ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / SKYLINE

Registration lapsed No litigation declared Residential / Group Housing project

SKYLINE

By ARIHANT BUILDERS AND DEVELOPERS

RG-MH-28666 · RERA P51900029610 · Last updated on MahaRERA portal: 13 Jul 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

SKYLINE is a Residential / Group Housing project by ARIHANT BUILDERS AND DEVELOPERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900029610 on 11 Jun 2021. Possession was promised by 31 Mar 2024 and is now 31 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSKYLINE
  • TypeResidential / Group Housing
  • Location
    • JUNCTION OF R.N BHAINKAR MARG AND SARASWATIBAI JOSHI MARG
    • DADAR WEST
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900029610
  • ReraGenie IDRG-MH-28666

Builder

  • NameARIHANT BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersRAHUL DHIRAJ GALA, KAVIT RAMESH CHHEDA, MANOJ DEVCHAND SHAH, VARUN MAHENDRA CHHEDA, RASIK KUNVERJI CHHEDA, ANIKET MAHENDRA CHHEDA, RUBIN KEKIN CHHEDA
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

31 months past promisethis monthRegisteredJun 2021First promiseMar 2023Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Jun 2021
  • Promised completion31 Mar 2024
  • Revised completionRevised to 31 Mar 2024 (originally 31 Mar 2023)
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SKYLINENA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

SKYLINE: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 13 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes25%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area303 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
GURUKRUPA CO OP HSG SOC-Mumbai City
MCGMMumbai CityMumbai City

Approvals and building plan

Permissible FSI2337.0
Proposed, not sanctioned2,312 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUSTAFA BAZAR ,VICTORIA ROAD, BYCULLA

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND SAMEL OF MS 1 ARCHITECTURAL CONSULTANT
ArchitectAR PAYAL VARMA AR MIHIR N BHATT
EngineerPRAVIN GALA CONSULTANTS PVT.LTD.
EngineerBrixwell Engineering
Chartered AccountantDarshan Bheda and Associates
Chartered AccountantVMDT & ASSOCIATES LLP
PartnerRole in project
ARIHANT BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900013813Mar 2023 → Mar 2024

Reason as filed by the promoterDue to Covid-19 restriction the work was held up. We are eligible under DCPR 2034 regulations resulting three additional floors above the initial approval. Accordingly we applied for the same and received the nod from authority in November, 22. Further Commencement Certificate is issued on 23/01/2023 for above three floors which is valid up to one year.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jul 2024

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC 27-05-2024.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE Arihant as on 3-2-2023.pdf8 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE 02-02-24.pdf8 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Bamboat Chawl - Sep 2023.pdf8 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arihant - Skyline.pdf8 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Arihant Mar, 23.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Arihant Mar, 23.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Arihant Mar, 23.PDF25 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report 31-03-2023 Skyline.PDF26 Sep 2023
Layout approvalFile: IOD Drwg dt 04-11-2022 - P1.pdf25 Apr 2023
Layout approvalFile: IOD Drwg dt 04-11-2022 - P2.pdf25 Apr 2023
Layout approvalFile: IOD Drwg dt 04-11-2022 - P3.pdf25 Apr 2023
Layout approvalFile: IOD Report dated 4-11-2022.pdf25 Apr 2023
Copy of Layout Approval (in case of layout)File: IOD Drwg dt 04-11-2022 - P1.pdf25 Apr 2023
Copy of Layout Approval (in case of layout)File: IOD Drwg dt 04-11-2022 - P2.pdf25 Apr 2023
Copy of Layout Approval (in case of layout)File: IOD Drwg dt 04-11-2022 - P3.pdf25 Apr 2023
Copy of Layout Approval (in case of layout)File: IOD Report dated 4-11-2022.pdf25 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC upto 25 Floor 23-01-2023.pdf25 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Skyline- Dec, 2022.pdf25 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Skuline- Dec 2022.pdf25 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Skyline - Dec, 2022.pdf25 Apr 2023
Declaration about Commencement CertificateFile: Declaration of CC 2nd.PDF18 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.PDF18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2021-22.pdf18 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certificate.pdf18 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details.PDF18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE as on 3-2-2023.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - ABD Sep 2022.pdf15 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - ABD September, 22.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf30 Sep 2022
Other - FinanceFile: Form 5 FY 2021-22.pdf30 Sep 2022
Layout approvalFile: IOD Plan 20052022 (1).pdf27 Jul 2022
Layout approvalFile: IOD Plan 20052022 (2).pdf27 Jul 2022
Layout approvalFile: IOD Plan 20052022 (3).pdf27 Jul 2022
Copy of Layout Approval (in case of layout)File: IOD Plan 20052022 (1).pdf27 Jul 2022
Copy of Layout Approval (in case of layout)File: IOD Plan 20052022 (2).pdf27 Jul 2022
Copy of Layout Approval (in case of layout)File: IOD Plan 20052022 (3).pdf27 Jul 2022
Building plan approvalFile: IODCertificate20052022.pdf21 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: IODCertificate20052022.pdf21 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ABD Architects Certificate.pdf21 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ABD March 2022.pdf21 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate ABD.pdf21 Jul 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf14 Feb 2022
Layout approvalFile: scan-27.pdf12 Feb 2022
Layout approvalFile: scan-26.pdf12 Feb 2022
Layout approvalFile: scan-28.pdf12 Feb 2022
Copy of Layout Approval (in case of layout)File: scan-27.pdf12 Feb 2022
Copy of Layout Approval (in case of layout)File: scan-26.pdf12 Feb 2022
Copy of Layout Approval (in case of layout)File: scan-28.pdf12 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Feb 2022
Building plan approvalFile: Amended IOD 4 Report dt 19082021.pdf11 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD 4 Report dt 19082021.pdf11 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf11 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 20012022.pdf11 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 22012022.pdf11 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200230050689_For_Asset_Based_Search_11_02_2022_14_53_16_272.pdf11 Feb 2022
Layout approvalFile: IOD Plan for RERA- Pg 1.pdf1 Jun 2021
Layout approvalFile: IOD Plan for RERA- Pg 2.pdf1 Jun 2021
Copy of the legal title reportFile: Title Certificate.pdf1 Jun 2021
Copy of the legal title reportFile: Search Report for 30 years_compressed.pdf1 Jun 2021
Copy of Layout Approval (in case of layout)File: IOD Plan for RERA- Pg 1.pdf1 Jun 2021
Copy of Layout Approval (in case of layout)File: IOD Plan for RERA- Pg 2.pdf1 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- ARCHITECT CERTIFICATE.pdf1 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Eng certificate.pdf1 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf1 Jun 2021
Proforma of Allotment letterFile: FINAL DRAFT AGREEMENT FOR SALE.pdf27 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf24 Apr 2021
Proforma of Allotment letterFile: Allotment Letter.pdf24 Apr 2021
Building plan approvalFile: IOD.pdf22 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf22 Apr 2021
Details of encumbrancesFile: encumrance letter.pdf16 Apr 2021
Building plan approvalFile: IOD 9-11-2017.pdf18 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: IOD 9-11-2017.pdf18 Nov 2020
Declaration in FORM BFile: Arihant Affidavit Notorized.pdf18 Nov 2020
PAN CardFile: ARIHANT PAN CARD.pdf10 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: 2242183_FurtherCC_signed.pdf10 Oct 2020

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 12 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKYLINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DADAR WEST780+ in Mumbai City

2 kmSKYLINECompleted 60Lapsed / revoked 52Other 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 203 registered projects within 2 km.

Builder: ARIHANT BUILDERS AND DEVELOPERS

ARIHANT BUILDERS AND DEVELOPERS has 3 registrations on MahaRERA, including ARIHANT RESIDENCY and Rajeshwar Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that SKYLINE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SKYLINE is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKYLINE?

The registered promoter entity is ARIHANT BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKYLINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKYLINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKYLINE?

The professionals named in the filing: Architect: MILIND SAMEL OF MS 1 ARCHITECTURAL CONSULTANT; Architect: AR PAYAL VARMA AR MIHIR N BHATT; Engineer: PRAVIN GALA CONSULTANTS PVT.LTD.; Engineer: Brixwell Engineering; Chartered Accountant: Darshan Bheda and Associates; Chartered Accountant: VMDT & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKYLINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKYLINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKYLINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.