Home / Browse projects / Mumbai Suburban, Maharashtra / Shubh Parshwa

Registered No litigation declared Residential / Group Housing project

Shubh Parshwa

By S. Siddharth Construction Co. (Panchshil)

RG-MH-30067 · RERA P51800029898 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 42 months from the original
4 of 11Construction stages donefurthest along: Staircases, 76%
72 of 111Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 226 documents Report an error

Shubh Parshwa is a Residential / Group Housing project by S. Siddharth Construction Co. (Panchshil) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029898 on 15 Jul 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 42 months from the original filing. 39 of the 111 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameShubh Parshwa
  • TypeResidential / Group Housing
  • Location
    • J N Road
    • Mulund West
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • RERA no.P51800029898
  • ReraGenie IDRG-MH-30067

Builder

  • NameS. Siddharth Construction Co. (Panchshil)
  • Entity typePartnership
  • GSTIN27ACVFS3671E1ZM
  • PartnerPiyush Harish Gosar

Key dates

this monthRegisteredJul 2021First promiseDec 2023Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jul 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed226 files

Current status

35%39 of 111 units booked
66.4%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shubh ParshwaNA25229021111

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 76%.

Shubh Parshwa: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises51%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks76%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area986 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2026
LandownerVillageDistrict
Mulund Gavanipada Panchshil Co-op Housing SocietyKurlaMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority (SRA)
Permissible FSI4864.07
Proposed, not sanctioned4,047 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMulund West, Mumbai 400 080
Estimated costRs 27.41 cr
Cost incurredRs 18.19 cr
Work done66.38%
BuildingWingEstimatedIncurred
Shubh ParshwaNARs 24.15 crRs 18.11 cr
-NARs 3.26 crRs 8.15 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectACE Consultants
EngineerShrikrishna D Thokal
EngineerAdvance Creative Design Consultancy
Chartered AccountantHimmat Shethia & Associates
Chartered AccountantMalay Furia
PartnerRole in project
S. Siddharth Construction Co. (Panchshil)-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018401Dec 2023 → Dec 2024

Reason as filed by the promoterLast RCC slab work of the building is at the stage of completion and internal finishing work of the building is in progress. In light of the above we seek extension for the period of one year i.e. till 30-12-2024. Self Declaration dated 25th December, 2023 for extension of due date for the project “Shubh Parshwa" is attached. Declaration in Form B is updated in document upload section and also booked units, Task and activity and parking details updated in the respective tabs.

EXT51800025587Dec 2023 → Jun 2026

Reason as filed by the promoterDeclaration letter for detailed reasons / clarification about the delay of project and the reason why extension is required including the schedule of balance work completion within proposed extended period is attached. Further notarised affidavit cum declaration in Form B mentioning the proposed extension date of project completion is duly uploaded. Recent sold/booked inventory details is duly uploaded. All the details of booked units, task and Activity is duly updated in the respective fields. Further Form 2 till 30-09-2024, Form 2A and Form 5 till FY 2023-2024 is duly uploaded. In light of t

EA03062621213Dec 2023 → Jun 2027

Reason as filed by the promoterRCC Work of the project is completed in full. Finishing work is in progress. Application for Extension of Project Completion in Format B is enclosed. A Declaration in Form B on Rs. 500/- Stamp Paper duly notarised is enclosed. Calculation of sold units in compliance with section 14(2)(ii) is enclosed. Recent Disclosure of Sold / Booked Inventories is enclosed. Recent Form 3 for the latest Quarter ended 31-Mar-2026 is enclosed. In respect of completion of the pending work we request you to kindly grant extension of the project completion date up-to 30-June-2027.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed226

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 226 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Scan_Form 1 Panchshil 31 March 2026.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2 _31-03-2026_Shubh Parshwa.pdf3 Jun 2026
Withdrawal Update Form 3File: Shubh Parshwa_Form 3 - CA Certificate_31-03-2026_compressed.pdf3 Jun 2026
Form 1File: 30-09-2021 Form 1 Shubh Parshwa.pdf28 May 2026
Form 2File: 30-09-2021 Shubh Parshwa Form 2.pdf28 May 2026
Form 3File: 30-09-2021 Panchshil Form 3.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: S Siddharth Construction Co (Panchshil) Disclosure Of Sold Booked Inventory.PDF28 May 2026
Form 1File: Form-1_31-12-2021_Shubh Parshwa.PDF28 May 2026
Form 2File: Form 2 31-12-2021 Shubh Parshwa.PDF28 May 2026
Form 3File: Form- 3 Panchshil 31-12-2021.PDF28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-12-2021_compressed.pdf28 May 2026
Form 1File: Form-1_31-03-2022_Shubh Parshwa.PDF28 May 2026
Form 2File: Form 2 31-03-2022 Shubh Parshwa.PDF28 May 2026
Form 3File: Form-3 31-03-2022_Shubh Parshwa.PDF28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-03-2022_compressed.pdf28 May 2026
Form 1File: Form-1_30-06-2022_Shubh Parshwa.PDF28 May 2026
Form 2File: Form 2 30-06-2022 Shubh Parshwa.PDF28 May 2026
Form 3File: Form-3 30-06-2022_Shubh Parshwa.PDF28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_30-06-2022.pdf28 May 2026
Form 1File: Form-1_30-09-2022_Shubh Parshwa.PDF28 May 2026
Form 2File: Form 2 30-09-2022 Shubh Parshwa.PDF28 May 2026
Form 3File: Form-3 30-09-2022_Shubh Parshwa.PDF28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_30-09-2022.pdf28 May 2026
Form 1File: Form-1_31-12-2022_Shubh Parshwa.PDF28 May 2026
Form 2File: Form 2 Shubh Parshwa 31-12-2022.PDF28 May 2026
Form 3File: Form-3 31-12-2022_Shubh Parshwa.PDF28 May 2026
Disclosure of Sold and Booked InventoryFile: Scan S Siddharath Construction Co (Panchshil) 31-12-2022.PDF28 May 2026
Form 1File: Form 1_31-03-2023_Shubh Parshwa.PDF28 May 2026
Form 2File: Form 2_31-03-2023_Shubh Parshwa.pdf28 May 2026
Form 3File: Form 3_31_03_2023_Shubh Parshwa.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: S Siddharath Construction Co 31-03-2023_Shubh Parshwa.PDF28 May 2026
Form 1File: Form 1_30-06-2023_Shubh Parshwa.PDF28 May 2026
Form 2File: Form 2_30-06-2023_Shubh Parshwa.pdf28 May 2026
Form 3File: Form 3_30_06_2023_Shubh Parshwa.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: S Siddharath Construction Co 30-06-2023_Shubh Parshwa.PDF28 May 2026
Form 1File: Form 1_30-09-2023_Shubh Parshwa.PDF28 May 2026
Form 2File: Form 2_30-09-2023_Shubh Parshwa.pdf28 May 2026
Form 3File: Panchshil_Form 3_30-09-23_Shubh Parshwa.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: S Siddharath Construction Co 30-09-2023_Shubh Parshwa.PDF28 May 2026
Form 1File: Form 1_31-12-23_Shubh Parshwa.pdf28 May 2026
Form 2File: Form 2_31-12-2023_Shubh Parshwa.pdf28 May 2026
Form 3File: Panchshil_Form 3_31-12-2023_Shubh Parshwa.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-12-2023_Shubh Parshwa_compressed.pdf28 May 2026
Form 1File: Form 1_31-03-24_Shubh Parshwa.pdf28 May 2026
Form 2File: Form 2_31-03-2024_Shubh Parshwa.pdf28 May 2026
Form 3File: Form 3 31-03-2024_Shubh Parshwa.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-03-2024_compressed.pdf28 May 2026
Form 1File: Form 1_30-06-2024_Shubh Parshwa.pdf28 May 2026
Form 2File: Form 2_30-06-2024_Shubh Parshwa.pdf28 May 2026
Form 3File: Form 3_30-06-2024_Shubh Parshwa.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_30-06-2024_compressed.pdf28 May 2026
Form 1File: Form 1_Shubh Parshwa_30-09-2024.pdf28 May 2026
Form 2File: Form 2_Shubh Parshwa_30-09-2024.pdf28 May 2026
Form 3File: Form 3_30-09-2024_Shubh Parshwa.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Scan S Siddharath Construction Co (Panchshil) 30-09-2024_compressed.pdf28 May 2026
Form 1File: Form 1_31-12-24_Shubh Parshwa.pdf28 May 2026
Form 2File: Form 2_31-12-24_Panchshil.pdf28 May 2026
Form 3File: Form 3_31-12-24_Shubh Parshwa.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-12-2024_compressed.pdf28 May 2026
Form 1File: Form 1_31-03-25_Shubh Parshwa.pdf28 May 2026
Form 2File: Form 2_31-03-25_Shubh Parshwa.pdf28 May 2026
Form 3File: Scan_Form 3_31-03-25_Shubh Parshwa.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventories_31-03-2025_compressed.pdf28 May 2026
Form 5 (FY 2021-2022)File: Scan_Form 5 - Panchshil FY 2021-2022.PDF28 May 2026
Form 5 (FY 2022-2023)File: Scan_Form 5 - Panchshil FY 2022-2023.PDF28 May 2026
Form 5 (FY 2023-2024)File: Scan_Form 5_Panchshil.pdf28 May 2026
Form 5 (FY 2024-2025)File: Scan_Form 5 - Panchshil FY 2024-2025.pdf28 May 2026
Withdrawal Update Form 1File: Scan_RERA_Certifcate-Pancshil_September_2025.pdf25 May 2026
Withdrawal Update Form 1File: Scan_Form 1 Panchshil 31 December 2025.pdf25 May 2026
Withdrawal Update Form 2File: Scan_Form 2_30-09-25_Panchshil.pdf25 May 2026
Withdrawal Update Form 2File: Scan Form -2_31-12-2025_Panchshil.pdf25 May 2026
Withdrawal Update Form 3File: Form 3_30-09-25_Panchshil_compressed.pdf25 May 2026
Withdrawal Update Form 3File: Panchshil_Form 3_31-12-2025_compressed.pdf25 May 2026
Withdrawal Update Form 1File: Form 1_31-03-25_Panchshil.pdf23 May 2026
Withdrawal Update Form 1File: Scan_Final_Form_1_Panchshil_30_June_2025.pdf23 May 2026
Withdrawal Update Form 2File: Form 2_31-03-25_Panchshil.pdf23 May 2026
Withdrawal Update Form 2File: Form 2_30-06-2025_Shubh Parshwa.pdf23 May 2026
Withdrawal Update Form 3File: Scan_Form 3_31-03-25_compressed.pdf23 May 2026
Withdrawal Update Form 3File: Form 3_30-06-2025_Shubh Parshwa_compressed.pdf23 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_31-12-24_Panchshil.pdf6 May 2025

How this compares with Mumbai Suburban

35%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 42 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shubh Parshwa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

Builder: S. Siddharth Construction Co. (Panchshil)

S. Siddharth Construction Co. (Panchshil) has 1 registration on MahaRERA, including Shubh Parshwa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shubh Parshwa is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shubh Parshwa?

The registered promoter entity is S. Siddharth Construction Co. (Panchshil), a partnership as per the filing. Its GSTIN 27ACVFS3671E1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shubh Parshwa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shubh Parshwa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shubh Parshwa?

The professionals named in the filing: Architect: ACE Consultants; Engineer: Shrikrishna D Thokal; Engineer: Advance Creative Design Consultancy; Chartered Accountant: Himmat Shethia & Associates; Chartered Accountant: Malay Furia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shubh Parshwa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shubh Parshwa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shubh Parshwa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.