Skicity Symphony

By SKICON INFRASTRUCTURE CO

RG-MH-18262 · RERA P51800056359 · Last updated on MahaRERA portal: 31 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 9.00 crore secured on the land, in favour of Shriram Housing Finance Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Installation of Lifts, 95%
9 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

Skicity Symphony is a Others project by SKICON INFRASTRUCTURE CO in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056359 on 29 May 2024. Possession is promised by 31 Dec 2026. 11 of the 20 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSkicity Symphony
  • TypeOthers
  • Location
    • Lake Road off LBS Marg
    • Bhandup West
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056359
  • ReraGenie IDRG-MH-18262

Builder

  • NameSKICON INFRASTRUCTURE CO
  • Entity typePartnership
  • PartnersJay Mahesh Manek, Mahesh Narandas Manek, Hina Mahesh Manek, Kushal Mahesh Manek
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

55%11 of 20 units booked
100.0%Work done, per cost certificate

Figures as on 31 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing CNA111016420

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

Wing C: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 31 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8

Land and ownership19

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area167 sq m
Land owned byThe promoter, with other names on the file
Named landowners19
Encumbrance on the landDeclared present
Charge in favour ofShriram Housing Finance Ltd
Secured amountRs 9.00 crore
Declared on13 Jun 2025
LandownerVillageDistrict
Shri Shrikant GawandMumbai CityMumbai City
Vasanti Shrikant GawandBhandupMumbai Suburban
Nishant Shrikant GawandMumbai CityMumbai City
Nikhil Shrikant GawandMumbai CityMumbai City
Vijay Ramchandra GawandMumbai CityMumbai City
Leelabai Vijay GawandMumbai CityMumbai City
Suman Chandrakant GawandMumbai CityMumbai City
Sunila Chandrakant GawandMumbai CityMumbai City
Shashank Chandrakant GawandMumbai CityMumbai City
Gauri Bhusan MhatreMumbai CityMumbai City
Ajay Ramchandra GawandMumbai CityMumbai City
Nirupa Ajay GawandMumbai CityMumbai City
Sujay Ajay GawandMumbai CityMumbai City
Sanchita Ajay GawandMumbai CityMumbai City
Mangala Pandrinath ThakurMumbai CityMumbai City
Sushila Ramchandra PatilMumbai CityMumbai City
Pramila Pandurang PatilMumbai CityMumbai City
Smita Ramesh ThakurMumbai CityMumbai City
Shobha Narayan PatilMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI875.58
Proposed, not sanctioned876 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCorpora G 5 Ground Floor and CTS No 229 LBS Marg Bhandup West 400078
Estimated costRs 3.86 cr
Cost incurredRs 3.86 cr
Work done100.0%
BuildingWingEstimatedIncurred
Wing CNARs 2.66 crRs 2.66 cr
-NARs 1.20 crRs 1.20 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s Daisaria Associates
ArchitectHOMEWORK DESIGNS ARCHITECTS
EngineerRC Tipnis
Chartered AccountantMahesh Shetty & Associates Chartered Accountants
PartnerRole in project
SKICON INFRASTRUCTURE CO-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 March 2026.pdf31 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf31 May 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf31 May 2026
Withdrawal Update Form 1File: Form 1 as on December 2025.pdf16 Mar 2026
Withdrawal Update Form 2File: Form 2 as on December 2025.pdf16 Mar 2026
Withdrawal Update Form 3File: Form 3 as on December 2025.pdf16 Mar 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 as on September 2025.pdf9 Dec 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 as on September 2025.pdf9 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 as on September 2025.pdf9 Dec 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 as on June 2025.pdf13 Aug 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 as on June 2025.pdf13 Aug 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 as on June 2025.pdf13 Aug 2025
Form 1File: Form 1 March 2025.pdf13 Jun 2025
Form 2File: Form 2.pdf13 Jun 2025
Form 3File: Form 3 - 31 03 2025.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Symphony Wing C 31 03 2025.pdf13 Jun 2025
Form 1File: Form 1 Dec 24.pdf13 Jun 2025
Form 2File: Form 2.pdf13 Jun 2025
Form 3File: Form 3 for December 2024 .pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Symphony Wing C 31 12 2024.pdf13 Jun 2025
Form 1File: Form 1.pdf13 Jun 2025
Form 2File: Form 2 - Engineers Certificate as on 30 09 2024.pdf13 Jun 2025
Form 3File: Form 3 - CA Certificate 30 09 2024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory as on 30 09 2024.pdf13 Jun 2025
Form 1File: Form 1 Final 30-06-2024.pdf13 Jun 2025
Form 2File: Form 2 - Engineers Certificate as on 30 06 2024 Final.pdf13 Jun 2025
Form 3File: Form 3 - CA Certificate 30 06 2024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory as on 30 06 2024.pdf13 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2025.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for December 2024 .pdf15 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured Unscured Finance.pdf15 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Skicon Infra co End use CA certified.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised .pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory as on 30 09 2024.pdf14 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - HDFC Letter.pdf6 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for Real Estate Project.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate 30 09 2024.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate as on 30 09 2024.pdf18 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter-Finance.pdf16 Nov 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter-Finance.pdf16 Nov 2024
CERSAI detailsFile: CERSAI.pdf16 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter-Finance.pdf16 Nov 2024
CERSAI detailsFile: CERSAI.pdf16 Nov 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter-Finance.pdf16 Nov 2024
Building plan approvalFile: Approved Layout Plans-3.pdf21 May 2024
Building plan approvalFile: Approved Layout Plans-4.pdf21 May 2024
Building plan approvalFile: Approved Layout Plans-5.pdf21 May 2024
Building plan approvalFile: Approved Layout Plans-6.pdf21 May 2024
Building plan approvalFile: Approved Layout Plans-7.pdf21 May 2024
Building plan approvalFile: Approved Layout Plans-8.pdf21 May 2024
Building plan approvalFile: Approved Layout Plans-9.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout Plans-3.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout Plans-4.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout Plans-5.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout Plans-6.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout Plans-7.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout Plans-8.pdf21 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout Plans-9.pdf21 May 2024
Building plan approvalFile: Approved Layout Plans-1.pdf1 May 2024
Layout approvalFile: 1 1.pdf1 May 2024
Building plan approvalFile: Approved Layout Plans-2.pdf1 May 2024
PAN CardFile: Skicon Infra co - Pan Card.pdf1 May 2024
Copy of the legal title reportFile: Title .pdf1 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter -Finance.pdf1 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter -Legal.pdf1 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter -Finance.pdf1 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter -Legal.pdf1 May 2024
Copy of Layout Approval (in case of layout)File: 1 1.pdf1 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout Plans-1.pdf1 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout Plans-2.pdf1 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf1 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Plot Area Declaration.pdf1 May 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate Format D.pdf1 May 2024
Declaration in FORM BFile: FormB_ Declaration of Promoter.pdf1 May 2024
CERSAI detailsFile: CERSAI Declaration.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Skicity Symphony Latest_compressed.pdf1 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Skicity Phase 1Village Bhandup at Kurla Mumbai Suburban 400078162OngoingDec 2023Late, Dec 2026

How this compares with Mumbai Suburban

55%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Skicity Symphony on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhandup West6,700+ in Mumbai Suburban

2 kmSkicity SymphonyCompleted 92Lapsed / revoked 59Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 264 registered projects within 2 km.

Builder: SKICON INFRASTRUCTURE CO

Skicon Infrastructure Co has 2 registrations on MahaRERA, including Skicity Phase 1 and Skicity Symphony. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Skicity Symphony is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Skicity Symphony?

The registered promoter entity is SKICON INFRASTRUCTURE CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Skicity Symphony?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Skicity Symphony?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Skicity Symphony?

The professionals named in the filing: Architect: M/s Daisaria Associates; Architect: HOMEWORK DESIGNS ARCHITECTS; Engineer: RC Tipnis; Chartered Accountant: Mahesh Shetty & Associates Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Skicity Symphony?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skicity Symphony. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skicity Symphony to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.