SKYLIGHTS
RG-MH-12097 · RERA P52100003645 · Last updated on MahaRERA portal: 22 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 78 complaints at MahaRERA
- Completion date moved by 38 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SKYLIGHTS is a Residential / Group Housing project by RAVINANDA LANDMARKS in Pune, Maharashtra, registered with MahaRERA as P52100003645 on 6 Aug 2017. Possession is promised by 28 Feb 2027. The completion date has moved by 38 months from the original filing. 78 complaints are on record with the regulator.
At a glance
Project
- NameSKYLIGHTS
- TypeResidential / Group Housing
- Location
- Off Bavadi Road
- Wagholi
- Haveli
- Pune
- 412207
- Pincode412207
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100003645
- ReraGenie IDRG-MH-12097
Builder
- NameRAVINANDA LANDMARKS
- Entity typePartnership
- PartnersSAMEER RAVINDRA JAIN, DILIP PUKHRAJ KANSTIYA
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Aug 2017
- Promised completion28 Feb 2027
- Revised completionRevised to 28 Feb 2027 (originally 30 Dec 2023)
- Buildings8 building records
- Documents filed228 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROW HOUSE 2 | NA | 2 | 0 | 0 | 0 | 0 |
| D WING | NA | 16 | 0 | 0 | 0 | 0 |
| E WING | NA | 16 | 0 | 0 | 0 | 0 |
| C WING | NA | 16 | 0 | 0 | 0 | 0 |
| F WING | NA | 16 | 0 | 0 | 0 | 0 |
| G WING | NA | 17 | 0 | 0 | 0 | 0 |
| ROW HOUSE 3 | NA | 2 | 0 | 0 | 0 | 0 |
| ROW HOUSE 1 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 22 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Internal walls, at 98%.
ROW HOUSE 20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D WING60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
E WING99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
C WING99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
F WING42%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
G WING27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE 10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 80% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 20% |
| Solid Waste Management And Disposal | Yes | 20% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 80% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 60% |
| Open Parking | Yes | 40% |
Parking filed603
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| ROW HOUSE 2 | 0 | 1 | 1 |
| D WING | 30 | 90 | 120 |
| E WING | 30 | 90 | 120 |
| C WING | 30 | 90 | 120 |
| F WING | 30 | 90 | 120 |
| G WING | 30 | 90 | 120 |
| ROW HOUSE 3 | 0 | 1 | 1 |
| ROW HOUSE 1 | 0 | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Ganesh Satav | WAGHOLI | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Cubix Architect And Associate |
| Engineer | STUCTURE VIZION |
| Chartered Accountant | P B SHAH |
| Partner | Role in project |
|---|---|
| RAVINANDA LANDMARKS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe kindly request an extension for our project due to its substantial size and complexity, coupled with challenges in securing adequate labor and resources. Your understanding and support in this matter would be greatly appreciated.
Reason as filed by the promoter1. Project is 65% completed 2. Consent of 52.70% allottees uploaded in Application 3. The Revised Form B is uploaded in Other tab No. 1 and also in the main Application 4. PERT Chart for the remaining completion work is uploaded in Other Tab No. 2 and also in Other Technical Tab of the Main Application 5. Explanatory Note for Delay in project Completion Uploaded in Other Tab No. 3 and project will be completed by 28/02/2027 6. QPR till dates are updated
Complaints filed with MahaRERA78
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000106532 | Surendra Yadav and Shraddha Yadav | Ravindra Landmarks, Mr. Sameer Ravindra Jain, Mr. Dilip Pukhraj Kanstiya, & Mr. Devesh Ravindra | 22/01/2022 |
| CC005000000167564 | Vijay Nikam | RAVINANDA LANDMARKS | 14/09/2022 |
| CC005000000167555 | Harshal Patil | RAVINANDA LANDMARKS | 12/09/2022 |
| CC005000000167565 | Mohseen Mujahid | RAVINANDA LANDMARKS | 13/09/2022 |
| CC005000000167593 | Shekhar Ratate | RAVINANDA LANDMARK | 20/09/2022 |
| CC005000000167581 | Indrajeet Dikonda | RAVINANDA LANDMARKS | 25/09/2022 |
| CC005000000167619 | Nitesh Gaikwad | RAVINANDA LANDMARKS | 24/09/2022 |
| CC005000000167608 | Amol Shinde | RAVINANDA LANDMARKS | 21/09/2022 |
| CC005000000167588 | Neeraj Sinha | RAVINANDA LANDMARKS | 17/09/2022 |
| CC005000000167609 | Javed Sayyed | RAVINANDA LANDMARKS | 21/09/2022 |
| CC005000000167617 | Kailash Raut | RAVINANDA LANDMARKS | 26/09/2022 |
| CC005000000167589 | Aashish Chaudhari | RAVINANDA LANDMARKS | 19/09/2022 |
| CC005000000167618 | RAKESH RAINA | RAVINANDA SKYLIGHTS | 23/09/2022 |
| CC005000000167623 | VARUN CHAVAN | RAVINANDA LANDMARKS | 24/09/2022 |
| CC005000000167635 | MAHESHKUMAR MORE | RAVINANDA LANDMARKS | 29/09/2022 |
| CC005000000167639 | SACHIN RANDIVE | RAVINANDA LANDMARKS | 02/10/2022 |
| CC005000000167643 | NIKHIL JAWKAR | RAVINANDA LANDMARKS | 01/10/2022 |
| CC005000000177650 | PRASHANT PATEL | RAVINANDA LANDMARKS | 08/10/2022 |
| CC005000000177693 | Santosh Namdeo kambale | Mr. Sameer Jain | 07/02/2023 |
| CC005000000177755 | JAYSHRI THOMBARE | RAVINANDA LANDMARKS | 14/11/2022 |
| CC005000000177733 | AJAY KUMAR SINGH | RAVINANDA LANDMARKS | 02/11/2022 |
| CC005000000177737 | CHAITANYA SALVE | RAVINANDA LANDMARKS | 10/11/2022 |
| CC005000000177730 | RAHULDEV PATIL | RAVINANDA LANDMARKS | 31/10/2022 |
| CC005000000177756 | NILIMA KARANDIKAR | RAVINANDA LANDMARKS | 05/11/2022 |
| CC005000000177763 | YOGESH NILANGEKAR | RAVINANDA LANDMARKS | 09/11/2022 |
| CC005000000177836 | Bhavisha Gosai | RAVINANDA LANDMARKS | 23/11/2022 |
| CC005000000177839 | PRAVEEN SHUKLA | RAVINANDA LANDMARKS | 29/11/2022 |
| CC005000000177877 | Subhash Ganpat Kemse | Sameer Jain | 03/02/2023 |
| CC005000000208215 | Chandrakant Vilasrao Awate | Sameer Jain | 02/02/2023 |
| CC005000000208255 | Tushar Sadashiv Ghate | Sameer Jain | 09/02/2023 |
| CC005000000208225 | Pravin Subhash Chandankar | Sameer Jain | 03/02/2023 |
| CC005000000208228 | Hari Singh Dalawat | Sameer Jain | 06/02/2023 |
| CC005000000208248 | Sandeep Kumar Singh | Sameer Jain | 06/02/2023 |
| CC005000000208234 | Gagandeep Gagandeep | Sameer Jain | 07/02/2023 |
| CC005000000208254 | Shruti Prafulla Thakkar | Sameer Jain | 08/02/2023 |
| CC005000000208261 | Santosh Kumar | Sameer Jain | 09/02/2023 |
| CC005000000208268 | Suraj Bindroo | Sameer Jain | 08/02/2023 |
| CC005000000208280 | Mahesh Dnyaneshwar Gawade | Sameer Jain | 10/02/2023 |
| CC005000000208285 | Gaurav Rajendra Rane | Sameer Jain | 10/02/2023 |
| CC005000000228324 | Manisha Srichand Idnani | Sameer Jain | 15/02/2023 |
| CC005000000228336 | Akash Ghate | Sameer Jain | 20/02/2023 |
| CC005000000228349 | Sarita Sachin Mahamuni | Sameer Jain | 22/02/2023 |
| CC005000000228363 | Prabhakar Devikar | Sameer Jain | 25/02/2023 |
| CC005000000228383 | Niraj Kumar Singh | Sameer Jain | 15/03/2023 |
| CC005000000228490 | Eknath Ganpat Visave | RAVINANDA LANDMARKS | 12/03/2023 |
| CC005000000238576 | Amit Anandkumar Upadhyay | Samir Jain | 29/03/2023 |
| CC005000000238584 | ARCHANA ANAND ZADE | RAVINANDA LANDMARKS | 30/03/2023 |
| CC005000000238544 | HEMANT BHOSALE | RAVINANDA LANDMARKS | 26/03/2023 |
| CC005000000238574 | Kewal Krishan Bali | Sameer Jain | 29/03/2023 |
| CC005000000238656 | ROHIT NITIN BHAVAR | RAVINANDA LANDMARKS | 07/04/2023 |
| CC005000000258885 | SHUBHENDRA PATHAK | RAVINANDA LANDMARKS | 17/06/2023 |
| CC005000000258874 | SAVITA BHALERAO | RAVINANDA LANDMARKS | 07/06/2023 |
| CC005000000259159 | ASHWINI PRADIP MHETRE | RAVINANDA LANDMARKS | 19/07/2023 |
| CC005000000259165 | Hanmant Shankar Adalinge | M/S. RAVINANDA LANDMARKS | 21/07/2023 |
| CC005000000259255 | UTSAV SINGH | RAVINANDA LANDMARKS | 22/08/2023 |
| CC005000000269348 | SANKET TANDALE | RAVINANDA LANDMARKS | 28/08/2023 |
| CC005000000269576 | PARESH PATIL | RAVINANDA LANDMARKS | 11/10/2023 |
| CC005000000269619 | Mayuri Madhukar Kale | Ravinanda landmarks, a Partnership Firm registered under The Indian Partnership Act, 1932 through | 06/04/2024 |
| CC005000000279874 | TRISHNA SHARMA | RAVINANDA LANDMARKS | 19/12/2023 |
| CC005000000279950 | KHAN AFZANA PARVEEN YUSUF | RAVINANDA LANDMARKS | 28/12/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 28 Feb 2027
Documents filed228
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 228 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: Skylight Form 3 March 23.pdf | 22 Apr 2025 |
| Certificates of CA (Form 3)File: Skylight Form 3 June 23.pdf | 22 Apr 2025 |
| Certificates of CA (Form 3)File: Skylight Form 3 Sept 23.pdf | 22 Apr 2025 |
| Certificates of CA (Form 3)File: Skylight Form 3 March 24.pdf | 22 Apr 2025 |
| Certificates of CA (Form 3)File: Skylight Form 3 June 24.pdf | 22 Apr 2025 |
| Certificates of CA (Form 3)File: Skylight Form 3 Sept 2024.pdf | 22 Apr 2025 |
| Certificates of CA (Form 3)File: Skylight Form 3 Dec 2024.pdf | 22 Apr 2025 |
| Certificates of CA (Form 3)File: Skylight Form 3 March 25.pdf | 22 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Skylight FORM 1 MARCH 2025.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Mar 18.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Mar 25.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Dec 24.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: Skylight Form 3 Sept 24.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Jun 24.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Mar 24.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Sept 23.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: Skylight Form 3 June 2023.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Mar 23.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Mar 22.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Mar 21.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Mar 20.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: skylights Form 3 Mar 19.pdf | 19 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Skylights Form 2 Dated Mar 25.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Skylight sold Unsold Mar 25 (3).pdf | 19 Apr 2025 |
| Other - TechnicalFile: Pert Chat Skylight.pdf | 19 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Ravinanda Landmarks FY 2023-24.pdf | 19 Apr 2025 |
| Proforma of Agreement for saleFile: SKYLIGHTS DRAFT 1.pdf | 9 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Affidavit cum Declaration.pdf | 12 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-03-2019.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2018.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2024.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-12-2024.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 29-06-2024.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-03-2024.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-12-2023.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2023.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-06-2023.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2023.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2022.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2021.pdf | 8 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2020.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-2024.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-2019.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-09-2024.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-06-2024.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-06-2024.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-2024.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-2023.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-09-2023.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-06-2023.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-2023.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-2022.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-2021.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-2020.pdf | 8 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-2018.pdf | 8 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 23-24.pdf | 8 Mar 2025 |
| Layout approvalFile: 1-2.pdf | 7 Mar 2024 |
| Building plan approvalFile: 2.pdf | 7 Mar 2024 |
| Building plan approvalFile: 3.pdf | 7 Mar 2024 |
| Building plan approvalFile: 4.pdf | 7 Mar 2024 |
| Building plan approvalFile: 5.pdf | 7 Mar 2024 |
| Building plan approvalFile: 6.pdf | 7 Mar 2024 |
| Building plan approvalFile: 7.pdf | 7 Mar 2024 |
| Building plan approvalFile: 8.pdf | 7 Mar 2024 |
| Building plan approvalFile: 9.pdf | 7 Mar 2024 |
| Building plan approvalFile: 10.pdf | 7 Mar 2024 |
| Building plan approvalFile: 11.pdf | 7 Mar 2024 |
| Building plan approvalFile: 12.pdf | 7 Mar 2024 |
| Building plan approvalFile: 13.pdf | 7 Mar 2024 |
| Building plan approvalFile: 14-1.pdf | 7 Mar 2024 |
| Building plan approvalFile: 15.pdf | 7 Mar 2024 |
| Building plan approvalFile: 16.pdf | 7 Mar 2024 |
| Building plan approvalFile: 17.pdf | 7 Mar 2024 |
| Building plan approvalFile: 18.pdf | 7 Mar 2024 |
| Building plan approvalFile: 19.pdf | 7 Mar 2024 |
| Building plan approvalFile: 20.pdf | 7 Mar 2024 |
| Building plan approvalFile: 21.pdf | 7 Mar 2024 |
| Building plan approvalFile: 22.pdf | 7 Mar 2024 |
| Building plan approvalFile: 23.pdf | 7 Mar 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SKY LIGHTS A - B WING | WAGHOLI | 180 | Completed | Dec 2017 | Jul 2017 |
| GEMINI RIVERFRONT | AUNDH | 18 | Completed | Aug 2011 | Late, Aug 2013 |
| GEMINI PARK AVENUE | NIBM ROAD | 148 | Completed | Mar 2011 | Late, Jul 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 228 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SKYLIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wagholi13,700+ in Pune
Filed coordinates, straight-line distance. 134 registered projects within 2 km.
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: RAVINANDA LANDMARKS
RAVINANDA LANDMARKS has 1 registration on MahaRERA, including SKYLIGHTS. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SKYLIGHTS is delayed beyond 28 Feb 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SKYLIGHTS?
The registered promoter entity is RAVINANDA LANDMARKS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SKYLIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SKYLIGHTS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SKYLIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SKYLIGHTS?
The professionals named in the filing: Architect: Cubix Architect And Associate; Engineer: STUCTURE VIZION; Chartered Accountant: P B SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SKYLIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback