ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Skyi Iris, RaceCourse Phase I

Registered No litigation declared Residential / Group Housing project

Skyi Iris, RaceCourse Phase I

By Enerrgia Skyi Landmarks

RG-MH-99495 · RERA P52100052969 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 33%
40 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Skyi Iris, RaceCourse Phase I is a Residential / Group Housing project by Enerrgia Skyi Landmarks in Pune, Maharashtra, registered with MahaRERA as P52100052969 on 6 Oct 2023. Possession is promised by 30 Jun 2027. 0 of the 40 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSkyi Iris, RaceCourse Phase I
  • TypeResidential / Group Housing
  • Location
    • Wanawadi
    • wanwadi
    • Haveli
    • Pune
    • 411040
  • Pincode411040
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052969
  • ReraGenie IDRG-MH-99495

Builder

  • NameEnerrgia Skyi Landmarks
  • Entity typePartnership
  • PartnerAmit Anil Jagtap
  • Other registrations3 more →

Key dates

this monthRegisteredOct 2023PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Oct 2023
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Current status

0%0 of 40 units booked
2.5%Work done, per cost certificate

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower BNA111040040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 33%.

Tower B: 30% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor33%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered80

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,990 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
JayprakashJagannath aliasJagnnathraoGirmePune (M Corp.)Pune
Nandkumar Jagannath alias Jagnnathrao GirmeSolapur (M Corp.)Solapur

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI6175.12
Proposed, not sanctioned5,175 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandarkar Road Pune
Estimated costRs 16.78 cr
Cost incurredRs 42.00 lakh
Work done2.5%
BuildingWingEstimatedIncurred
Tower BNARs 14.87 cr-
-NARs 1.91 crRs 42.00 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANA Consortium Pvt Ltd
ArchitectDhananjay S Deshmukh
ArchitectSPCM & ASSOCIATES
EngineerSandeep Rangdal & Asso
EngineerSandip Rangdal & Assoociates
Chartered AccountantR V Porval and Associates
Chartered AccountantA S Jinturkar & Co
PartnerRole in project
Enerrgia Skyi Landmarks-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1-Arch Certificate-310326-Skyi Iris AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 1File: FORM 1-Arch Certificate-310326-Skyi Iris AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 1File: FORM 1-Arch Certificate-310326-Skyi Iris AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 1File: FORM 1-Arch Certificate-310326-Skyi Iris AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: FORM 2-Engg Certificate 310326-Skyi Iris AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: FORM 2-Engg Certificate 310326-Skyi Iris AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: FORM 2-Engg Certificate 310326-Skyi Iris AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: FORM 2-Engg Certificate 310326-Skyi Iris AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: FORM 3-Skyi IRIS Racecourse Phase I AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: FORM 3-Skyi IRIS Racecourse Phase I AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: FORM 3-Skyi IRIS Racecourse Phase I AS ON MARCH 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: FORM 3-Skyi IRIS Racecourse Phase I AS ON MARCH 2026.pdf25 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKYI IRIS- RACECOURSE PHASE I-Form 1.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Skyi Iris-Racecourse Phase I.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKYI IRIS- RACECOURSE PHASE I-Form 2.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: skyi lris Racecourse I-B.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-IRIS Build B.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Skyi Iris Racecourse Phase I.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-IRIS Build B.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Iris Racecourse.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5-ESL-Iris-Phase I.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: Iris Racecourse.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate-Skyi Iris Racecource PH I.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate-Skyi Iris Racecourse PH I.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Skyi Iris Racecourse Phase I.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Iris Racecourse-sold details.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form2-Skyi Iris- Building B Architect Certificate.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form1-Skyi Iris-Building B Engg Certificate.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 IRIS Racecourse Phase I.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Skyi Iris PH-1 From 1 Arch Certifcate 31-12-23.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Skyi Iris PH 1 Form 2 Engg Certificate 31-12-23.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Skyi Irirs Racecource Form 3.pdf22 Jan 2024
Details of encumbrances concerned to FinanceFile: Skyi Iris-Mortgage Deed.pdf4 Dec 2023
Details of encumbrances concerned to LegalFile: Skyi Iris-Mortgage Deed.pdf4 Dec 2023
Proforma of Agreement for saleFile: RC2.pdf4 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12_Form_3 CA Certificate_IRIS Building B.pdf19 Sep 2023
Proforma of Agreement for saleFile: AFS Racecourse.pdf16 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate bank account.pdf16 Sep 2023
Deviation Report with respect to Allotment letterFile: Allotment Deviation.pdf16 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation-Racecourse.pdf16 Sep 2023
Building plan approvalFile: Elevation.pdf15 Sep 2023
Building plan approvalFile: Floor Plan.pdf15 Sep 2023
Building plan approvalFile: Parking Floor Plan.pdf15 Sep 2023
Building plan approvalFile: Section.pdf15 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Declaration.pdf15 Sep 2023
Details of encumbrances concerned to LegalFile: Encumbrance Declaration.pdf15 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Elevation.pdf15 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan.pdf15 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Parking Floor Plan.pdf15 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Section.pdf15 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter.pdf15 Sep 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf15 Sep 2023
Declaration in FORM BFile: Promoter Declaration.pdf15 Sep 2023
CERSAI detailsFile: Cersai Undertaking.pdf15 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Other organisation.pdf15 Sep 2023
Proforma of Allotment letterFile: Allotment Letter.pdf15 Sep 2023
Layout approvalFile: Layout.pdf12 Sep 2023
PAN CardFile: PAN_ESLandmarks.pdf12 Sep 2023
Copy of the legal title reportFile: Legal Title Report.pdf12 Sep 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf12 Sep 2023

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Skyi Iris, RaceCourse Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wanawadi13,700+ in Pune

2 kmSkyi Iris, RaceCourse PhCompleted 16Lapsed / revoked 9Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: Enerrgia Skyi Landmarks

Enerrgia Skyi Landmarks has 4 registrations on MahaRERA, including Skyi Iris, RaceCourse Phase I and 5 RaceCourse By Skyi Phase I. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Skyi Iris, RaceCourse Phase I is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Skyi Iris, RaceCourse Phase I?

The registered promoter entity is Enerrgia Skyi Landmarks, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Skyi Iris, RaceCourse Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Skyi Iris, RaceCourse Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Skyi Iris, RaceCourse Phase I?

The professionals named in the filing: Architect: ANA Consortium Pvt Ltd; Architect: Dhananjay S Deshmukh; Architect: SPCM & ASSOCIATES; Engineer: Sandeep Rangdal & Asso; Engineer: Sandip Rangdal & Assoociates; Chartered Accountant: R V Porval and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Skyi Iris, RaceCourse Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skyi Iris, RaceCourse Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skyi Iris, RaceCourse Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.