Home / Browse projects / Pune, Maharashtra / SKY ONE

Registered No litigation declared Residential / Group Housing project

SKY ONE

By A K DEVELOPERS

RG-MH-88562 · RERA P52100046016 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SKY ONE is a Residential / Group Housing project by A K DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100046016 on 15 Jun 2022. Possession is promised by 31 Dec 2026. 42 of the 42 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameSKY ONE
  • TypeResidential / Group Housing
  • Location
    • Ghorpadi
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100046016
  • ReraGenie IDRG-MH-88562

Builder

  • NameA K DEVELOPERS
  • Entity typePartnership
  • PartnersABHILASHA NILESH DAGADE, ATUL BALASAHEB KAWADE, PUSHPA BALASAHEB KAWADE
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed77 files

Current status

100%42 of 42 units booked
100.0%Work done, per cost certificate

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA8714014
B WINGNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28
BuildingClosed/CoveredTotal
A WING1212
B WING1616

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area700 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3081.0
Proposed, not sanctioned1,220 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGran Exito Shworoom No-1a and 1b Survey No-172 B T Kawade Road Ghorpadi Pune 411001
Estimated costRs 8.35 cr
Cost incurredRs 8.35 cr
Work done100.0%
BuildingWingEstimatedIncurred
A WINGNARs 3.17 crRs 3.17 cr
B WINGNARs 3.17 crRs 3.17 cr
-NARs 2.00 crRs 2.00 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR SHIRISH VISHWANATH SONAWANE
ArchitectAR ABHIJIT CHANDRAKANT VAIDYA
EngineerMR MAHESH SHANKAR KUNJIR
Chartered AccountantCA AMOL TOTALA
Chartered AccountantCA YOGESH BHAGAT
Chartered AccountantPavan T Talreja
Chartered AccountantVaibhav S Bhise & Associates
PartnerRole in project
A K DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate Mar 2026.pdf6 Jul 2026
Withdrawal Update Form 2File: Form 2 engg certificate March 2026.pdf6 Jul 2026
Withdrawal Update Form 3File: FORM - 3 -CA Dec.pdf6 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY-2025-2026.pdf6 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 AK Developers.pdf2 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate June 2025.pdf19 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Sept 2025.pdf19 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Dec 2025.pdf19 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Mar 2026.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 engg certificate Jun 2025.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 engg certificate sept 2025.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 engg certificate Dec 2025.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 engg certificate March 2026.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM - 3 -CA - June 25.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM - 3 -CA - Sept 25.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM - 3 -CA Dec.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM - 3 -CA Dec.pdf19 Jun 2026
Layout approvalFile: Project Plan 1_1 13042023_11zon.pdf13 Mar 2025
Building plan approvalFile: Project Plan 1_2 13042023_11zon.pdf13 Mar 2025
Copy of Layout Approval (in case of layout)File: Project Plan 1_1 13042023_11zon.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 310324.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 311224.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 311223.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 311222.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 310323.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 300924.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 300923.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 300922.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 300624.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 300623.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 -CA - 300622.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 Engineers Certificate - 300622.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 300623.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 311224.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 311223.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 311222.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 310324.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 310323.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 300924.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 300923.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 300922.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 300624.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate - 300622.pdf13 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Project Plan 1_2 13042023_11zon.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 310323.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 310323.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 310324.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 310324.pdf13 Mar 2025
Layout approvalFile: Revised_Layout Approval.pdf6 Sep 2022
Building plan approvalFile: Revised_Building Plan Approval.pdf6 Sep 2022
Details of encumbrances concerned to LegalFile: Legal Encumberance.pdf6 Sep 2022
Copy of Layout Approval (in case of layout)File: Revised_Layout Approval.pdf6 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised_Building Plan Approval.pdf6 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Revised_Commencement Certificate_Jun22.pdf6 Sep 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold Inventory .pdf6 Sep 2022
Proforma of Allotment letterFile: Form of Allotment Letter AK.pdf6 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: MahaRERA All Bank Details .pdf6 Sep 2022
Deviation Report with respect to Allotment letterFile: AL Deviation Report.pdf6 Sep 2022
Deviation Report with respect to model copy of AgreementFile: AFS Deviation Report.pdf6 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf3 Jun 2022
Copy of the legal title reportFile: Title Search Report.pdf27 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200238287182_For_Asset_Based_Search_27_05_2022_13_10_58_401.pdf27 May 2022
Layout approvalFile: Layout Approval.pdf26 May 2022
Building plan approvalFile: Building Plan Approval.pdf26 May 2022
PAN CardFile: PAN Card.pdf26 May 2022
Copy of the legal title reportFile: Legal Title Report.pdf26 May 2022
Details of encumbrancesFile: Encumbrance Certificate.pdf26 May 2022
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf26 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf26 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Construction Commencement Certificate.pdf26 May 2022
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate .pdf26 May 2022
Declaration in FORM BFile: Declaration in Form B.pdf26 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf26 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf26 May 2022
Proforma of Allotment letterFile: Proforma of Sale Agreement.pdf26 May 2022
Proforma of Allotment letterFile: Proforma Of Allotment and Possession Letter.pdf26 May 2022

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKY ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghorpadi13,700+ in Pune

2 kmSKY ONECompleted 24Lapsed / revoked 8Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 82 registered projects within 2 km.

Builder: A K DEVELOPERS

A K DEVELOPERS has 6 registrations on MahaRERA, including A K ORION and SHREE RAJ BHARTI. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SKY ONE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKY ONE?

The registered promoter entity is A K DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKY ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKY ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKY ONE?

The professionals named in the filing: Architect: AR SHIRISH VISHWANATH SONAWANE; Architect: AR ABHIJIT CHANDRAKANT VAIDYA; Engineer: MR MAHESH SHANKAR KUNJIR; Chartered Accountant: CA AMOL TOTALA; Chartered Accountant: CA YOGESH BHAGAT; Chartered Accountant: Pavan T Talreja. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKY ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKY ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKY ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.