Home / Browse projects / Aurangabad, Maharashtra / SILVER CRYSTAL

Registration lapsed No litigation declared Residential / Group Housing project

SILVER CRYSTAL

By VIKAS LAXMAN CHAUDHARY

RG-MH-08042 · RERA P51500017397 · Last updated on MahaRERA portal: 13 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 9 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

SILVER CRYSTAL is a Residential / Group Housing project by VIKAS LAXMAN CHAUDHARY in Aurangabad, Maharashtra, registered with MahaRERA as P51500017397 on 9 Aug 2018. Possession was promised by 30 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameSILVER CRYSTAL
  • TypeResidential / Group Housing
  • Location
    • JAY NAGAR
    • SHAHANOORWADI
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500017397
  • ReraGenie IDRG-MH-08042

Builder

  • NameVIKAS LAXMAN CHAUDHARY
  • Entity typeIndividual
  • Other registrations13 more →
  • Completed5 of 14
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

22 months past promisethis monthRegisteredAug 2018PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2018
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SILVER CRYSTALNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SILVER CRYSTAL: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered16
Open Space4

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area700 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1236.0
Proposed, not sanctioned1,236 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKUSHALNAGAR JALNA ROAD AURANGABAD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH V KALE FOR MANISH KALE & ASSOCIATES
EngineerN G KARKHANE
PartnerRole in project
VIKAS LAXMAN CHAUDHARY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: FORM 3 24-25 Q3, Signed.pdf13 May 2025
Certificates of CA (Form 3)File: Form 3 2020-21_.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3 2021-22_.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3 2022-23 Q4_.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3 2023-24 Q4_.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3 2024-25 Q1_.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3 2024-25 Q2_.pdf24 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2021-22.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2023-24 Q4.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2024-25 Q2.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2024-25 Q3.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2020-21.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2023-24 Q4.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2024-25 Q3.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2024-25 Q2.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2024-25 Q1.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2021-22.pdf11 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2020-21.pdf11 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2023-24 Q4.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2021-22.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2023-24 Q4.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q1.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold unsold 2024-25 Q2.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q3.pdf11 Feb 2025
Declaration about Commencement CertificateFile: Declaration About Commencement Cer.pdf11 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf11 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F-1 SILVER CRYSTAL DEC-20.pdf9 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F-2 ENGG CERT SILVER CRYSTAL DEC-20.pdf9 Aug 2021
Certificates of CA (Form 3)File: SEP20- FORM 3 - CA Cert SILVER CRYSTAL udin.pdf15 Apr 2021
Certificates of CA (Form 3)File: DEC20- FORM 3 - CA Cert SILVER CRYSTAL udin.pdf15 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: REV PER SILVER CRYSTAL.pdf8 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F-1 SILVER CRYSTAL JUN-20.pdf5 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F-1 SILVER CRYSTAL SEP-20.pdf5 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F-2 SILVER CRYSTAL.pdf5 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F-2 SILVER CRYSTAL SEP-20.pdf5 Dec 2020
Layout approvalFile: MYSCAN_20190827_0003.PDF3 Dec 2020
Layout approvalFile: MYSCAN_20190827_0004.PDF3 Dec 2020
Building plan approvalFile: MYSCAN_20190827_0003.PDF3 Dec 2020
Building plan approvalFile: MYSCAN_20190827_0004.PDF3 Dec 2020
Copy of Layout Approval (in case of layout)File: MYSCAN_20190827_0003.PDF3 Dec 2020
Copy of Layout Approval (in case of layout)File: MYSCAN_20190827_0004.PDF3 Dec 2020
Building Plan Approval (IOD)File: MYSCAN_20190827_0003.PDF3 Dec 2020
Building Plan Approval (IOD)File: MYSCAN_20190827_0004.PDF3 Dec 2020
Certificates of CA (Form 3)File: Ca Certificate Silver Crystal.pdf22 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F-1 SILVER CRYSTAL.pdf7 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F-2 SILVER CRYSTAL MAR-20.pdf7 Aug 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: f-5 2017-18 silver crystal.pdf28 Mar 2020
Form 2AFile: F2A SILVER CRYSTAL.pdf17 Feb 2020
Certificates of CA (Form 3)File: Silver Crystal.pdf4 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F-2 SILVER CRYSTAL DEC-19.pdf16 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F-1 SILVER CRYSTAL DEC-19.pdf15 Jan 2020
Certificates of CA (Form 3)File: Silver Crystal 30-09-19.pdf11 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ''Silver crystal''.pdf29 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F-1 SILVER CRYSTAL SEP-19.pdf15 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F-2 SILVER CRYSTAL SEP19.pdf15 Nov 2019
Form 2AFile: F-2A SILVER CRYSTAL.pdf15 Nov 2019
Certificates of CA (Form 3)File: silver crystal.pdf13 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate silver crystal 1507.pdf19 Jul 2019
Form 2AFile: engineer certificate silver crystal 1507.pdf19 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F-1 SILVER CRYSTAL.pdf18 Jul 2019
Form 2AFile: F 2A SILVER CRYSTAL.pdf18 Jul 2019
Certificates of CA (Form 3)File: silver crystal as on 31-03-2019.pdf20 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 CRYSTAL M-19.pdf30 Apr 2019
Form 2AFile: F-2A CRYSTAL D-18.pdf30 Apr 2019
Form 2AFile: F-2A CRYSTAL M-19.pdf30 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F-1 SILVER CRYSTAL M-19.pdf29 Apr 2019
Certificates of CA (Form 3)File: Silver Crystal.pdf4 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SILVER CRYSTAL ARCHIT CER 15-1-19.pdf19 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SILVER CRYSTAL ENG150119-min.pdf19 Feb 2019
Certificates of CA (Form 3)File: Sai Silver Crystal.pdf5 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG SILVER CRYSTAL.pdf28 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch silver crystal sept18.pdf26 Nov 2018
Declaration in FORM BFile: FORM B.pdf1 Aug 2018
Certificates of CA (Form 3)File: silver crystal CA CERTIFICATE.pdf1 Aug 2018
Proforma of Allotment letterFile: DRAFT AGREEMENT TO SALE SILVER CRYSTALL.pdf1 Aug 2018
Layout approvalFile: MYSCAN_20180725_0003.PDF30 Jul 2018
Copy of the legal title reportFile: Search Report silver crystal.pdf30 Jul 2018
Copy of Layout Approval (in case of layout)File: MYSCAN_20180725_0003.PDF30 Jul 2018

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SILVER PEARLSSPLOT NO 1 CTS NO 15735 -30-2 ULKANAGARI AURANGABAD53CompletedNov 2018Jun 2018
SAI SAMPADA PARK PHASE 1GUT NO 158 PART VILLAGE SATARA TALUKA DIST AURANGABAD60CompletedJun 2017Jun 2017
SAI SHRADDHA PARK PHASE 1GUT NO 22 P WADGAON KOLHATI WALUJ MAHANAGAR AURANGABAD169CompletedApr 2017Apr 2017
SAI EXOTICAPLOT NO 21 4 CTS NO 20758 BEHIND SANT EKNATH RANGMANDIR NEW OSMANPURA AURANGABAD11CompletedDec 2015Dec 2015
SAI SANKET PARKGUT NO 106 PART SATARA TQ.DIST. AURANGABAD127CompletedJun 2014Jun 2014
SAI HERITAGEPlot No 2 CTS No 15735 30 Garkheda Tq Dist Aurangabad.33CompletedApr 2014Apr 2014
SAI RAM ENCLAVEPLOT NO 69 & 70 CTS NO 18349 1 77 & 18349 1 78 VEDANT NAGAR AURANGABAD12CompletedAug 2012Aug 2012
SANKALP PARKGut No 106 Village Satara Tq Dist Aurangabad.38CompletedAug 2012Aug 2012
SAI SHRUSHTI PARKGut No 44 CIDCO Waluj Mahanagar IV Golwadi Tq Dist Aurangabad.69CompletedAug 2012Aug 2012

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SILVER CRYSTAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHAHANOORWADI1,400+ in Aurangabad

2 kmSILVER CRYSTALCompleted 34Lapsed / revoked 20Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: VIKAS LAXMAN CHAUDHARY

VIKAS LAXMAN CHAUDHARY has 14 registrations on MahaRERA, including SAI ASPIRE and SILVER PEARLSS. Its filings disclose 11 earlier MahaRERA projects: declares 10 of 11 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that SILVER CRYSTAL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SILVER CRYSTAL is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER CRYSTAL?

The registered promoter entity is VIKAS LAXMAN CHAUDHARY, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER CRYSTAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVER CRYSTAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER CRYSTAL?

The professionals named in the filing: Architect: MANISH V KALE FOR MANISH KALE & ASSOCIATES; Engineer: N G KARKHANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER CRYSTAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER CRYSTAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER CRYSTAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.