Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 85%
128 of 276Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

SIYARA FORTUNE BUILDING A WING B is a Residential / Group Housing project by SHAKTI REALTY in Thane, Maharashtra, registered with MahaRERA as P51700049460 on 14 Feb 2023. Possession is promised by 31 Dec 2027. 148 of the 276 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSIYARA FORTUNE BUILDING A WING B
  • TypeResidential / Group Housing
  • Location
    • NARPOLI
    • Chavindra
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700049460
  • ReraGenie IDRG-MH-66026

Builder

  • NameSHAKTI REALTY
  • Entity typePartnership
  • GSTIN27ACWFS1734P1Z6
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerJANAK PUNJALAL PATEL
  • Other registrations7 more →
  • Completed1 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

54%148 of 276 units booked
69.3%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIYARA FORTUNE BUILDING A WING BNA25242760276

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 85%.

SIYARA FORTUNE BUILDING A WING B: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor85%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed120

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots120
Closed/Covered120

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,049 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SURYAKANT MANGALDAS SAMANIMumbai CityMumbai City
CHAMPABEN SURYAKANT SAMANIMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityBhiwandi-Nizampur Municipal Corporation
Permissible FSI19298.77
Proposed, not sanctioned19,299 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 11 12, Lodha Amara, Kolshet Rd, Thane West 400607
Estimated costRs 74.00 cr
Cost incurredRs 51.29 cr
Work done69.31%
BuildingWingEstimatedIncurred
SIYARA FORTUNE BUILDING A WING BNARs 72.00 crRs 51.29 cr
-NARs 2.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR K ASSOCIATES
EngineerShravani Consultants
EngineerS K STRUCTURAL ENGINNERING
Chartered AccountantN D CHHEDA AND ASSOCIATES
Chartered AccountantNAKRANI AND CO
PartnerRole in project
SHAKTI REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM_1_Siyara Fortune_A_Q4_FY 2025-26_Signed.pdf26 May 2026
Withdrawal Update Form 2File: FORM_2_Siyara Fortune_A_Q4_FY 2025-26_Signed.pdf26 May 2026
Withdrawal Update Form 3File: Form 3_Siyara Fortune-Building A_Q4_Fy2025-26_Signed.pdf26 May 2026
Withdrawal Update Form 1File: FORM_1_SIYARA FORTUNE_A_Q3_FY 2025-26_signed.pdf24 Jan 2026
Withdrawal Update Form 2File: FORM_2_SIYARA_FORTUNE_A_Q3_FY 2025-26_signed.pdf24 Jan 2026
Withdrawal Update Form 3File: FORM 3 SIYARA FORTUNE(A) Q3 FY 2025-26 signed.pdf24 Jan 2026
Form 2A (FY 2024-2025)File: FORM 2A_SIYARA FORTUNE A Building_FY_2024-25-Signed.pdf20 Dec 2025
Withdrawal Update Form 1File: FORM_1_Siyara_Fortune_Building_A_Q2_FY_2025-26_signed.pdf28 Nov 2025
Withdrawal Update Form 2File: FORM_2_Siyara_Fortune_Building_A_Q2_FY_2025-26_signed.pdf28 Nov 2025
Withdrawal Update Form 3File: FORM_3_SIYARA_FORTUNE_Q2_FY_2025-26_Signed.pdf28 Nov 2025
Form 5 (FY 2023-2024)File: Form 5_Siyara Fortune Bldg A Wing B_Shakti Realty_31-03-2024_Signed.pdf29 Sep 2025
Form 5 (FY 2024-2025)File: Form 5_Siyara Fortune Building A_FY 24-25_Signed.pdf29 Sep 2025
Withdrawal Update Form 1File: Form_1_Siyara_Fortune_Q1_FY 2025-26_Signed.pdf11 Aug 2025
Withdrawal Update Form 2File: Form_2_Siyara_Fortune_A_Q1_FY 2025-26_Signed.pdf11 Aug 2025
Withdrawal Update Form 3File: Form_3_Siyara_Fortune_A_Q1_2025-26-Signed.pdf11 Aug 2025
Form 1File: Form 1_SF_Building_A_Q4.pdf4 Jun 2025
Form 2File: Form2_Engineer's Certificate_Siyara_Fortune_Q4_2024-25.pdf4 Jun 2025
Form 3File: Form 3_Siyara Fortune_Bldg A_Mar 25-Signed.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory_Mar 25-Siyara Fortune Building A.pdf4 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SF Building A_Dec 24.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Fortune Building A Q3 2024-25_Signed_compressed.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Building A Engineer's Certificate_Dec 24.pdf12 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Siyara Fortune_Building A_Form 2A_Fy 23-24.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Architect Certificate_SF Building A wing B_Sep 24.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Fortune_Bldg A_Jun-24.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Fortune_Bldg A_Sep 24-Signed.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Engineer Certificate_SF Building A wing B-Sep 24.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Siyara Fortune Bldg A Wing B_Shakti Realty_31-03-2024_Signed.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate For Siyara Fortune (A-Bldg- B Wing)_June24.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fortune Bldg A wing B FORM II Q1 2024-25.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SF_FORM I_ Builidng A_Wing B_Mar-24.pdf8 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SF_FORM II_ Builidng A_Wing B_Mar-24.pdf8 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Fortune_Bldg A_Mar-24_Signed.pdf8 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechs Certificate_Building A_Dec-23.pdf19 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Building A_Dec-23.pdf19 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Siyara Fortune Building A Wing B Dec-23_compressed.pdf19 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Separate Bank Ac Siyara Fortune A Bldg.pdf19 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Fortune_Bldg A_18-10-2023_compressed.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Building A_Wing B_ Engineer Certificate_24-06-2023.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Siyara Fortune Bldg A wing B_22-23.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Cer Building A B Wing_Q2.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A Building B Wing Eng Cer_Q2.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Building A Wing B_Sept-23.pdf14 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Certificate_Siyara Fortune Building A Wing B.pdf14 Oct 2023
Details of encumbrances concerned to FinanceFile: Rera Encumbrance Siyara Fortune_Bldg B.pdf15 Sep 2023
Details of encumbrances concerned to LegalFile: Rera Encumbrance Siyara Fortune_Bldg B.pdf15 Sep 2023
Layout approvalFile: Revised Plan_SF_compressed.pdf13 Jun 2023
Building plan approvalFile: Revised Plan_SF_compressed.pdf13 Jun 2023
Copy of Layout Approval (in case of layout)File: Revised Plan_SF_compressed.pdf13 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan_SF_compressed.pdf13 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Siyara Fortune CC Certificate upto 24th Floor_compressed.pdf13 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_SF_Bldg A_Wing B_06-04-23.pdf16 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate project.pdf24 Mar 2023
CERSAI detailsFile: Declaration of Non Applicability of Report from CERSAI.pdf6 Feb 2023
Copy of the legal title reportFile: Title report_Siyara Fortune.pdf30 Jan 2023
Building plan approvalFile: Siyara Fortune 7_compressed.pdf18 Jan 2023
Details of encumbrances concerned to FinanceFile: Finance Encumbrance_Shakti Realty.pdf18 Jan 2023
Details of encumbrances concerned to LegalFile: Finance Encumbrance_Shakti Realty.pdf18 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Siyara Fortune 7_compressed.pdf18 Jan 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf18 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to Draft AFS.pdf18 Jan 2023
Declaration in FORM BFile: Form B Shakti Realty A building B Wing.pdf6 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Siyara Fortune Building A Wing B_compressed.pdf6 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure in other Real Estate Organisation.pdf6 Jan 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER_Siyara Fortune_Building A B Wing.pdf6 Jan 2023
Proforma of Agreement for saleFile: Draft AFS_SR_Siyara Fortune-Bldg-A (B wing).pdf6 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to allotment letter.pdf6 Jan 2023
Layout approvalFile: Plan Approved_Siyara Fortune_compressed.pdf22 Dec 2022
Building plan approvalFile: Plan Approved_Siyara Fortune_compressed.pdf22 Dec 2022
PAN CardFile: PAN_Shakti Realty.pdf22 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance_Shakti Realty.pdf22 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance_Shakti Realty.pdf22 Dec 2022
Copy of Layout Approval (in case of layout)File: Plan Approved_Siyara Fortune_compressed.pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan Approved_Siyara Fortune_compressed.pdf22 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_Siyara Fortune.pdf22 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Siyara Fortune Building A Wing B_compressed.pdf22 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Siyara Fortune Building A Wing B.pdf22 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account for real estate projects.pdf22 Dec 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
SAI SRUSHTIP51700017700KALYAN, ThaneSep 2018CompletedApr 2024Registered original: Jun 2022Apr 2024

How this compares with Thane

54%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIYARA FORTUNE BUILDING A WING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NARPOLI7,600+ in Thane

Builder: SHAKTI REALTY

SHAKTI REALTY has 8 registrations on MahaRERA, including SAI SRUSHTI and SIYARA ELITE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SIYARA FORTUNE BUILDING A WING B is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIYARA FORTUNE BUILDING A WING B?

The registered promoter entity is SHAKTI REALTY, a partnership as per the filing. Its GSTIN 27ACWFS1734P1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIYARA FORTUNE BUILDING A WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIYARA FORTUNE BUILDING A WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIYARA FORTUNE BUILDING A WING B?

The professionals named in the filing: Architect: R K ASSOCIATES; Engineer: Shravani Consultants; Engineer: S K STRUCTURAL ENGINNERING; Chartered Accountant: N D CHHEDA AND ASSOCIATES; Chartered Accountant: NAKRANI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIYARA FORTUNE BUILDING A WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIYARA FORTUNE BUILDING A WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIYARA FORTUNE BUILDING A WING B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.