Home / Browse projects / Mumbai Suburban, Maharashtra / SILVER SKYLINE

Registration lapsed No litigation declared Residential / Group Housing project

SILVER SKYLINE

By Prabhav Realty and Infrastructure Pvt Ltd

RG-MH-09595 · RERA P51800004072 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • 7 complaints at MahaRERA
  • Completion date moved by 39 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
7Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

SILVER SKYLINE is a Residential / Group Housing project by Prabhav Realty and Infrastructure Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004072 on 7 Aug 2017. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 39 months from the original filing. 7 complaints are on record with the regulator.

At a glance

Project

  • NameSILVER SKYLINE
  • TypeResidential / Group Housing
  • Location
    • JP ROAD
    • ANDHERI WEST
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004072
  • ReraGenie IDRG-MH-09595

Builder

  • NamePrabhav Realty and Infrastructure Pvt Ltd
  • Entity typeCompany
  • Managing DirectorPrashant Kantilal Lathia

Key dates

7 months past promisethis monthRegisteredAug 2017First promiseDec 2022Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Aug 2017
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed121 files

Current status

93.0%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Silver SkylineNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Silver Skyline: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes90%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,596 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation
Permissible FSI7009.0
Proposed, not sanctioned4,465 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGhatkopar west Mumbai
Estimated costRs 21.19 cr
Cost incurredRs 19.71 cr
Work done93.0%
BuildingWingEstimatedIncurred
Silver SkylineNARs 15.26 crRs 14.19 cr
-NARs 5.93 crRs 5.52 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. A N J Engineering Consultants LLP
EngineerUmesh. S. Bhavsar
Chartered AccountantJayshankar Rai & Co
Chartered AccountantRHDB & Co. LLP
Chartered AccountantB B Jain and Associates
PartnerRole in project
Prabhav Realty and Infrastructure Pvt Ltd-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012742Dec 2022 → Apr 2023

Reason as filed by the promoterU/s 6, extension is applied as construction was affected during COVID Period.

EXT51800015455Dec 2022 → Mar 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 31/03/2024

EXT51800024991Dec 2022 → Mar 2026

Reason as filed by the promoter1. The project comprises a total of 20 floors, of which construction up to the 18th floor has been successfully completed. We have also received a Part Occupancy Certificate up to the 11th floor, and possession has been offered to the allottees for the completed portion. 2. In accordance with the provisions of Section 7(3) of the RERA Act, 2016, we have obtained the written consent of more than 51% of the allottees for the proposed extension. This demonstrates the support of the majority of homebuyers towards the completion of the project. The project comprises a total of 125 units, of which 7

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000196381Jyoti NIrmal AnandPrabhav Reality & Infrastructure Private Limited19/03/2021
CC006000000196392KAMAL K KALRA AND ANITA MIRPURIPrabhav Reality & Infrastructure Private Limited19/03/2021
CC006000000012298Suyog & Rupali NimbalkarPrabhav Reality Infrastructure Pvt. Ltd.20/12/2017
CC006000000057520Vijay Harjani & Hitiksha Harjani, through Manish D. Punwani (Power of Attorney Holder)Prabhav Realty Infrastructure Private Ltd03/01/2019
CC006000000193216Lalit KumarPrashanth Lathia09/06/2020
CC006000000194896DEVKUMAR RAMANIPRABHAV REALTY AND INFRASTRUCTURE PVT. LTD.12/11/2020
CC006000000194917ASHISH HIRA LALWANIPRABHAV REALTY AND INFRASTRUCTURE PVT LTD13/11/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Apr 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Aug 2023

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: PRIPL Form 1 as on 31-03-2026.pdf2 Jul 2026
Withdrawal Update Form 2File: PRIPL Form 2 as on 31-03-2026_compressed.pdf2 Jul 2026
Withdrawal Update Form 3File: PRIPL Form -3 as on 31-03-2026_compressed.pdf2 Jul 2026
Withdrawal Update Form 1File: Form -2 as on 30-09-2025.pdf1 Jul 2026
Withdrawal Update Form 1File: Form 1 as on 31-12-2025.pdf1 Jul 2026
Withdrawal Update Form 2File: Form -2 as on 30-09-2025.pdf1 Jul 2026
Withdrawal Update Form 2File: Form -2 as on 31-12-2025.pdf1 Jul 2026
Withdrawal Update Form 3File: Form -3 as on 30-09-2025_compressed.pdf1 Jul 2026
Withdrawal Update Form 3File: Form -3 as on 31-12-2025_compressed.pdf1 Jul 2026
Withdrawal Update Form 1File: Form -1 as on 30-06-2025.pdf26 Jun 2026
Withdrawal Update Form 2File: Form -2 as on 30-06-2025.pdf26 Jun 2026
Withdrawal Update Form 3File: Form -3 as on 30-06-2025_compressed.pdf26 Jun 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 as on 31-03-2025_11zon.pdf11 Jul 2025
Certificates of CA (Form 3)File: Silverskyline Form - 3 as on 31-03-2025_11zon.pdf11 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 as on 31-03-2025_11zon.pdf11 Jul 2025
Declaration in FORM BFile: Declaration in Form B_11zon.pdf1 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 till 31-12-2024_11zon.pdf11 Mar 2025
Certificates of CA (Form 3)File: Form 3 for Qtr Ending 31-12-2024_11zon.pdf11 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Till 31-12-2024_11zon.pdf11 Mar 2025
Disclosure of sold/ booked inventoryFile: Dislosure of Sold Inventory_11zon.pdf11 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -1 A as on 30-06-2024.pdf8 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form-1 A as on 30-09-2024.pdf8 Nov 2024
Certificates of CA (Form 3)File: PRIPL Silver Skyline Form-3 as on 30-06-2024.pdf8 Nov 2024
Certificates of CA (Form 3)File: PRIPL Silver Skyline Form-3 as on 30-09-2024.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PRIPL Form-2 B as on 30-06-2024.pdf8 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PRIPL Form-2 B as on 30-09-2024.pdf8 Nov 2024
Declaration in FORM BFile: PRIPL -Silverskyline Form B.pdf5 Aug 2024
Proforma of Agreement for saleFile: Allotment letter_silver skyline.pdf30 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf24 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -1 Annex A Sep-2022.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -1 Annex A Dec-2022.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Mar 2023.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Jun 2023.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Sep 2023.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Dec 2023.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form - 2 as on 31-03-2024.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -1 Annex A Dec-2022.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -1 Annex A Mar-2023.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -1 Annex A Jun-2023.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -1 Annex A Sep-2023.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -1 Annex A Dec-2023.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRIPL Form -1 as on 31-03-2024.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Sep 2022.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Dec 2022.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Mar 2023.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Jun 2023.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Sep 2023.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PRIPL Form -2 Annex B Dec 2023.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PRIPL Form - 2 as on 31-03-2024.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PRIPL Form -2A for FY 2023-24.pdf22 Jul 2024
Certificates of CA (Form 3)File: PRIPL Form - as on 31-03-2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory.pdf17 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account Declaration.pdf17 Jul 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf17 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf17 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumrance related to legal.pdf6 Jul 2024
Details of encumbrances concerned to LegalFile: Encumrance related to legal.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PRIPL Form -2A Annex C for 2022-23.pdf6 Jul 2024
Certificates of CA (Form 3)File: Form -3 as on 30-06-2022.pdf6 Jul 2024
Certificates of CA (Form 3)File: Form -3 as on 30-09-2022.pdf6 Jul 2024
Certificates of CA (Form 3)File: Form -3 as on 31-12-2022.pdf6 Jul 2024
Certificates of CA (Form 3)File: Form -3 as on 30-06-2023.pdf6 Jul 2024
Certificates of CA (Form 3)File: Form -3 as on 30-09-2023.pdf6 Jul 2024
Certificates of CA (Form 3)File: Form -3 as on 31-12-2023.pdf6 Jul 2024
Certificates of CA (Form 3)File: Form -3 as on 31-03-2023.pdf6 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf2 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory PRIPL 25072023.pdf25 Jul 2023
Declaration about Commencement CertificateFile: CC COVERING LETTER.pdf1 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Andheri Engineer form 2A 21-22.pdf1 Jun 2023
CERSAI detailsFile: CERSAI DECLARATION.pdf1 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5 21-22.pdf1 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20 PRIPL.pdf18 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 2019 - 2020.pdf12 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificat 2019-2020.pdf12 May 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate 2019-2020.pdf12 May 2023
Disclosure of sold/ booked inventoryFile: sold - unsold inventory disclosure.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Andheri-Arch Certificate.pdf11 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Andheri-Form 2.pdf11 Jul 2022
Certificates of CA (Form 3)File: nehali AND co CA.pdf28 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Silver Skyline Architect Certificate.pdf9 Apr 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 39 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILVER SKYLINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI WEST6,700+ in Mumbai Suburban

2 kmSILVER SKYLINECompleted 102Lapsed / revoked 61Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 238 registered projects within 2 km.

Builder: Prabhav Realty and Infrastructure Pvt Ltd

Prabhav Realty and Infrastructure Pvt Ltd has 1 registration on MahaRERA, including SILVER SKYLINE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that SILVER SKYLINE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SILVER SKYLINE is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER SKYLINE?

The registered promoter entity is Prabhav Realty and Infrastructure Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER SKYLINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SILVER SKYLINE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SILVER SKYLINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER SKYLINE?

The professionals named in the filing: Architect: M/s. A N J Engineering Consultants LLP; Engineer: Umesh. S. Bhavsar; Chartered Accountant: Jayshankar Rai & Co; Chartered Accountant: RHDB & Co. LLP; Chartered Accountant: B B Jain and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER SKYLINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER SKYLINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER SKYLINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.