Home / Browse projects / SIDDHI YOG
SIDDHI YOG
By SIDDHITECH DEVELOPERS PRIVATE LIMITED
RG-MH-79863 · RERA P51900017229 · Last updated on MahaRERA portal: 8 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 24 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHI YOG is a Others project by SIDDHITECH DEVELOPERS PRIVATE LIMITED in MAHIM, 400016, registered with MahaRERA as P51900017229 on 24 Jul 2018. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 16 of the 16 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameSIDDHI YOG
- TypeOthers
- Location
- SITALADEVI TEMPLE ROAD
- MAHIM
- 400016
- Pincode400016
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900017229
- ReraGenie IDRG-MH-79863
Builder
- NameSIDDHITECH DEVELOPERS PRIVATE LIMITED
- Entity typeCompany
- DirectorsPIYUSH KANTILAL GADA, Santosh Uttam Kamthe
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Jul 2018
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed127 files
Current status
Figures as on 8 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIDDHI YOG | NA | 23 | 16 | 16 | 0 | 16 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
SIDDHI YOG: 92% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 8 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed43
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Chartered Accountant | NB Sayed & Associates |
| Partner | Role in project |
|---|---|
| SIDDHITECH DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The major reason for the delay is the stop-work order issued by MHADA dated 11th October 2023, which halted the project temporarily. We are pleased to inform you that this order has now been withdrawn, as evidenced by the withdrawal order issued on 2nd December 2024, which is attached herewith for your reference. In addition to the above, the project experienced challenges related to procurement, unforeseen site conditions, coordination issues, and temporary financial constraints. Despite these setb
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31-12-2025
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000056758 | AMIT ARUN GHARAT | SIDDHITECH DEVELOPERS PRIVATE LIMITED | 29/10/2018 |
| CC006000000408444 | Amit Arun Gharat | Siddhitech Developers Private Limited | 11/12/2023 |
| CC006000000591533 | Kishan Jhan, Sarojini Jham, Ramesh Kanar, Sushma Kanar, Bipin Mehta, Arpana Bipin Mehta | Siddhhitech Developers Pvt Ltd | 13/08/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Oct 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Oct 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed127
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Sept 23 Architect Certificate.pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 23 Architect Certificate.pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 23 Architect Certificate.pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhi Yog as on June 2024.pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhi Yog as on June 2024.pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Siddhi Yog as on June 2024.pdf | 8 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Siddhi Yog as on June 2024.pdf | 8 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Siddhi Yog as on June 2024.pdf | 8 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Siddhi Yog as on June 2024.pdf | 8 Jan 2026 |
| Layout approvalFile: Plan.pdf | 11 Oct 2025 |
| Building plan approvalFile: Plan.pdf | 11 Oct 2025 |
| Layout approvalFile: Plan.pdf | 6 Aug 2025 |
| Building plan approvalFile: Plan.pdf | 6 Aug 2025 |
| Layout approvalFile: Plan.pdf | 6 Aug 2025 |
| Building plan approvalFile: Plan.pdf | 6 Aug 2025 |
| Form 1File: Form 1 Architect Certificate.pdf | 30 Jun 2025 |
| Form 2File: Form 2 - March 2025.pdf | 30 Jun 2025 |
| Form 3File: Form 3- March 2025.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 Sold Inventory.pdf | 30 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3-Siddhi Yog as on March 2025.pdf | 20 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Siddhi Yog as on March 2025.pdf | 20 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Siddhi Yog as on 09-12-2024 (1).pdf | 13 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Siddhi Yog as on 09-12-2024 (1).pdf | 13 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 - Siddhi Yog as on December 2024 (1).pdf | 13 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Siddhi Yog as on December 2024 (1).pdf | 13 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29 (1) (1).pdf | 13 Jan 2025 |
| Declaration about Commencement CertificateFile: Format D Declaration About Cmmencement Certificate.pdf | 13 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) (17) (1).pdf | 13 Jan 2025 |
| Certificates of CA (Form 3)File: CA (Form 3) Sept 24.pdf | 30 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 24.pdf | 26 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Siddhi Yog - FY 2023-24.pdf | 24 Dec 2024 |
| Declaration in FORM BFile: Form B.pdf | 9 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 9 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account Details.pdf | 9 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 9 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 9 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 11 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3-Siddhi Yog - September 2024.pdf | 20 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Siddhi Yog as on Sept 2024.pdf | 20 Oct 2024 |
| Building plan approvalFile: CFO Drawing.pdf | 14 Oct 2024 |
| Building Plan Approval (IOD)File: CFO Drawing.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 11 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Siddhi Yog as on June 2024.pdf | 17 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 - Siddhi Yog as on June 2024.pdf | 17 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Siddhi Yog as on March 2024.pdf | 28 May 2024 |
| Certificates of CA (Form 3)File: Form 3 - Siddhi Yog as on March 2024.pdf | 28 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Siddhi Yog.pdf | 8 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Siddhi Yog as on Dec 2023.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 - Siddhi Yog as on Dec 2023.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20 kamlesh gurav.pdf | 6 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22 kamlesh gurav.pdf | 6 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23 kamlesh gurav.pdf | 6 Dec 2023 |
| Declaration in FORM BFile: FORM -B Affidavit cum Declaration.pdf | 5 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 23 Architect Certificate.pdf | 5 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 23.pdf | 5 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21 Kaklesh Gurav.pdf | 5 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf | 5 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Vidya S Bhure.pdf | 5 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19 (1).pdf | 5 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20 (1).pdf | 5 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21 (1).pdf | 5 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22 (1).pdf | 5 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23 (1).pdf | 5 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Siddhi Yog as on September 2023.pdf | 18 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Siddhi Yog Sept 23 - Form 2.pdf | 23 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3-Siddhi Yog - 30-09-2023.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Siddhi Yog as on 2022-23.pdf | 22 Sep 2023 |
| Proforma of Agreement for saleFile: Sale Draft Agreement Mahim.pdf | 23 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Siddhi Yog as on June 2023.pdf | 17 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3- Siddhi Yog as on June 2023.pdf | 17 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Siddhi Yog -Mar 23.pdf | 24 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3-Siddhi Yog -Mar 23.pdf | 24 Apr 2023 |
| Building plan approvalFile: Approval Letter.pdf | 5 Apr 2023 |
| Building plan approvalFile: New Drawing 20-03-2023_compressed.pdf | 5 Apr 2023 |
| Building Plan Approval (IOD)File: Approval Letter.pdf | 5 Apr 2023 |
| Building Plan Approval (IOD)File: New Drawing 20-03-2023_compressed.pdf | 5 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MahaRERA - 01 03 2023.pdf | 3 Apr 2023 |
| Layout approvalFile: New Drawing 20-03-2023_11zon.pdf | 29 Mar 2023 |
| Building plan approvalFile: New Amended Certificate 20-03-2023.pdf | 29 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: New Drawing 20-03-2023_11zon.pdf | 29 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 127 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SIDDHI YOG on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAHIM
Filed coordinates, straight-line distance. 57 registered projects within 2 km.
Island Cove
LH Residential Housing Private Limited
Midtown Bay
Rising Sun Impex Private Limited
Island Cove Tower 4
LH Residential Housing Private Limited, Sh
Bayline Residences
HRUB Infra Projects Pvt Ltd
VITALIS
SURAJ ESTATE DEVELOPERS LTD
Suraj One Business Bay
ICONIC PROPERTY DEVELOPERS PVT LTD
Builder: SIDDHITECH DEVELOPERS PRIVATE LIMITED
SIDDHITECH DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including SIDDHI YOG. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What does it mean that SIDDHI YOG shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SIDDHI YOG is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHI YOG?
The registered promoter entity is SIDDHITECH DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHI YOG?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SIDDHI YOG?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SIDDHI YOG?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHI YOG?
The professionals named in the filing: Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHI YOG?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback