Home / Browse projects / Aurangabad, Maharashtra / SIMPLICITY PHASE - I

Registration lapsed No litigation declared Residential / Group Housing project

SIMPLICITY PHASE - I

By Shreeram Traders and Developers

RG-MH-49030 · RERA P51500034803 · Last updated on MahaRERA portal: 17 Jun 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
60 of 66Construction stages doneacross 6 buildings; furthest along: Podiums (if any), 0%
51 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

SIMPLICITY PHASE - I is a Residential / Group Housing project by Shreeram Traders and Developers in Aurangabad, Maharashtra, registered with MahaRERA as P51500034803 on 28 Apr 2022. Possession was promised by 31 Mar 2025 and is now 19 months past that date. The completion date has moved by 12 months from the original filing. 19 of the 70 units on this registration are recorded sold or booked, and 60 of 66 construction stages are filed complete.

At a glance

Project

  • NameSIMPLICITY PHASE - I
  • TypeResidential / Group Housing
  • Location
    • JALNA ROAD
    • FATTEPUR
    • Aurangabad
    • 431002
  • Pincode431002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500034803
  • ReraGenie IDRG-MH-49030

Builder

  • NameShreeram Traders and Developers
  • Entity typeOthers
  • GSTIN27ADMPA3391B1ZV
  • ProprietorsPRAFULLKUMAR P AGRAWAL Agrawal, Prafullkumar Agrawal

Key dates

19 months past promisethis monthRegisteredApr 2022First promiseMar 2024Revised toMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Apr 2022
  • Promised completion31 Mar 2025
  • Revised completionRevised to 31 Mar 2025 (originally 31 Mar 2024)
  • Buildings6 building records
  • Documents filed32 files

Current status

27%19 of 70 units booked
100.0%Work done, per cost certificate

Figures as on 17 Jun 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIMPLICITY C-1NA5010010
SIMPLICITY C-2NA5012012
SIMPLICITY C-3NA5012012
SIMPLICITY B-4NA5012012
SIMPLICITY B-5NA5012012
SIMPLICITY B-6NA5012012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 17 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

60 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.

SIMPLICITY C-191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SIMPLICITY C-291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SIMPLICITY C-391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SIMPLICITY B-491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SIMPLICITY B-591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SIMPLICITY B-691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6
BuildingClosed/CoveredTotal
SIMPLICITY C-111
SIMPLICITY C-211
SIMPLICITY C-311
SIMPLICITY B-411
SIMPLICITY B-511
SIMPLICITY B-611

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,623 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Sep 2024
LandownerVillageDistrict
ASCENT VENTURESAurangabad (M Corp.)Aurangabad
RAMNIRANJAN CHATURBHUJ AGRAWALAurangabad (M Corp.)Aurangabad
VINOD LILADHAR AGRAWALAurangabad (M Corp.)Aurangabad
MANISH RAMNIRANJAN AGRAWALAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra (CIDCO)
Permissible FSI3807.42
Proposed, not sanctioned2,185 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIDYA NAGAR, JALNA ROAD AURANGABAD
Estimated costRs 4.25 cr
Cost incurredRs 4.25 cr
Work done100.0%
BuildingWingEstimatedIncurred
SIMPLICITY B-4NARs 73.33 lakhRs 73.33 lakh
SIMPLICITY B-5NARs 73.33 lakhRs 73.33 lakh
SIMPLICITY B-6NARs 73.33 lakhRs 73.33 lakh
SIMPLICITY C-1NARs 60.00 lakhRs 60.00 lakh
SIMPLICITY C-2NARs 60.00 lakhRs 60.00 lakh
SIMPLICITY C-3NARs 60.00 lakhRs 60.00 lakh
-NARs 25.00 lakhRs 25.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrasad Kulkarni
Engineern G Karkhane
EngineerSANKET SINGI
Chartered AccountantLOYA AND MUNDADA
Chartered AccountantPooja Rathi
PartnerRole in project
Shreeram Traders and Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500019299Mar 2024 → Mar 2025

Reason as filed by the promoterOur project aims to Simplicity Phase 1 and has been progressing steadily since its initiation. However, unforeseen challenges such as “club house construction under UDCPR guideline is required for Occupancy Certificate, since this issue has been raised by CIDCO during the course of execution, which have impacted our original timeline. In light of these challenges and in order to ensure the successful completion of the project to the highest standards, we believe that an extension of 31.03.2025 would be necessary. This additional time would allow us to address the aforementioned challenges effe

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SIMPLY CITY FORM 2A.pdf17 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SIMPLY CITY FORM 5.pdf17 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SIMPLY CITY FORM 1.pdf11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SIMPLY CITY FORM 2A.pdf11 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SIMPLY CITY FORM 5.pdf11 Apr 2024
Declaration in FORM BFile: SIMPLY CITY FORM B_compressed.pdf10 Apr 2024
Declaration in FORM BFile: SIMPLY CITY FORM B_compressed.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SIMPLY CITY FORM 2_compressed.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIMPLY CITY FORM 3_compressed.pdf10 Apr 2024
Disclosure of sold/ booked inventoryFile: SIMPLY CITY SOLD UNSOLD_compressed.pdf2 Apr 2024
Copy of the legal title reportFile: Legal title_31st March_compressed.pdf26 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_compressed.pdf6 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_compressed.pdf6 Apr 2022
OtherFile: Simply City Letter 24032022.pdf24 Mar 2022
OtherFile: UDCPR.pdf24 Mar 2022
OtherFile: DA.pdf24 Mar 2022
OtherFile: DOD_compressed.pdf24 Mar 2022
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf11 Mar 2022
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf11 Mar 2022
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development (1).pdf11 Mar 2022
PAN CardFile: 1 PAN Card.pdf11 Mar 2022
Details of encumbrancesFile: 1 Details of encumbrances.pdf11 Mar 2022
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf11 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf11 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development (1).pdf11 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf11 Mar 2022
Declaration about Commencement CertificateFile: DECLARATION FORM D_compressed.pdf11 Mar 2022
Declaration in FORM BFile: SIMPLY FORM B_compressed.pdf11 Mar 2022
CERSAI detailsFile: 1 CERSAI details.pdf11 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA.pdf11 Mar 2022
Proforma of Allotment letterFile: 1 Proforma of the allotment letter and agreement for sale.pdf11 Mar 2022
Proforma of Allotment letterFile: 2 Proforma of the allotment letter and agreement for sale.pdf11 Mar 2022

How this compares with Aurangabad

27%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 12 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SIMPLICITY PHASE - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near FATTEPUR1,400+ in Aurangabad

2 kmSIMPLICITY PHASE - ICompleted 7Lapsed / revoked 3Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: Shreeram Traders and Developers

Shreeram Traders and Developers has 1 registration on MahaRERA, including SIMPLICITY PHASE - I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that SIMPLICITY PHASE - I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SIMPLICITY PHASE - I is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIMPLICITY PHASE - I?

The registered promoter entity is Shreeram Traders and Developers, an others as per the filing. Its GSTIN 27ADMPA3391B1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIMPLICITY PHASE - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIMPLICITY PHASE - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIMPLICITY PHASE - I?

The professionals named in the filing: Architect: Prasad Kulkarni; Engineer: n G Karkhane; Engineer: SANKET SINGI; Chartered Accountant: LOYA AND MUNDADA; Chartered Accountant: Pooja Rathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIMPLICITY PHASE - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIMPLICITY PHASE - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIMPLICITY PHASE - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.