Home / Browse projects / Pune, Maharashtra / SILVER ORCHID

Completed No litigation declared Residential / Group Housing project

SILVER ORCHID

By SILVER ORCHID

RG-MH-74058 · RERA P52100050298 · Last updated on MahaRERA portal: 24 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
5 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

SILVER ORCHID is a Residential / Group Housing project by SILVER ORCHID in Pune, Maharashtra, registered with MahaRERA as P52100050298 on 1 Apr 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. 37 of the 42 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSILVER ORCHID
  • TypeResidential / Group Housing
  • Location
    • Pimple Nilakh
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • RERA no.P52100050298
  • ReraGenie IDRG-MH-74058

Builder

  • NameSILVER ORCHID
  • Entity typePartnership
  • PartnersGANESH VASANTRAO JADHAV, SANTOSH SITARAM BARNE, AMOL MARUTI MARNE, RANJEET VITTHALRAO MORE, DATTATRAY SHYAM BARNE, AKASH DATTATRAY SABANKAR

Key dates

this monthRegisteredApr 2023PromisedMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Apr 2023
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

88%37 of 42 units booked
99.5%Work done, per cost certificate

Figures as on 24 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SILVER ORCHIDNA10742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SILVER ORCHID: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered32
Open Space9

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNCIPAL CORPORATION
Permissible FSI3753.4
Proposed, not sanctioned1,753 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAJMERA COMPLEX PIMPRI PUNE 411018
Estimated costRs 9.00 cr
Cost incurredRs 8.95 cr
Work done99.48%
BuildingWingEstimatedIncurred
SILVER ORCHIDNARs 8.10 crRs 8.06 cr
-NARs 90.00 lakhRs 89.53 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBALAJI GAIKWAD
ArchitectDESIGNS ASSOCIATES
EngineerRAGHAVENDRA ANKALGI
EngineerNAGESH JATHAR
Chartered AccountantNAVDEEP JINDAL
Chartered AccountantPRACHI S AGARWAL
PartnerRole in project
SILVER ORCHID-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Completion SS.pdf24 Jul 2025
Occupational CertificateFile: Orchid Completion Certificates.pdf23 Jun 2025
Form 1File: Architects Certificate.pdf21 Jun 2025
Form 2File: Engineer Certificate (1).pdf21 Jun 2025
Form 3File: CA Certificate silver orchid dec 23.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory Dec 23.pdf21 Jun 2025
Form 5 (FY 2023-2024)File: form 5.pdf21 Jun 2025
Form 1File: Architect Certificate.pdf18 Jun 2025
Form 2File: Engineer Certificates - converted.pdf18 Jun 2025
Form 3File: Silver Orchid Form 3 Jun 24.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Book Inventory.pdf18 Jun 2025
Form 1File: Architect Certificate Annexure A Form 1.pdf18 Jun 2025
Form 2File: FORM 2 Silver Orchid Mar-24.pdf18 Jun 2025
Form 3File: Form 3 - silver orchid Mar 24 signed.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List Silver Orchid.pdf18 Jun 2025
Form 1File: form 1.pdf18 Jun 2025
Form 2File: form 2.pdf18 Jun 2025
Form 3File: form 3.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: disclousre of sold unsold inventory.pdf18 Jun 2025
Form 1File: Form 1 Architect Certificate.pdf10 Jun 2025
Form 2File: Form 2 Engineer Certificates.pdf10 Jun 2025
Form 3File: Form 3 CA Certificates Signed_.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Discloser of Sold Unsold Flat Q 4.pdf10 Jun 2025
Form 1File: Form 1 Architects Certificates.pdf10 Jun 2025
Form 2File: FORM 2 Silver Orchid Dec 24_.pdf10 Jun 2025
Form 3File: Form 3 CA Certificats Q 3_.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Discloser of Sold Unsold Flat Q 3.pdf10 Jun 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf10 Jun 2025
Withdrawal Update Form 2File: form 2 new.pdf10 Jun 2025
Withdrawal Update Form 3File: Form 3 CA Certificates Signed_.pdf10 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechts Certificate.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificats Q 3_.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificates Signed_.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Silver Orchid Dec 24_.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificates.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Discloser of Sold Unsold Flat Q 3.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Discloser of Sold Unsold Flat Q 4.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Silver Orchid Form 5.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificates - converted.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Book Inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silver Orchid Form 3 Jun 24.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Annexure A Form 1.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Silver Orchid Mar-24.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List Silver Orchid.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - silver orchid Mar 24 signed.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: silver orchid form-3 signed_compressed.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (1) (1).pdf2 Jan 2024
Building plan approvalFile: plan1 85,2023.pdf27 Dec 2023
Building plan approvalFile: plan2 85,2023.pdf27 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: plan1 85,2023.pdf27 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: plan2 85,2023.pdf27 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: commisment 85,2023.pdf27 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: orchid Fire NOC.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 silver orchid.pdf27 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate silver orchid dec 23.pdf26 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Formate A.pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificates.pdf12 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificates.pdf12 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificates (1).pdf12 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A.pdf12 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf28 Mar 2023
Proforma of Agreement for saleFile: DRAFT AGREEMENT - BY LEGAL REALTY LLP.pdf20 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Updated Deviation Report of Silver Orchid.pdf20 Mar 2023
Other - FinanceFile: ENCUMBRANCE - FINANCE.pdf17 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf14 Mar 2023
Copy of the legal title reportFile: SEARCH REPORT.pdf13 Mar 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf13 Mar 2023
Declaration in FORM BFile: FORM B - PROMOTER.pdf13 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf13 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Orchid.pdf13 Mar 2023
CERSAI detailsFile: CERSAI Receipt.pdf13 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf13 Mar 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT - ALLOTMENT.pdf13 Mar 2023
Layout approvalFile: 2.pdf11 Mar 2023
Building plan approvalFile: 1.pdf11 Mar 2023
PAN CardFile: Pan Card Silver Orchid.pdf11 Mar 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE.pdf11 Mar 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE.pdf11 Mar 2023

How this compares with Pune

88%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILVER ORCHID on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimple Nilakh13,700+ in Pune

Builder: SILVER ORCHID

SILVER ORCHID has 1 registration on MahaRERA, including SILVER ORCHID. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SILVER ORCHID is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER ORCHID?

The registered promoter entity is SILVER ORCHID, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER ORCHID?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVER ORCHID?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER ORCHID?

The professionals named in the filing: Architect: BALAJI GAIKWAD; Architect: DESIGNS ASSOCIATES; Engineer: RAGHAVENDRA ANKALGI; Engineer: NAGESH JATHAR; Chartered Accountant: NAVDEEP JINDAL; Chartered Accountant: PRACHI S AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER ORCHID?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER ORCHID. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER ORCHID to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.