Home / Browse projects / Pune, Maharashtra / One Place

Registration lapsed No litigation declared Commercial project

One Place

By U D Developers LLP

RG-MH-53805 · RERA P52100016297 · Last updated on MahaRERA portal: 24 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 17 months past the filed date
  • Completion date moved by 5 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2025Possession promised17 months past this date
4 of 11Construction stages donefurthest along: Internal walls, 99%
27 of 159Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

One Place is a Commercial project by U D Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100016297 on 2 May 2018. Possession was promised by 21 May 2025 and is now 17 months past that date. The completion date has moved by 5 months from the original filing. 132 of the 159 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameOne Place
  • TypeCommercial
  • Location
    • Pune
    • wanwadi
    • Haveli
    • 411040
  • Pincode411040
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016297
  • ReraGenie IDRG-MH-53805

Builder

  • NameU D Developers LLP
  • Entity typePartnership
  • GSTIN27AACFU8136B1ZB
  • PartnerDilip Mittal

Key dates

17 months past promisethis monthRegisteredMay 2018First promiseDec 2024Revised toMay 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 May 2018
  • Promised completion21 May 2025
  • Revised completionRevised to 21 May 2025 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed105 files

Current status

83%132 of 159 units booked

Figures as on 24 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
One PlaceNA14110159159

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

One Place: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%

Progress on shared amenities15

As on 24 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes35%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes65%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered66
Open Space14

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,985 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2984.97
Proposed, not sanctioned2,985 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFC Road, PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVKa Architecture
EngineerManjiri Desai
Chartered AccountantSAC & Co LLP
Chartered AccountantPriyanka Chordiya and Associates
PartnerRole in project
U D Developers LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025021Dec 2024 → May 2025

Reason as filed by the promoterwe, M/s. U D Developers LLP, hereby declare the following with respect to the project One Place bearing registration number. P52100016297 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, we received the Occupation Certificate (OC) on 21/05/2025 and we have initiated the process for the possession as well, hence we won't be required to upload consents. To provide assurance and facilitate a smooth completion process, we are closely monitoring the remaining activities, ensuring timely execu

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 May 2025

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: Form 4 Annexure E.pdf24 Jun 2025
Other - LegalFile: Annexure E ( Form 4).pdf4 May 2025
Other - LegalFile: Occupancy Certificate.pdf4 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf4 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Wanowrie Mar 2025.pdf2 May 2025
Certificates of CA (Form 3)File: Form 3 One Place Wanowrie 30032025_compressed.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 One Place_UD.pdf29 Jan 2025
Certificates of CA (Form 3)File: form 3 One Place Wanowrie 31-12-2024_compressed.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 One Place.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: UD Developers_compressed.pdf29 Jan 2025
Declaration in FORM BFile: Form B U D DDEVELOPER.pdf28 Nov 2024
Declaration about Commencement CertificateFile: Format D.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_One Place_UD.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_One Place_UD.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_One Place_UD.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 3 One Place Wanowrie SEPTSign_compressed.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_One Place_UD.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Inventory One Place_U D June_compressed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Inventory One Place UD Sep 2024.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 One Place Wanovrie 31-03-2024.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM_2A_One Place UDD.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_One Place.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_One Place.pdf31 Jul 2024
Certificates of CA (Form 3)File: form 3 One Place Wanowrie 30-06-2024_compressed.pdf31 Jul 2024
Certificates of CA (Form 3)File: form 3 one place wanowrie 31-03-2024_compressed.pdf30 May 2024
Other - LegalFile: UD IGR INWORD LETTER.pdf29 May 2024
Other - LegalFile: UD PMC INWORD LETTER.pdf29 May 2024
Other - TechnicalFile: UD IGR INWORD LETTER.pdf29 May 2024
Disclosure of sold/ booked inventoryFile: ud q1.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: ud q2.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: ud q3.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: ud q4.pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 One Place UD_compressed.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 One Place-UD.pdf29 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shop-Part-3 1 to 9th Floor 86 Shops Compl Cert.pdf22 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: UD C -902 completion.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ONE PACE_Wanori.pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ONE PLACE Wanori.pdf6 Mar 2024
Certificates of CA (Form 3)File: Form 3 One Place Wanowrie 31122023-Both sign_compressed.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 One Place Wanwadi.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 One Place Wanwadi UD DEVELOPERS.pdf7 Dec 2023
Certificates of CA (Form 3)File: form 3 One Place Wanowrie 30092023 both sign_compressed.pdf7 Dec 2023
Other - LegalFile: UD IGR Office copy.pdf23 Oct 2023
Other - LegalFile: UD PMC copy.pdf23 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A U D Developer LLP.pdf7 Sep 2023
Certificates of CA (Form 3)File: Form 3 One Place Wanowrie 30032023 both sign_compressed.pdf7 Sep 2023
Certificates of CA (Form 3)File: form 3 one place wanowrie 30062023 Both Sign-compressed.pdf7 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 PC FY 22-23 One Place_wanowrie_both sign_compressed.pdf7 Sep 2023
Certificates of CA (Form 3)File: Form 3 One Place Wanowrie 31122022 both sign_compressed.pdf28 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 U D DEVELOPERS ARCHITECT CERTIFICATE.pdf31 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 U D DEVELOPERS ENGINEERING CERTIFICATE.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: U D DEVELOPERS Form1.pdf1 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: U D DEVELOPERS Form 2.pdf1 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: U D DEVELOPERS LLP-FORM 2 June 2022.pdf20 Feb 2023
Certificates of CA (Form 3)File: Form 3 One Place Wanowrie 30062022 Both sign_compressed.pdf20 Feb 2023
Certificates of CA (Form 3)File: Form 3 One Place Wanowrie 30092022 Both sign_compressed.pdf20 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Wanorie Form 2A signed copy March 2022.pdf13 Feb 2023
Other - LegalFile: WANAWADI PROJECT MUKHYA LEKHA V VITTA ADHIKARI PMC PUNE UNIT LIST SALE INWARD COPY.pdf1 Feb 2023
Other - LegalFile: WANAWADI-IGR INWARD COPY-UNIT LIST STAMP DUTY AMOUNT PAY BEHALF CUSTOMER.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 One Place Wanwadi 31-3 Sign_compressed.pdf17 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about New AC details.pdf6 Jan 2023
Layout approvalFile: Layout plan_compressed.pdf29 Nov 2022
Details of encumbrancesFile: Declaration about Encumbrance for One place wanwadi.pdf29 Nov 2022
Copy of Layout Approval (in case of layout)File: Layout plan_compressed.pdf29 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: NEW COMMENACEMENT CERTIFICATE 2021.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM A-WANWADI.pdf29 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-WANAWADI -ONE PLACE 30-9-22.pdf29 Nov 2022
Building plan approvalFile: WANAWADI NEW PLAN.pdf22 Aug 2022
Layout approvalFile: WANAWADI NEW PLAN.pdf22 Aug 2022
Copy of Layout Approval (in case of layout)File: WANAWADI NEW PLAN.pdf22 Aug 2022
Building Plan Approval (IOD)File: WANAWADI NEW PLAN.pdf22 Aug 2022
Other - LegalFile: U D Developers IGR Inword letter.pdf10 Aug 2022
Certificates of CA (Form 3)File: Form 3 U D Developers 3103.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: U D Develoeprs LLP Form 5 .pdf16 Mar 2022
Layout approvalFile: Layout plan.pdf22 Nov 2021
Building plan approvalFile: Layout plan.pdf22 Nov 2021
Copy of Layout Approval (in case of layout)File: Layout plan.pdf22 Nov 2021
Building Plan Approval (IOD)File: Layout plan.pdf22 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion1.pdf22 Nov 2021

How this compares with Pune

83%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 5 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep One Place on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmOne PlaceCompleted 36Lapsed / revoked 20Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: U D Developers LLP

U D Developers LLP has 1 registration on MahaRERA, including One Place. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that One Place shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if One Place is delayed beyond 21 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of One Place?

The registered promoter entity is U D Developers LLP, a partnership as per the filing. Its GSTIN 27AACFU8136B1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in One Place?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for One Place?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at One Place?

The professionals named in the filing: Architect: VKa Architecture; Engineer: Manjiri Desai; Chartered Accountant: SAC & Co LLP; Chartered Accountant: Priyanka Chordiya and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in One Place?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About One Place. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save One Place to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.