Home / Browse projects / Kolhapur, Maharashtra / SMITA APARTMENT

Completed No litigation declared Residential / Group Housing project

SMITA APARTMENT

By SMITA DEVELOPERS

RG-MH-41713 · RERA P53000047738 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
4 of 11Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SMITA APARTMENT is a Residential / Group Housing project by SMITA DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000047738 on 21 Nov 2022. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 9 months from the original filing. 7 of the 11 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSMITA APARTMENT
  • TypeResidential / Group Housing
  • Location
    • RUKMININAGAR ROAD
    • RUKMINI NAGAR
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416005
  • Pincode416005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000047738
  • ReraGenie IDRG-MH-41713

Builder

  • NameSMITA DEVELOPERS
  • Entity typePartnership
  • PartnersSHITAL CHINTAMANI SHAH, SAGAR CHINTAMANI SHAH
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2022First promiseSep 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Nov 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 18 Sep 2025)
  • Buildings1 building record
  • Documents filed74 files

Current status

64%7 of 11 units booked
94.2%Work done, per cost certificate

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SMITA APARTMENTNA8711011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

SMITA APARTMENT: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area494 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025
LandownerVillageDistrict
Shital Chintamani ShahOthersPune
Sagar Chintamani ShahOthersPune

Approvals and building plan

Sanctioning authorityKOLHAPUR MUNCIPAL CORPORATION
Permissible FSI1480.99
Proposed, not sanctioned1,481 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLALWANI PLAZA SAKORE NAGAR VIMANNGAR PUNE 411014
Estimated costRs 4.06 cr
Cost incurredRs 3.82 cr
Work done94.16%
BuildingWingEstimatedIncurred
SMITA APARTMENTNARs 4.06 crRs 3.82 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMBHAJI PATIL
EngineerVishwakarma Sudhakar
EngineerShreyas Buildcon
EngineerSarvesh Sunil Vandure Patil
Chartered AccountantSDAS AND CO
PartnerRole in project
SMITA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31012619660Sep 2025 → Jun 2026

Reason as filed by the promoterproject is ongoing construction work of the project is pending. It will required more time to complete the work and received completion certificate from Kolhapur Municipal Corporation Hence applied for extension till 30th June 2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: ORDER FULL OCCUPANCY.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf29 Jun 2026
Withdrawal Update Form 2File: SAGAR SHAH MARCH 26 FORM 2.pdf29 Jun 2026
Withdrawal Update Form 3File: Final Form 3.pdf29 Jun 2026
Form 2A (FY 2026-2027)File: 26-27 Form 2A.pdf15 Jun 2026
Building plan approvalFile: scan 0312.pdf4 May 2026
Building plan approvalFile: scan 0311.pdf4 May 2026
Building plan approvalFile: scan 0310.pdf4 May 2026
Building plan approvalFile: scan 0309.pdf4 May 2026
Withdrawal Update Form 1File: Form 1.pdf4 May 2026
Withdrawal Update Form 2File: SAGAR SHAH MARCH 26 FORM 2.pdf4 May 2026
Withdrawal Update Form 3File: SAGAR SHAH MARCH 26 FORM 2.pdf4 May 2026
Withdrawal Update Form 1File: Form 1 Dec 2025.pdf1 May 2026
Withdrawal Update Form 2File: Form 2 Dec 2025.pdf1 May 2026
Withdrawal Update Form 3File: Form 3 Dec 2025.pdf1 May 2026
Form 2A (FY 2025-2026)File: Form 2.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: sold Unsold Inventory March 2025.pdf31 Jan 2026
Form 1File: Form 1 March 2025.pdf31 Jan 2026
Form 2File: Form 2 March 2025.pdf31 Jan 2026
Form 3File: Form 3 March 2025.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1 June 2025.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1 sep 2025.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2 June 2025.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2 June 2025.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3 June 2025.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3 Sep 2025.pdf31 Jan 2026
Form 2A (FY 2022-2023)File: Form 2A 2023.pdf30 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf30 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A 2025.pdf30 Jan 2026
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf30 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf30 Jan 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2Engineers Certificate On Qualilty.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - June'24.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - March'24.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Sept'24.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Dec'24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Dec'23.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - June'24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - March'24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Sept'24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Dec'24.pdf14 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate - Form 5 - FY 2023-24.pdf14 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer's Certificate For Quality Assurance.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate (ANNEXURE - A).pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf20 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-1.pdf28 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-2.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Artchitect certificate.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf8 Nov 2022
CERSAI detailsFile: CERSAI.pdf18 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Letter- Allotment.pdf11 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Letter -Agreement.pdf11 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Agreement to sale.pdf11 Oct 2022
Declaration in FORM BFile: Declaration Promoter Form B.pdf7 Oct 2022
Declaration in FORM BFile: DEVELOPMENT AGREEMENT-SMITA DEVELOPERS.pdf7 Oct 2022
CERSAI detailsFile: CERSAI Report.pdf7 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About seprate bank Account.pdf7 Oct 2022
Layout approvalFile: Layout plan.pdf27 Sep 2022
Building plan approvalFile: SANCTION PLAN -SMITA DEVELOPERS.pdf27 Sep 2022
PAN CardFile: Pan Card.pdf27 Sep 2022
Copy of the legal title reportFile: Legal Titel Report Format A of Cir 28-2021.pdf27 Sep 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate for Finance.pdf27 Sep 2022
Details of encumbrances concerned to LegalFile: Legale Encumbrance.pdf27 Sep 2022
Copy of Layout Approval (in case of layout)File: Layout plan.pdf27 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN -SMITA DEVELOPERS.pdf27 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-SMITA DEVELOPERS.pdf27 Sep 2022
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf27 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf27 Sep 2022
Proforma of Agreement for saleFile: MODEL FORM ALLOTMENT LETTER1.pdf27 Sep 2022
Proforma of Allotment letterFile: MODEL FORM ALLOTMENT LETTER1.pdf27 Sep 2022
Deviation Report with respect to Allotment letterFile: MODEL FORM ALLOTMENT LETTER.pdf27 Sep 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
HARMONYSR NO 22 VADGAONSHERI PUNE 41101411CompletedMay 2020May 2020

How this compares with Kolhapur

64%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one moved by 9 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep SMITA APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RUKMINI NAGAR880+ in Kolhapur

2 kmSMITA APARTMENTCompleted 48Lapsed / revoked 22Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: SMITA DEVELOPERS

SMITA DEVELOPERS has 1 registration on MahaRERA, including SMITA APARTMENT. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if SMITA APARTMENT is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SMITA APARTMENT?

The registered promoter entity is SMITA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SMITA APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SMITA APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SMITA APARTMENT?

The professionals named in the filing: Architect: SAMBHAJI PATIL; Engineer: Vishwakarma Sudhakar; Engineer: Shreyas Buildcon; Engineer: Sarvesh Sunil Vandure Patil; Chartered Accountant: SDAS AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SMITA APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SMITA APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SMITA APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.