Home / Browse projects / Ratnagiri, Maharashtra / SIDDHTANU HILLSIDE
SIDDHTANU HILLSIDE
RG-MH-35045 · RERA P52800032141 · Last updated on MahaRERA portal: 25 Nov 2024
Source: official MahaRERA filing
Red flags
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHTANU HILLSIDE is a Residential / Group Housing project by SIDDHTANU DEVELOVERS in Ratnagiri, Maharashtra, registered with MahaRERA as P52800032141 on 14 Dec 2021. The registration is recorded completed; possession was promised by 30 Sep 2024. The completion date has moved by 6 months from the original filing.
At a glance
Project
- NameSIDDHTANU HILLSIDE
- TypeResidential / Group Housing
- Location
- KOKAMBALI
- NEAR SWAMI SAMARTH MANDIR
- Dapoli Camp
- Dapoli
- Ratnagiri
- 415712
- Pincode415712
- RERA no.P52800032141
- ReraGenie IDRG-MH-35045
Builder
- NameSIDDHTANU DEVELOVERS
- Entity typePartnership
- GSTIN27ABSFS9702J1ZG
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersSIDDHESH SANDESH NAGWEKAR, SHARAYU SANDESH NAGWEKAR
- Other registrations1 more →
- Completed1 of 2
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Dec 2021
- Promised completion30 Sep 2024
- Revised completionRevised to 30 Sep 2024 (originally 31 Mar 2024)
- Buildings2 building records
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIDDHTANU HILLSIDE | NA | 7 | 0 | 0 | 0 | 0 |
| SIDDHTANU HILLSIDE | NA | 1 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 70%.
SIDDHTANU HILLSIDE65%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
SIDDHTANU HILLSIDE82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed16
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SANDESH C NAGWEKAR | Mumbai City | Mumbai City |
| NARSINHA V TIKARE | Dapoli Camp | Ratnagiri |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR GANESH RAUT |
| Engineer | SIDDHESH N GUJARATI |
| Engineer | REJI KUNJUKUTTY |
| Chartered Accountant | R K CHAUDHARY |
| Chartered Accountant | SANDESH NAGWEKAR |
| Partner | Role in project |
|---|---|
| SIDDHTANU DEVELOVERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir, This is to inform you that, we have received Rera Registration Certificate of our project “ Siddhatanu Hill Side” consist of Wing A& B situated at Plot Bearing / CTS / Survey / Final Plot No.: 3 0/1A3, 30/A/1/A/4 at Dapoli Camp , Dapoli, Ratnagiri,- 415712. which is valid till 31/03/2024. As per Architect certificate, 95% (Approximately) construction work has been completed up to 31st March 2024 and expected to complete balance work by 30th September 2024. Our major construction work was completed, but due to the election code of conduct and election duty of government staff, we coul
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Oct 2024
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form No 4.pdf | 25 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SiddhaTanu_Project OC170502024.pdf | 19 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Engineer Certificate.pdf | 19 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect Certificate.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3.pdf | 1 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No 5.pdf | 19 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM NO 2A.pdf | 11 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM NO 2A.pdf | 11 Jun 2024 |
| Declaration in FORM BFile: 03_Affidavit cum Declaration Form B.pdf | 24 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg_Certificate.pdf | 24 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No_03.pdf | 24 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No_03.pdf | 24 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexture_SSN.pdf | 24 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Mrs_SSN.pdf | 24 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold_Booked Inventory.pdf | 21 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A__MNC.pdf | 21 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_2022_2023.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_31-03-2024.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CAFormNo03.pdf | 30 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 3 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form_1_30-09-2023.pdf | 31 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 31 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf | 6 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect_certicate_2.pdf | 23 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3_compressed (1).pdf | 23 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Declaration.pdf | 12 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf | 12 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DICLREATION OF SEPARATE ACOUNT.pdf | 12 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhatanu_Rera_Certificate-compressed.pdf | 9 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate.pdf | 9 Aug 2022 |
| Copy of the legal title reportFile: Adobe Scan 03 Dec 2021 (1).pdf | 3 Dec 2021 |
| Copy of the legal title reportFile: sarch report 2.pdf | 3 Dec 2021 |
| Copy of the legal title reportFile: Adobe Scan 03 Dec 2021.pdf | 3 Dec 2021 |
| Copy of the legal title reportFile: sarch report 1 (1).pdf | 3 Dec 2021 |
| Details of encumbrancesFile: Encumbrance Declaration.pdf | 3 Dec 2021 |
| Declaration about Commencement CertificateFile: Adobe Scan 03 Dec 2021 (2) (1).pdf | 3 Dec 2021 |
| CERSAI detailsFile: Decleration.pdf | 3 Dec 2021 |
| Proforma of Allotment letterFile: Agreement for sale.pdf | 3 Dec 2021 |
| Proforma of Allotment letterFile: Agreement for sale1.pdf | 3 Dec 2021 |
| Proforma of Allotment letterFile: Agreement for sale 2.pdf | 3 Dec 2021 |
| Building plan approvalFile: 0 - GFR.pdf | 2 Dec 2021 |
| Building plan approvalFile: 1- FFR_compressed.pdf | 2 Dec 2021 |
| Building plan approvalFile: 2- SFR_compressed.pdf | 2 Dec 2021 |
| Building plan approvalFile: 3 - TFR_compressed.pdf | 2 Dec 2021 |
| Building plan approvalFile: 4- FLR_compressed.pdf | 2 Dec 2021 |
| Building plan approvalFile: 5 FFR_compressed.pdf | 2 Dec 2021 |
| Building plan approvalFile: 6 SFR_compressed.pdf | 2 Dec 2021 |
| Building plan approvalFile: 7- SEFR_compressed.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 0 - GFR.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 1- FFR_compressed.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 2- SFR_compressed.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 - TFR_compressed.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 4- FLR_compressed.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 FFR_compressed.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 SFR_compressed.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 7- SEFR_compressed.pdf | 2 Dec 2021 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 2 Dec 2021 |
| Declaration in FORM BFile: FormB_compressed.pdf | 24 Nov 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg_Cert_.pdf | 23 Nov 2021 |
| Layout approvalFile: Layout.pdf | 22 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 22 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 19 Nov 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CACERT.pdf | 19 Nov 2021 |
| Building plan approvalFile: Project Plan Sheet 1_3.pdf | 17 Nov 2021 |
| Building plan approvalFile: Project Plan Sheet 2_3.pdf | 17 Nov 2021 |
| Building plan approvalFile: Project Plan Sheet 3_3.pdf | 17 Nov 2021 |
| PAN CardFile: Pancard (Siddhtanu Developers).pdf | 17 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Project Plan Sheet 1_3.pdf | 17 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Project Plan Sheet 2_3.pdf | 17 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Project Plan Sheet 3_3.pdf | 17 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Certificate (1).pdf | 17 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Permission.pdf | 17 Nov 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
Keep SIDDHTANU HILLSIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR SWAMI SAMARTH MANDIR1,100+ in Ratnagiri
KONKAN TRAILS LIFESPACE
KONKANTRAILSLIFESPACELLP
Cape of Bliss Phase 1A
HOABL Management LLP
VIAA VISION
VIAA VISION
COASTAL BREEZE
UNIVERSAL PROPERTIES
VRUNDAVAN
EMPIRE REALTORS AND DEVELOPERS
Cape of Bliss Phase I
Lodha Management LLP
See every Ratnagiri project, with the district possession charts
Builder: SIDDHTANU DEVELOVERS
SIDDHTANU DEVELOVERS has 2 registrations on MahaRERA, including SIDDHTANU HILLSIDE and SIDDHATANU LANDMARK. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What are my rights if SIDDHTANU HILLSIDE is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHTANU HILLSIDE?
The registered promoter entity is SIDDHTANU DEVELOVERS, a partnership as per the filing. Its GSTIN 27ABSFS9702J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHTANU HILLSIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIDDHTANU HILLSIDE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHTANU HILLSIDE?
The professionals named in the filing: Architect: MR GANESH RAUT; Engineer: SIDDHESH N GUJARATI; Engineer: REJI KUNJUKUTTY; Chartered Accountant: R K CHAUDHARY; Chartered Accountant: SANDESH NAGWEKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHTANU HILLSIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback