Home / Browse projects / Mumbai Suburban, Maharashtra / SHUBH REGENCY

Completed No litigation declared Residential / Group Housing project

SHUBH REGENCY

By SHUBH ENTERPRISE

RG-MH-09833 · RERA P51800003145 · Last updated on MahaRERA portal: 29 Mar 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 32 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Feb 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

SHUBH REGENCY is a Residential / Group Housing project by SHUBH ENTERPRISE in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003145 on 4 Aug 2017. The registration is recorded completed; possession was promised by 27 Feb 2025. The completion date has moved by 32 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSHUBH REGENCY
  • TypeResidential / Group Housing
  • Location
    • KASTURBA ROAD
    • MULUND
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003145
  • ReraGenie IDRG-MH-09833

Builder

  • NameSHUBH ENTERPRISE
  • Entity typePartnership
  • PartnersRASIK JADAVJI RAMANI, SHAILESH JADAVJI RAMANI, MEHUL RASIK RAMANI

Key dates

this monthRegisteredAug 2017First promiseJun 2022Revised toFeb 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion27 Feb 2025
  • Revised completionRevised to 27 Feb 2025 (originally 30 Jun 2022)
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shubh RegencyNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Shubh Regency: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area808 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2380.32
Proposed, not sanctioned1,701 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMULUND

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDilip W Deshmukh
ArchitectRamjibhai Asundaria
EngineerRajan C Tipnis
EngineerShri Prakash Singh
Chartered AccountantM N Kholiya & Associates
Chartered AccountantVidya Shetty & Company
PartnerRole in project
SHUBH ENTERPRISE-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800016942Jun 2022 → Jun 2024

Reason as filed by the promoterDue to certain road width issues and permissions construction could not be completed. Will complete the project within revised timeline.

EXT51800012164Jun 2022 → Jun 2023

Reason as filed by the promoterDue to Road Length Issue and an encroachment on the part of Road we are not able to get clarity for FSI from department - Ours plot being corner one we are covered by 2 lanes one is a 9.00 Meters wide road and other being 12.20 Meters wide Road. Consent from more than 51% of allottee's is obtained as per circular no 07/2019 date 08th Feb 2019.

EXT51800024269Jun 2022 → Feb 2025

Reason as filed by the promoterBuilding is 100% Ready, OC is already Received & Uploaded. We had Applied for Extension as we have to upload documents on Rera and Update Project on New Portal Due to Pendancy of Case. Kindly Grant us an extension where we had already handed over the possession to All our Allottees..

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12502435BHADRESH KISHORCHANDRA DOSHISHUBH ENTERPRISE17/07/2025
CC12504320PRATIK RAJESH SAVLASHUBH ENTERPRISE06/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Mar 2025

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2456968_OC_signed.pdf29 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 2022-23.pdf5 Nov 2024
Certificates of CA (Form 3)File: CA Certificate 2022-23.pdf5 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 2022-23.pdf5 Nov 2024
Declaration in FORM BFile: Declaration Form B 280625.pdf5 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Inventory 280624.pdf5 Jul 2024
Declaration in FORM BFile: Declaration Form B - Builder.pdf8 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf8 Jul 2023
Disclosure of sold/ booked inventoryFile: Declaration of sold unsold inventory.pdf8 Jul 2023
Proforma of Allotment letterFile: Deviation Report with respect to allotment letter.pdf28 Jun 2023
Proforma of Allotment letterFile: Model Form of Allotment letter.pdf28 Jun 2023
Proforma of Agreement for saleFile: AFS shubh.pdf28 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to allotment letter.pdf28 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to agreement for sale.pdf28 Jun 2023
Details of encumbrances concerned to FinanceFile: Non Encumbrance Certificate Concerened to Legal.pdf19 Jun 2023
Details of encumbrances concerned to FinanceFile: Non Encumbrance Certificate Concerened to Finance.pdf19 Jun 2023
Details of encumbrances concerned to LegalFile: Non Encumbrance Certificate Concerened to Legal.pdf19 Jun 2023
Details of encumbrances concerned to LegalFile: Non Encumbrance Certificate Concerened to Finance.pdf19 Jun 2023
CERSAI detailsFile: CERSAI.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisation - Mehul Ramani.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisation - Rasik Ramani.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisation - Shailesh Ramani.pdf19 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank Account for Real Estate Proj.pdf19 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 shubh 21-22.pdf23 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 21-22.pdf13 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engn Certificate 21-22.pdf13 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf13 Feb 2023
Certificates of CA (Form 3)File: Architect certificate 21-22.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory List 010722.pdf2 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20.pdf2 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21.pdf2 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 31032020 Final.pdf1 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 31032021.pdf1 Jul 2022
Details of encumbrancesFile: No encumbrances for Shubh Regency.pdf26 Jun 2022
CERSAI detailsFile: CERSAI- Shubh Regency.pdf26 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 19-20.pdf14 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 20-21.pdf14 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engn Certificate 19-20.pdf14 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engn Certificate 20-21.pdf14 Jun 2022
Certificates of CA (Form 3)File: CA_certificate_Form3_31032020.pdf10 Jun 2022
Certificates of CA (Form 3)File: CA_certificate_Form3_31032021.pdf10 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 CA Certificate Shubh 18-19.pdf27 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_Certificate_31032019.pdf25 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Certificate_31032019.pdf25 Nov 2021
Disclosure of sold/ booked inventoryFile: Disclosure_of_Sold-Booked_Inventory_31032019.pdf25 Nov 2021
Certificates of CA (Form 3)File: CA_certificate_Form3_31032019.pdf25 Nov 2021
Declaration about Commencement CertificateFile: Declaration.pdf14 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: CC Validity 14 may 2021.pdf13 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: CC validity 14 may 2022.pdf13 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 CA certificate 17-18.pdf29 Sep 2021
Proforma of Allotment letterFile: Agreement for sale .pdf11 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - ARCHITECT (RERA).pdf9 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ENGINEER (RERA).pdf9 Feb 2021
Certificates of CA (Form 3)File: Form 3 - CA (RERA).pdf9 Feb 2021
Layout approvalFile: Page 1.pdf30 Dec 2019
Layout approvalFile: Page 2.pdf30 Dec 2019
Copy of Layout Approval (in case of layout)File: Page 1.pdf30 Dec 2019
Copy of Layout Approval (in case of layout)File: Page 2.pdf30 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf30 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencementcertificate.pdf24 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: FirstCC.pdf1 Sep 2018
Layout approvalFile: Copy of plan approved compressed_Page_1.pdf31 Jul 2017
Layout approvalFile: Copy of plan approved compressed_Page_2.pdf31 Jul 2017
Layout approvalFile: Copy of plan approved compressed_Page_3.pdf31 Jul 2017
Layout approvalFile: Copy of plan approved compressed_Page_4.pdf31 Jul 2017
Layout approvalFile: Copy of plan approved compressed_Page_5.pdf31 Jul 2017
Details of encumbrancesFile: Details of encumbrances.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy of plan approved compressed_Page_1.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy of plan approved compressed_Page_2.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy of plan approved compressed_Page_3.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy of plan approved compressed_Page_4.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy of plan approved compressed_Page_5.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf31 Jul 2017
Certificates of CA (Form 3)File: CERTIFICATE of CA FORM 3.pdf31 Jul 2017
Building plan approvalFile: Building Plan approval IOD.pdf30 Jul 2017
PAN CardFile: PAN card.pdf30 Jul 2017
Copy of the legal title reportFile: Copy of Legal Title.pdf30 Jul 2017
Building Plan Approval (IOD)File: Building Plan approval IOD.pdf30 Jul 2017
Declaration in FORM BFile: Declaration of Promoter (Form B ).pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect ( Form 1 )-ilovepdf-compressed.pdf30 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 32 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHUBH REGENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND6,700+ in Mumbai Suburban

2 kmSHUBH REGENCYCompleted 125Lapsed / revoked 100Other 161Dot size: filed unitsN

Filed coordinates, straight-line distance. 386 registered projects within 2 km.

Builder: SHUBH ENTERPRISE

SHUBH ENTERPRISE has 1 registration on MahaRERA, including SHUBH REGENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHUBH REGENCY is delayed beyond 27 Feb 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHUBH REGENCY?

The registered promoter entity is SHUBH ENTERPRISE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHUBH REGENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHUBH REGENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHUBH REGENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHUBH REGENCY?

The professionals named in the filing: Architect: Dilip W Deshmukh; Architect: Ramjibhai Asundaria; Engineer: Rajan C Tipnis; Engineer: Shri Prakash Singh; Chartered Accountant: M N Kholiya & Associates; Chartered Accountant: Vidya Shetty & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUBH REGENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUBH REGENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUBH REGENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.