Red flags

  • Litigation declared, 14 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SILVER JEWEL is a Others project by AARYAN ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052454 on 8 Sep 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameSILVER JEWEL
  • TypeOthers
  • Location
    • M G ROAD
    • MULUND WEST
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052454
  • ReraGenie IDRG-MH-06560

Builder

  • NameAARYAN ENTERPRISES
  • Entity typePartnership
  • PartnersDILIP CHAMPSHI SHAH, MAYUR PRAKASH THAKKAR, OM PRAKASH SHIV DAS DAGA, SHREE SHANESHWAR INDUSTRIES LTD

Key dates

this monthRegisteredSep 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Sep 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed73 files

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,342 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 May 2025
LandownerVillageDistrict
MAHAVIR DEVELOPERMulundMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8087.0
Proposed, not sanctioned2,514 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIKAS PALAZZO, MULUND WEST, MUMBAI 400080

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGOPAL N UTEKAR
EngineerASHISH H PATOLE
Chartered AccountantMalvika & Associates Chartered Accountants
Chartered AccountantAnkit M Jain & Co Chartered Accountants
Chartered AccountantYatin Ruparel & Co
PartnerRole in project
AARYAN ENTERPRISES-

Litigation declared14

CaseCourtStatus
101649/2018City Civil Court MumbaiHearing
102989/2018City Civil Court MumbaiHearing
102990/2018City Civil Court MumbaiHearing
102220/2018City Civil Court MumbaiHearing
216/2020Bombay High CourtHearing
80/2020Bombay High CourtHearing
RAD/0000349/2018Small Cause Court Dhobi TalaoHearing
RAD/0000356/2018Small Cause Court Dhobi TalaoHearing
RAD/0000350/2018Small Cause Court Dhobi TalaoHearing
RAD/0000348/2018Small Cause Court Dhobi TalaoHearing
RAD/0000381/2018Small Cause Court Dhobi TalaoHearing
RAD/0000351/2018Small Cause Court Dhobi TalaoHearing
102561/2018City Civil Court MumbaiHearing
RAD/0000403/2018Small Cause Court Dhobi TalaoHearing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FOrm1.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form2.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: FOrm1.pdf23 Feb 2026
Withdrawal Update Form 2File: Form2.pdf23 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf23 Feb 2026
Withdrawal Update Form 1File: ARCH CERTI 300625.pdf18 Oct 2025
Withdrawal Update Form 1File: Form 1A Architect Certificate.pdf18 Oct 2025
Withdrawal Update Form 2File: Engineers Certificate 30062025.pdf18 Oct 2025
Withdrawal Update Form 2File: ENGINER CERTIFICATE( ARYAN).pdf18 Oct 2025
Withdrawal Update Form 3File: C A CERTI 300625.pdf18 Oct 2025
Withdrawal Update Form 3File: AE - Form 3 - 30092025.pdf18 Oct 2025
Withdrawal Update Form 1File: ARCH CERTI 300625.pdf4 Sep 2025
Withdrawal Update Form 2File: Form 2 032024.pdf4 Sep 2025
Withdrawal Update Form 3File: C A CERTI 300625.pdf4 Sep 2025
Building plan approvalFile: Plan1.pdf29 May 2025
Building plan approvalFile: Plan2.pdf29 May 2025
Form 1File: AE ARCH CERTI 310325.pdf29 May 2025
Form 1File: AE ARCHI CERTI 311224.pdf29 May 2025
Form 3File: AE CA CERTI 311224.pdf29 May 2025
Form 2File: Form2 311224.pdf29 May 2025
Form 1File: Form 1 092024.pdf29 May 2025
Form 2File: Form2 092024.pdf29 May 2025
Form 3File: 4 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf29 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AARYAN ENT signed.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Aryan Enterprise_CA Signed.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1.pdf14 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Certificate 13072024.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 032024.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - 202403.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arc Certificate 03042024.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 122023.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ankit m Jain Co.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaryan Ent Form 1 Architect Certificate.pdf25 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC.pdf8 Dec 2023
Layout approvalFile: IOD PLAN 1 - Latest Highlighte.pdf21 Aug 2023
Building plan approvalFile: IOD Copy.pdf21 Aug 2023
Building plan approvalFile: IOD PLAN 1 - Latest Highlighte.pdf21 Aug 2023
Building plan approvalFile: IOD PLAN 2.pdf21 Aug 2023
PAN CardFile: AARYAN ENTERPRISES PAN CARD.pdf21 Aug 2023
Copy of the legal title reportFile: Title and Search Report 20230717.pdf21 Aug 2023
Details of encumbrances concerned to FinanceFile: FE.pdf21 Aug 2023
Details of encumbrances concerned to FinanceFile: Emcumbrance Letter Legal Latest.pdf21 Aug 2023
Details of encumbrances concerned to LegalFile: FE.pdf21 Aug 2023
Details of encumbrances concerned to LegalFile: Emcumbrance Letter Legal Latest.pdf21 Aug 2023
Copy of Layout Approval (in case of layout)File: IOD PLAN 1 - Latest Highlighte.pdf21 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD Copy.pdf21 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD PLAN 1 - Latest Highlighte.pdf21 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD PLAN 2.pdf21 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf21 Aug 2023
Declaration about Commencement CertificateFile: Declaration for CC 16082023.pdf21 Aug 2023
Declaration in FORM BFile: Form B Affadavit Cum Declaration 23062023.pdf21 Aug 2023
CERSAI detailsFile: CERSAI.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 210823.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DS.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: OD.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MT.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SSIL.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SSIL2.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SSIL3.pdf21 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SSIL4.pdf21 Aug 2023
Proforma of Agreement for saleFile: RERA AGREEMENT 29082023.pdf21 Aug 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf21 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank.pdf21 Aug 2023
Deviation Report with respect to Allotment letterFile: DAL.pdf21 Aug 2023
Deviation Report with respect to model copy of AgreementFile: DAFS2.pdf21 Aug 2023
Other - LegalFile: CTS Ltr.pdf21 Aug 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILVER JEWEL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

2 kmSILVER JEWELCompleted 113Lapsed / revoked 95Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 350 registered projects within 2 km.

Builder: AARYAN ENTERPRISES

AARYAN ENTERPRISES has 1 registration on MahaRERA, including SILVER JEWEL. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SILVER JEWEL is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER JEWEL?

The registered promoter entity is AARYAN ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER JEWEL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVER JEWEL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER JEWEL?

The professionals named in the filing: Architect: GOPAL N UTEKAR; Engineer: ASHISH H PATOLE; Chartered Accountant: Malvika & Associates Chartered Accountants; Chartered Accountant: Ankit M Jain & Co Chartered Accountants; Chartered Accountant: Yatin Ruparel & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER JEWEL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER JEWEL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER JEWEL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.