Shubh Parshwa
By S. Siddharth Construction Co. (Panchshil)
RG-MH-30067 · RERA P51800029898 · Last updated on MahaRERA portal: 3 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 42 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shubh Parshwa is a Residential / Group Housing project by S. Siddharth Construction Co. (Panchshil) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029898 on 15 Jul 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 42 months from the original filing. 39 of the 111 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameShubh Parshwa
- TypeResidential / Group Housing
- Location
- J N Road
- Mulund West
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- RERA no.P51800029898
- ReraGenie IDRG-MH-30067
Builder
- NameS. Siddharth Construction Co. (Panchshil)
- Entity typePartnership
- GSTIN27ACVFS3671E1ZM
- PartnerPiyush Harish Gosar
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jul 2021
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2023)
- Buildings1 building record
- Documents filed226 files
Current status
Figures as on 3 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shubh Parshwa | NA | 25 | 22 | 90 | 21 | 111 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 76%.
Shubh Parshwa: 59% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 51% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 76% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed36
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Mulund Gavanipada Panchshil Co-op Housing Society | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Shubh Parshwa | NA | Rs 24.15 cr | Rs 18.11 cr |
| - | NA | Rs 3.26 cr | Rs 8.15 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ACE Consultants |
| Engineer | Shrikrishna D Thokal |
| Engineer | Advance Creative Design Consultancy |
| Chartered Accountant | Himmat Shethia & Associates |
| Chartered Accountant | Malay Furia |
| Partner | Role in project |
|---|---|
| S. Siddharth Construction Co. (Panchshil) | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterLast RCC slab work of the building is at the stage of completion and internal finishing work of the building is in progress. In light of the above we seek extension for the period of one year i.e. till 30-12-2024. Self Declaration dated 25th December, 2023 for extension of due date for the project “Shubh Parshwa" is attached. Declaration in Form B is updated in document upload section and also booked units, Task and activity and parking details updated in the respective tabs.
Reason as filed by the promoterDeclaration letter for detailed reasons / clarification about the delay of project and the reason why extension is required including the schedule of balance work completion within proposed extended period is attached. Further notarised affidavit cum declaration in Form B mentioning the proposed extension date of project completion is duly uploaded. Recent sold/booked inventory details is duly uploaded. All the details of booked units, task and Activity is duly updated in the respective fields. Further Form 2 till 30-09-2024, Form 2A and Form 5 till FY 2023-2024 is duly uploaded. In light of t
Reason as filed by the promoterRCC Work of the project is completed in full. Finishing work is in progress. Application for Extension of Project Completion in Format B is enclosed. A Declaration in Form B on Rs. 500/- Stamp Paper duly notarised is enclosed. Calculation of sold units in compliance with section 14(2)(ii) is enclosed. Recent Disclosure of Sold / Booked Inventories is enclosed. Recent Form 3 for the latest Quarter ended 31-Mar-2026 is enclosed. In respect of completion of the pending work we request you to kindly grant extension of the project completion date up-to 30-June-2027.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed226
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 226 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Scan_Form 1 Panchshil 31 March 2026.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 _31-03-2026_Shubh Parshwa.pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Shubh Parshwa_Form 3 - CA Certificate_31-03-2026_compressed.pdf | 3 Jun 2026 |
| Form 1File: 30-09-2021 Form 1 Shubh Parshwa.pdf | 28 May 2026 |
| Form 2File: 30-09-2021 Shubh Parshwa Form 2.pdf | 28 May 2026 |
| Form 3File: 30-09-2021 Panchshil Form 3.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: S Siddharth Construction Co (Panchshil) Disclosure Of Sold Booked Inventory.PDF | 28 May 2026 |
| Form 1File: Form-1_31-12-2021_Shubh Parshwa.PDF | 28 May 2026 |
| Form 2File: Form 2 31-12-2021 Shubh Parshwa.PDF | 28 May 2026 |
| Form 3File: Form- 3 Panchshil 31-12-2021.PDF | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-12-2021_compressed.pdf | 28 May 2026 |
| Form 1File: Form-1_31-03-2022_Shubh Parshwa.PDF | 28 May 2026 |
| Form 2File: Form 2 31-03-2022 Shubh Parshwa.PDF | 28 May 2026 |
| Form 3File: Form-3 31-03-2022_Shubh Parshwa.PDF | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-03-2022_compressed.pdf | 28 May 2026 |
| Form 1File: Form-1_30-06-2022_Shubh Parshwa.PDF | 28 May 2026 |
| Form 2File: Form 2 30-06-2022 Shubh Parshwa.PDF | 28 May 2026 |
| Form 3File: Form-3 30-06-2022_Shubh Parshwa.PDF | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_30-06-2022.pdf | 28 May 2026 |
| Form 1File: Form-1_30-09-2022_Shubh Parshwa.PDF | 28 May 2026 |
| Form 2File: Form 2 30-09-2022 Shubh Parshwa.PDF | 28 May 2026 |
| Form 3File: Form-3 30-09-2022_Shubh Parshwa.PDF | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_30-09-2022.pdf | 28 May 2026 |
| Form 1File: Form-1_31-12-2022_Shubh Parshwa.PDF | 28 May 2026 |
| Form 2File: Form 2 Shubh Parshwa 31-12-2022.PDF | 28 May 2026 |
| Form 3File: Form-3 31-12-2022_Shubh Parshwa.PDF | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan S Siddharath Construction Co (Panchshil) 31-12-2022.PDF | 28 May 2026 |
| Form 1File: Form 1_31-03-2023_Shubh Parshwa.PDF | 28 May 2026 |
| Form 2File: Form 2_31-03-2023_Shubh Parshwa.pdf | 28 May 2026 |
| Form 3File: Form 3_31_03_2023_Shubh Parshwa.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: S Siddharath Construction Co 31-03-2023_Shubh Parshwa.PDF | 28 May 2026 |
| Form 1File: Form 1_30-06-2023_Shubh Parshwa.PDF | 28 May 2026 |
| Form 2File: Form 2_30-06-2023_Shubh Parshwa.pdf | 28 May 2026 |
| Form 3File: Form 3_30_06_2023_Shubh Parshwa.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: S Siddharath Construction Co 30-06-2023_Shubh Parshwa.PDF | 28 May 2026 |
| Form 1File: Form 1_30-09-2023_Shubh Parshwa.PDF | 28 May 2026 |
| Form 2File: Form 2_30-09-2023_Shubh Parshwa.pdf | 28 May 2026 |
| Form 3File: Panchshil_Form 3_30-09-23_Shubh Parshwa.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: S Siddharath Construction Co 30-09-2023_Shubh Parshwa.PDF | 28 May 2026 |
| Form 1File: Form 1_31-12-23_Shubh Parshwa.pdf | 28 May 2026 |
| Form 2File: Form 2_31-12-2023_Shubh Parshwa.pdf | 28 May 2026 |
| Form 3File: Panchshil_Form 3_31-12-2023_Shubh Parshwa.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-12-2023_Shubh Parshwa_compressed.pdf | 28 May 2026 |
| Form 1File: Form 1_31-03-24_Shubh Parshwa.pdf | 28 May 2026 |
| Form 2File: Form 2_31-03-2024_Shubh Parshwa.pdf | 28 May 2026 |
| Form 3File: Form 3 31-03-2024_Shubh Parshwa.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-03-2024_compressed.pdf | 28 May 2026 |
| Form 1File: Form 1_30-06-2024_Shubh Parshwa.pdf | 28 May 2026 |
| Form 2File: Form 2_30-06-2024_Shubh Parshwa.pdf | 28 May 2026 |
| Form 3File: Form 3_30-06-2024_Shubh Parshwa.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_30-06-2024_compressed.pdf | 28 May 2026 |
| Form 1File: Form 1_Shubh Parshwa_30-09-2024.pdf | 28 May 2026 |
| Form 2File: Form 2_Shubh Parshwa_30-09-2024.pdf | 28 May 2026 |
| Form 3File: Form 3_30-09-2024_Shubh Parshwa.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan S Siddharath Construction Co (Panchshil) 30-09-2024_compressed.pdf | 28 May 2026 |
| Form 1File: Form 1_31-12-24_Shubh Parshwa.pdf | 28 May 2026 |
| Form 2File: Form 2_31-12-24_Panchshil.pdf | 28 May 2026 |
| Form 3File: Form 3_31-12-24_Shubh Parshwa.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-12-2024_compressed.pdf | 28 May 2026 |
| Form 1File: Form 1_31-03-25_Shubh Parshwa.pdf | 28 May 2026 |
| Form 2File: Form 2_31-03-25_Shubh Parshwa.pdf | 28 May 2026 |
| Form 3File: Scan_Form 3_31-03-25_Shubh Parshwa.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-03-2025_compressed.pdf | 28 May 2026 |
| Form 5 (FY 2021-2022)File: Scan_Form 5 - Panchshil FY 2021-2022.PDF | 28 May 2026 |
| Form 5 (FY 2022-2023)File: Scan_Form 5 - Panchshil FY 2022-2023.PDF | 28 May 2026 |
| Form 5 (FY 2023-2024)File: Scan_Form 5_Panchshil.pdf | 28 May 2026 |
| Form 5 (FY 2024-2025)File: Scan_Form 5 - Panchshil FY 2024-2025.pdf | 28 May 2026 |
| Withdrawal Update Form 1File: Scan_RERA_Certifcate-Pancshil_September_2025.pdf | 25 May 2026 |
| Withdrawal Update Form 1File: Scan_Form 1 Panchshil 31 December 2025.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: Scan_Form 2_30-09-25_Panchshil.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: Scan Form -2_31-12-2025_Panchshil.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: Form 3_30-09-25_Panchshil_compressed.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: Panchshil_Form 3_31-12-2025_compressed.pdf | 25 May 2026 |
| Withdrawal Update Form 1File: Form 1_31-03-25_Panchshil.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: Scan_Final_Form_1_Panchshil_30_June_2025.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: Form 2_31-03-25_Panchshil.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: Form 2_30-06-2025_Shubh Parshwa.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Scan_Form 3_31-03-25_compressed.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Form 3_30-06-2025_Shubh Parshwa_compressed.pdf | 23 May 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_31-12-24_Panchshil.pdf | 6 May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 226 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shubh Parshwa on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mulund West6,700+ in Mumbai Suburban
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: S. Siddharth Construction Co. (Panchshil)
S. Siddharth Construction Co. (Panchshil) has 1 registration on MahaRERA, including Shubh Parshwa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Shubh Parshwa is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shubh Parshwa?
The registered promoter entity is S. Siddharth Construction Co. (Panchshil), a partnership as per the filing. Its GSTIN 27ACVFS3671E1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shubh Parshwa?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shubh Parshwa?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shubh Parshwa?
The professionals named in the filing: Architect: ACE Consultants; Engineer: Shrikrishna D Thokal; Engineer: Advance Creative Design Consultancy; Chartered Accountant: Himmat Shethia & Associates; Chartered Accountant: Malay Furia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shubh Parshwa?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback