SIYARA ICON

By SHAKTI REALTY

RG-MH-68979 · RERA P51700034763 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 36 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 92%
89 of 111Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

SIYARA ICON is a Others project by SHAKTI REALTY in Thane, Maharashtra, registered with MahaRERA as P51700034763 on 28 Apr 2022. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 22 of the 111 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSIYARA ICON
  • TypeOthers
  • Location
    • RANJNOLI
    • BHIWANDI
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700034763
  • ReraGenie IDRG-MH-68979

Builder

  • NameSHAKTI REALTY
  • Entity typePartnership
  • GSTIN27ACWFS1734P1Z6
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerJANAK PUNJALAL PATEL
  • Other registrations7 more →
  • Completed1 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2022First promiseDec 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed69 files

Current status

20%22 of 111 units booked
35.6%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIYARA ICONNA10106744111

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 92%.

SIYARA ICON: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor92%
Slabs of Super Structure43%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks52%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.8%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes6%
Landscaping & Tree PlantingYes0%
Street LightingYes75%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed131

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots131
Closed/Covered24
Open Space107

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,496 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
PRAKASHSINGH HARISINGH HIRAPimpalgharThane
ANALSINGH HOLASINGH HIRARanjnoliThane
DILIPSINGH ANALSINGH HIRARanjnoliThane
SURENDRASINGH ANALSINGH HIRARanjnoliThane

Approvals and building plan

Sanctioning authorityMumbai Metropolitan Region Development Authority
Permissible FSI8237.79
Proposed, not sanctioned8,238 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 11 12, Lodha Amara, Kolshet Rd, Thane West 400607
Estimated costRs 42.95 cr
Cost incurredRs 15.28 cr
Work done35.57%
BuildingWingEstimatedIncurred
SIYARA ICONNARs 40.27 crRs 14.80 cr
-NARs 2.68 crRs 47.65 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectK K AND ASSOCIATES
EngineerK K AND ASSOCIATES
Chartered AccountantN D CHHEDA & ASSOCIATES
Chartered AccountantN D CHHEDA AND ASSOCIATES
Chartered AccountantNakrani and Co
PartnerRole in project
SHAKTI REALTY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29012619631Dec 2025 → Dec 2028

Reason as filed by the promoterWe hereby submit this letter as a formal request for the extension of the MahaRERA registration for our project Siyara Icon (Reg. No. P51700034736). The project has encountered unforeseen delays due to a combination of unavoidable circumstances. The initial project design, approved for G+10, was dependent upon the availability of MMRDA Transferable Development Rights (TDR) in the region. Unfortunately, despite our continuous efforts, the anticipated MMRDA TDR has not been available since the commencement of the project. To prevent further delay and to ensure progress, we were compelled to proc

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form_1_Siyara Icon_Q1_FY 26-27_Signed.pdf10 Aug 2026
Withdrawal Update Form 2File: Form_2_Siyara Icon_Q1_FY 26-27_Signed.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3_Siyara icon_Q1_FY 26-27_Signed.pdf10 Aug 2026
Withdrawal Update Form 1File: FORM_1_Siyara Icon_Q4_FY 2025-26_Signed.pdf1 Jun 2026
Withdrawal Update Form 2File: FORM_2_Siyara Icon_Q4_FY 2025-26_Signed.pdf1 Jun 2026
Withdrawal Update Form 3File: FORM_3_Siyara Icon_Q4_FY 2025-26_Signed.pdf1 Jun 2026
Withdrawal Update Form 1File: FORM_1_SIYARA ICON_Q3_FY 2025-26_signed.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM_2_SIYARA ICON_Q3_FY 2025-26_signed.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3_SIYARA_ICON_Q3_FY_2025-26_Signed.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: FORM_2A_SIYARA_ICON_FY_2024-25_Signed.pdf18 Dec 2025
Withdrawal Update Form 1File: Form_1_Siyara Icon_Q2_FY 2025-26_signed.pdf26 Nov 2025
Withdrawal Update Form 2File: Form_2_Siyara Icon_Q2_FY 2025-26_signed.pdf26 Nov 2025
Withdrawal Update Form 3File: FORM_3_SIYARA_ICON_Q2_FY_2025-26-Signed.pdf26 Nov 2025
Withdrawal Update Form 1File: Form_1_Siyara Icon_Q1_FY 2025-26_Signed.pdf11 Aug 2025
Withdrawal Update Form 2File: Form_2_Siyara_Icon_Q1_FY 2025-26-Signed.pdf11 Aug 2025
Withdrawal Update Form 3File: Form 3_Siyara Icon_Q1_FY 2025-26_signed.pdf11 Aug 2025
Form 5 (FY 2023-2024)File: Form 5_Siyara Icon_Shakti Realty_31-03-2024-Signed.pdf19 Jul 2025
Form 5 (FY 2024-2025)File: Form 5_Siyara Icon_Fy 24-25_Signed.pdf17 Jul 2025
Form 1File: Siyara Icon_FORM 1_Q4_2024-25.pdf3 Jul 2025
Form 2File: Siyara Icon_FORM 2_Q4_2024-25.pdf3 Jul 2025
Form 3File: Form 3_Siyara Icon_Mar 25_Signed.pdf3 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_sold_unsold_units_Siyara_Icon_Q4.pdf3 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I_Q3 FY 2024-25.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Icon_Dec 24_Signed.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM II_Q3 FY 2024-25.pdf3 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SIYARA ICON_FORM 2A_FY 23-24.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Architect Certificate_Siyara Icon_Dt_30-09-2024_With Sign.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Icon_Sep 24-Signed.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Engineer Certificate_Siyara Icon_Dt_30-09-2024_With Sign.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Siyara Icon_Shakti Realty_31-03-2024-Signed.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 Architect Certificate_30-06-2024.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Enginner certificate Siyara Icon_30-06-2024.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Icon_June 24_Signed.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-3-2024 Siyara Icon_Architect Certificate.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer certificate-_Siyara Icon_31-3-2024.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Icon_Mar-24.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE (SIYARA ICON)_Dec-23.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE (SIYARA ICON)_Dec-23.pdf14 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Engineer Certificate_Siyara Icon_2022-23.pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory_Dec23.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Icon_Dec-23_compressed.pdf14 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Separate Bank Ac Siyara Icon.pdf14 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Siyara Icon_Shakti Realty_31-03-2023_Signed.pdf10 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate Dt18-05-2023_Siyara Icon_compressed.pdf1 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate Dt18-05-2023_Siyara Icon_compressed.pdf1 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Siyara Icon Architect Certificate 16-02-2023.pdf24 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Siyara Icon Engineer Certificate 16-02-2023.pdf24 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate project.pdf24 Mar 2023
Details of encumbrancesFile: Encumbarance Details_Bajaj_Siyara Icon_Shakti Realty.pdf27 Feb 2023
Copy of the legal title reportFile: Title Certificate_Siyara Icon_Revised-compressed.pdf18 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_Asset_Based.pdf18 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3_Siyara Icon_SR_Compressed.pdf18 Apr 2022
Layout approvalFile: Plan_merged_compressed-1-2.pdf18 Mar 2022
Layout approvalFile: Plan_merged_compressed-3-5.pdf18 Mar 2022
Building plan approvalFile: Plan_merged_compressed-1-2.pdf18 Mar 2022
Building plan approvalFile: Plan_merged_compressed-3-5.pdf18 Mar 2022
PAN CardFile: PAN Card.pdf18 Mar 2022
Details of encumbrancesFile: Encumbrance certificate_Siyara Icon.pdf18 Mar 2022
Copy of Layout Approval (in case of layout)File: Plan_merged_compressed-1-2.pdf18 Mar 2022
Copy of Layout Approval (in case of layout)File: Plan_merged_compressed-3-5.pdf18 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan_merged_compressed-1-2.pdf18 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan_merged_compressed-3-5.pdf18 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_MMRDA Permission_compressed.pdf18 Mar 2022
Declaration about Commencement CertificateFile: Declaration_Siyara Icon.pdf18 Mar 2022
Declaration in FORM BFile: form_b_Shakti Realty_compressed.pdf18 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cetificate Siyara icon_compressed.pdf18 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Siyaa icon_compressed.pdf18 Mar 2022
Proforma of Allotment letterFile: Draft Agreement_Siyara Icon.pdf18 Mar 2022
Proforma of Allotment letterFile: Draft_Allottment letter_Shakti Realty.pdf18 Mar 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
SAI SRUSHTIP51700017700KALYAN, ThaneSep 2018CompletedApr 2024Registered original: Jun 2022Apr 2024

How this compares with Thane

20%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIYARA ICON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

Builder: SHAKTI REALTY

SHAKTI REALTY has 8 registrations on MahaRERA, including SAI SRUSHTI and SIYARA ELITE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SIYARA ICON is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIYARA ICON?

The registered promoter entity is SHAKTI REALTY, a partnership as per the filing. Its GSTIN 27ACWFS1734P1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIYARA ICON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIYARA ICON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIYARA ICON?

The professionals named in the filing: Architect: K K AND ASSOCIATES; Engineer: K K AND ASSOCIATES; Chartered Accountant: N D CHHEDA & ASSOCIATES; Chartered Accountant: N D CHHEDA AND ASSOCIATES; Chartered Accountant: Nakrani and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIYARA ICON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIYARA ICON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIYARA ICON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.