Home / Browse projects / Pune, Maharashtra / NYATI ELENOR
NYATI ELENOR
By NYATI BUILDERS PRIVATE LIMITED
RG-MH-23561 · RERA P52100078873 · Last updated on MahaRERA portal: 22 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 4 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NYATI ELENOR is a Others project by NYATI BUILDERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100078873 on 17 Jan 2025. Possession is promised by 30 Oct 2029. 10 of the 256 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameNYATI ELENOR
- TypeOthers
- Location
- Munjeri
- Bibwewadi
- Bibwewadi Munjeri
- Haveli
- Pune
- 411040
- Pincode411040
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100078873
- ReraGenie IDRG-MH-23561
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Jan 2025
- Promised completion30 Oct 2029
- Revised completionNone
- Buildings3 building records
- Documents filed120 files
Current status
Figures as on 22 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 35 | 32 | 124 | 0 | 124 |
| BUILDING B | NA | 35 | 32 | 126 | 0 | 126 |
| BUILDING C Commercial | NA | 5 | 4 | 0 | 6 | 6 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 70%.
BUILDING A6%
| Activity | Progress |
|---|---|
| Excavation | 70% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B5%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING C Commercial0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed996
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING A | 458 | 458 |
| BUILDING B | 458 | 458 |
| BUILDING C Commercial | 80 | 80 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING A | NA | Rs 158.03 cr | Rs 9.83 cr |
| BUILDING B | NA | Rs 155.36 cr | Rs 9.51 cr |
| - | NA | Rs 37.58 cr | - |
| BUILDING C Commercial | NA | Rs 2.27 cr | - |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. NACHIKET NATU & ASSOCIATES |
| Architect | VK:a Architecture |
| Engineer | Vijay Khaire |
| Engineer | Samishthi Techno Service Consultants LLP. |
| Engineer | Vishwanath Dhande |
| Engineer | NITIN NALAWADE |
| Chartered Accountant | Milani & Associates |
| Chartered Accountant | P N Thombre & Associates |
| Chartered Accountant | Milani Gattani & Co |
| Partner | Role in project |
|---|---|
| NYATI BUILDERS PRIVATE LIMITED | - |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600242 | Ram Gawali | NYATI BUILDERS PRIVATE LIMITED | 06/04/2026 |
| SM12600249 | Ram Gawali | NYATI BUILDERS PRIVATE LIMITED | 07/04/2026 |
| SM12600254 | Ram Gawali | NYATI BUILDERS PRIVATE LIMITED | 07/04/2026 |
| SM12600445 | Ram Gawali | NYATI BUILDERS PRIVATE LIMITED | 29/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jun 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 May 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Oct 2029
Documents filed120
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Nyati Elenor Form 2A 2025-2026.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Apr 2026 |
| Form 5 (FY 2024-2025)File: Nyati Elenor - Form 5.pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 19 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 19 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Q3 Elenor Signed.pdf | 19 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 18 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 18 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 18 Feb 2026 |
| Form 2A (FY 2024-2025)File: Nyati Elenor Form 2A 2024-2025.pdf | 23 Sep 2025 |
| Building plan approvalFile: 1st Floor Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: 2nd to 8th Floor Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: 7th Floor Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: 11th 16th 21th 26th 30th Floor Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: 31st Floor Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: 32nd Floor Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: B1 Parking Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: B2 Parking Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: Commercial Ele & Section.pdf | 9 Jun 2025 |
| Building plan approvalFile: Commercial Lower & First Floor.pdf | 9 Jun 2025 |
| Building plan approvalFile: Elevation A & B.pdf | 9 Jun 2025 |
| Building plan approvalFile: Section AA.pdf | 9 Jun 2025 |
| Building plan approvalFile: Section BB.pdf | 9 Jun 2025 |
| Building plan approvalFile: Stilt Parking Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: Terrace Floor Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: Typical Floor Plan.pdf | 9 Jun 2025 |
| Building plan approvalFile: 1st Floor Plan.pdf | 27 May 2025 |
| Building plan approvalFile: 2nd to 8th Floor Plan.pdf | 27 May 2025 |
| Building plan approvalFile: 7th Floor Plan.pdf | 27 May 2025 |
| Building plan approvalFile: 11th 16th 21th 26th 30th Floor Plan.pdf | 27 May 2025 |
| Building plan approvalFile: 31st Floor Plan.pdf | 27 May 2025 |
| Building plan approvalFile: 32nd Floor Plan.pdf | 27 May 2025 |
| Building plan approvalFile: B1 Parking Plan.pdf | 27 May 2025 |
| Building plan approvalFile: B2 Parking Plan.pdf | 27 May 2025 |
| Building plan approvalFile: Commercial Ele & Section.pdf | 27 May 2025 |
| Building plan approvalFile: Commercial Lower & First Floor.pdf | 27 May 2025 |
| Building plan approvalFile: Elevation A & B.pdf | 27 May 2025 |
| Building plan approvalFile: Section AA.pdf | 27 May 2025 |
| Building plan approvalFile: Section BB.pdf | 27 May 2025 |
| Building plan approvalFile: Stilt Parking Plan.pdf | 27 May 2025 |
| Building plan approvalFile: Terrace Floor Plan.pdf | 27 May 2025 |
| Building plan approvalFile: Typical Floor Plan.pdf | 27 May 2025 |
| Layout approvalFile: Layout.pdf | 8 May 2025 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 8 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 8 May 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nyati Elenor Form 3.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf | 6 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf | 6 Jan 2025 |
| Copy of the legal title reportFile: 1 Copy of the legal title report.pdf | 21 Dec 2024 |
| Other - LegalFile: 31-45.pdf | 20 Dec 2024 |
| Other - LegalFile: Property Card.pdf | 20 Dec 2024 |
| Other - LegalFile: Index II of Conveyance Deed.pdf | 20 Dec 2024 |
| Other - LegalFile: 1-15.pdf | 20 Dec 2024 |
| Other - LegalFile: 16-30.pdf | 20 Dec 2024 |
| Other - LegalFile: 46-60.pdf | 20 Dec 2024 |
| Other - LegalFile: 61-75.pdf | 20 Dec 2024 |
| Other - LegalFile: 76-85.pdf | 20 Dec 2024 |
| Other - LegalFile: 86-100.pdf | 20 Dec 2024 |
| Other - LegalFile: 101-115.pdf | 20 Dec 2024 |
| Other - LegalFile: 116-130.pdf | 20 Dec 2024 |
| Other - LegalFile: 131-145.pdf | 20 Dec 2024 |
| Other - LegalFile: 146-160.pdf | 20 Dec 2024 |
| Other - LegalFile: 161-175.pdf | 20 Dec 2024 |
| Other - LegalFile: 176-190.pdf | 20 Dec 2024 |
| Other - LegalFile: 191-205.pdf | 20 Dec 2024 |
| Other - LegalFile: 206-220.pdf | 20 Dec 2024 |
| Other - LegalFile: 221-233.pdf | 20 Dec 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 11 Dec 2024 |
| CERSAI detailsFile: Self Declaration Cersai.pdf | 11 Dec 2024 |
| Other - TechnicalFile: Declaration regard to to Plot Area.pdf | 11 Dec 2024 |
| Layout approvalFile: Sanction BP Layout.pdf | 10 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction BP Layout.pdf | 10 Dec 2024 |
| Proforma of Allotment letterFile: Elenor Allotment Letter 06122024.pdf | 6 Dec 2024 |
| Declaration in FORM BFile: Form B.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Elenor.pdf | 6 Dec 2024 |
Promoter's earlier projects18
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Nyati Enchante III | Vadgaonsheri Pune | 50 | Completed | Mar 2021 | Mar 2021 |
| Nyati Enchante II | Vadgaonsheri Pune | 65 | Completed | Mar 2021 | Mar 2021 |
| Nyati Evara II | Undri Pune | 96 | Completed | Sep 2020 | Sep 2020 |
| Nyati Enchante I | Vadgaonsheri Pune | 50 | Completed | Sep 2020 | Sep 2020 |
| Nyati Evara I | Undri Pune | 240 | Completed | Jun 2019 | Jun 2019 |
| Nyati Meadows - B8, B9 | vadgaonsheri Pune | 76 | Completed | Jul 2017 | Apr 2017 |
| Nyati Evita | Lohegaon Pune | 240 | Completed | Jul 2017 | Oct 2016 |
| Nyati Eureka | Kharadi Pune | 38 | Completed | Jul 2017 | Apr 2017 |
| Nyati Emporius | Baner Pune | 98 | Completed | Jul 2017 | Mar 2017 |
| Nyati Windchimes | Undri Pune | 200 | Completed | Mar 2017 | Jun 2016 |
| Nyati Equatorial-II | Bavdhan Bk Pune | 312 | Completed | Mar 2017 | Late, Apr 2017 |
| Nyati Unitree I | CTS No 1995 1996B Pune nagar Road Yerwada Pune | 142 | Completed | Dec 2016 | Oct 2015 |
| Nyati Epitome | Mohammedwadi Pune | 112 | Completed | Dec 2016 | Oct 2016 |
| Nyati Ebony | Undri Pune | 188 | Completed | Mar 2016 | Dec 2015 |
| Nyati Equatorial-I | Bavdhan bk pune | 264 | Completed | Dec 2015 | Late, Jul 2016 |
| Nyati Ethos-II | Undri Pune | 152 | Completed | Sep 2015 | Mar 2015 |
| Nyati Ethos-I | Undri Pune | 165 | Completed | Dec 2014 | Late, Aug 2015 |
| Nyati Esplanade | Bavdhan Bk Pune | 253 | Completed | Jan 2013 | Late, Jan 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 20 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 120 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NYATI ELENOR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bibwewadi13,700+ in Pune
Filed coordinates, straight-line distance. 100 registered projects within 2 km.
GANGA NAKSHATRA
MAHANAGAR REALTY
99 AVENUE
99 AVENUE REALTY LLP
Symphony of The Skies
Abhay Arvind Mandhare
One Place
U D Developers LLP
ISHANAND
MAKAWANA BROS & CO (HWP)
WINDSOR SATYA VIHAR
WINDSOR INFRACON LLP
Builder: NYATI BUILDERS PRIVATE LIMITED
NYATI BUILDERS PRIVATE LIMITED has 21 registrations on MahaRERA, including NYATI EVARA I and NYATI UNITREE II. Its filings disclose 18 earlier MahaRERA projects: declares 14 of 18 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if NYATI ELENOR is delayed beyond 30 Oct 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NYATI ELENOR?
The registered promoter entity is NYATI BUILDERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202MH1996PTC102620 and GSTIN 27AAACN6418N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NYATI ELENOR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NYATI ELENOR?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NYATI ELENOR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NYATI ELENOR?
The professionals named in the filing: Architect: Ar. NACHIKET NATU & ASSOCIATES; Architect: VK:a Architecture; Engineer: Vijay Khaire; Engineer: Samishthi Techno Service Consultants LLP.; Engineer: Vishwanath Dhande; Engineer: NITIN NALAWADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NYATI ELENOR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback