SIDDHIVINAYAK ARCADE

By SIDDHIVINAYAK BUILDERS & DEVELOPERS

RG-MH-07126 · RERA P51700077227 · Last updated on MahaRERA portal: 29 Nov 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Internal walls, 90%
12 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

SIDDHIVINAYAK ARCADE is a Residential / Group Housing project by SIDDHIVINAYAK BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700077227 on 31 Jul 2024. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 13 of the 25 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSIDDHIVINAYAK ARCADE
  • TypeResidential / Group Housing
  • Location
    • TUKARAM NAGAR DOMBIVLI
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700077227
  • ReraGenie IDRG-MH-07126

Builder

  • NameSIDDHIVINAYAK BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersSUJEET BAJEERAV MAHAJAN, NILESH ANANT MHATRE, PUSHPAK MANOHAR KALAN, RAMLAL GANESHRAM BHATI
  • Other registrations5 more →
  • Completed1 of 6
  • Declared earlier projects4 →

Key dates

this monthRegisteredJul 2024First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2024
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed57 files

Current status

52%13 of 25 units booked
89.3%Work done, per cost certificate

Figures as on 29 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHIVINAYAK ARCADENA6620525

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

SIDDHIVINAYAK ARCADE: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered1
Open Space26

Land and ownership10

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area304 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Dec 2025
LandownerVillageDistrict
SHALIK BALIRAM MADHAVIDOMBIVLIThane
BALIRAM GANPAT MADHAVIDOMBIVLIThane
MANDA SHALIK MADHAVIDOMBIVLIThane
BHALCHANDRA BALIRAM MADHAVIDOMBIVLIThane
ARUNA BHALCHANDRA MADHAVIDOMBIVLIThane
SUDHA ASHOK MADHAVIDOMBIVLIThane
BHUSHAN ASHOK MADHAVIDOMBIVLIThane
HARSHAD SUDHA ASHOK MADHAVIDOMBIVLIThane
SHOBHA ABHIMANYU PATILDOMBIVLIThane
ROHINI VASANT PATILDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI1670.59
Proposed, not sanctioned978 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIDC DOMBIVLI EAST BRACNH
Estimated costRs 3.87 cr
Cost incurredRs 3.46 cr
Work done89.29%
BuildingWingEstimatedIncurred
SIDDHIVINAYAK ARCADENARs 3.72 crRs 3.46 cr
-NARs 15.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBalchandra Ranade
EngineerGanesh Akadkar
Chartered AccountantJ. L. Agrawal & Co.
PartnerRole in project
SIDDHIVINAYAK BUILDERS & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04122518532Dec 2025 → Dec 2026

Reason as filed by the promoterDevelopment Works in the Project is approximately 90% Completed. We require Extension of RERA Registration of our Project due to the reasons such as Application for Lift NOC is to be made & then Approval is to be Received, Fire System NOC is to be Received, Application for Occupancy Certificate (OC) is to be made and then Approval is to be received. For Sale of Flats. For Registration in Registrar Office of Flats and Shops. For Customers to take Loan from Bank / Financial Institution.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A Portal.pdf29 Nov 2025
Form 1File: Form 1 Mar 25.pdf28 Nov 2025
Form 2File: Form 2 Mar 25.pdf28 Nov 2025
Form 3File: Form 3 Mar 25.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory 31-03-25.pdf28 Nov 2025
Form 1File: Form 1 Jun 25.pdf28 Nov 2025
Form 2File: Form 2 Jun 25.pdf28 Nov 2025
Form 3File: Form 3 Jun 25.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory Jun 25.pdf28 Nov 2025
Form 1File: Form 1 Sep 25.pdf28 Nov 2025
Form 2File: Form 2 Sep 25.pdf28 Nov 2025
Form 3File: Form 3 Sep 25.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory Sep 25.pdf28 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Mar 25 Portal.pdf28 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dt 31-12-24.pdf24 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dt 31-12-24.pdf24 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dt 31-12-24.pdf24 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold_booked inventory dt 31-12-24.pdf24 Mar 2025
Layout approvalFile: Layout Plan Revised.pdf28 Dec 2024
Building plan approvalFile: CC Revised.pdf28 Dec 2024
Building plan approvalFile: Layout Plan Revised.pdf28 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout Plan Revised.pdf28 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Revised.pdf28 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: CC Revised.pdf28 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan Revised.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-24.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-09-24.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-24.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory 30-09-24.pdf26 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Siddhivinayak Arcade Nikhil Bandu Patil and others Annexure A.pdf22 Jul 2024
Copy of the legal title reportFile: TITLE REPORT_1 (3 files merged).pdf4 Jul 2024
Other - TechnicalFile: AA.pdf19 Jun 2024
Other - TechnicalFile: Siddhivinayak UDPCR letter.pdf9 May 2024
Other - TechnicalFile: Siddhivinayak Builders and Developers Annexure A declaration undertaking.pdf3 Apr 2024
Other - TechnicalFile: 1111 (2).pdf3 Apr 2024
Other - TechnicalFile: Siddhivinayak Arcade Appendix F R K Associates.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: Siddhivinayak Arcade Encumbrance to Finance_0001.pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: Siddhivinayak Arcade Legal Litigation Encumbrance_0001.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: Siddhivinayak Arcade Encumbrance to Finance_0001.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: Siddhivinayak Arcade Legal Litigation Encumbrance_0001.pdf7 Feb 2024
Declaration about Commencement CertificateFile: Siddhivinayak Arcade Declaration Commencement certificate_0001.pdf7 Feb 2024
Declaration in FORM BFile: Siddhivinayak Arcade Form B Declaration Nikhil Bandu Patil.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhivinayak Arcade Architech certificate R K Associates.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Siddhivinayak Arcade Engineer certificate Form 2 Aniruddha consu_0001.pdf7 Feb 2024
CERSAI detailsFile: Siddhivinayak Arcade Cersai letter_0001.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate - converted.pdf7 Feb 2024
Proforma of Allotment letterFile: Siddhivinayak Arcade Model Form of Allotment letter_0001 - converted.pdf7 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Siddhivinayak Arcade Declaration Separate Bank Account_0001.pdf7 Feb 2024
Deviation Report with respect to Allotment letterFile: Siddhivinayak Arcade Deviation Report Allotment letter_0001.pdf7 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Siddhivinayak Arcade Deviation Report Agreement copy_0001.pdf7 Feb 2024
Proforma of Agreement for saleFile: Siddhivinayak_Arcade (1).pdf13 Jan 2024
Layout approvalFile: PLAN SIDDHI (1).pdf1 Jan 2024
Building plan approvalFile: PLAN SIDDHI (1).pdf1 Jan 2024
PAN CardFile: Siddhivinayak Builders Developers (1).pdf1 Jan 2024
Copy of Layout Approval (in case of layout)File: PLAN SIDDHI (1).pdf1 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN SIDDHI (1).pdf1 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 20231003183219 (1).pdf1 Jan 2024

How this compares with Thane

52%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHIVINAYAK ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TUKARAM NAGAR DOMBIVLI7,600+ in Thane

Builder: SIDDHIVINAYAK BUILDERS & DEVELOPERS

Siddhivinayak Builders & Developers has 6 registrations on MahaRERA, including Siddhivinayak Nagar City Center and Siddhivinayak Nagar Lilly and Rose. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SIDDHIVINAYAK ARCADE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHIVINAYAK ARCADE?

The registered promoter entity is SIDDHIVINAYAK BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHIVINAYAK ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIDDHIVINAYAK ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHIVINAYAK ARCADE?

The professionals named in the filing: Architect: Balchandra Ranade; Engineer: Ganesh Akadkar; Chartered Accountant: J. L. Agrawal & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHIVINAYAK ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHIVINAYAK ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHIVINAYAK ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.