filing: Architect: PG ASSOCIATES; Engineer: ABHISHEK DILIP KADAM; Chartered Accountant: Diksha Garg & associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SMK PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SMK PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SMK PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.