Home / Browse projects / Aurangabad, Maharashtra / SHUBH GRAM PHASE-I HRIDEYA NAGAR
SHUBH GRAM PHASE-I HRIDEYA NAGAR
RG-MH-62123 · RERA P51500033100 · Last updated on MahaRERA portal: 18 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHUBH GRAM PHASE-I HRIDEYA NAGAR is a Residential / Group Housing project by SHUBHGRAM HOMES in Aurangabad, Maharashtra, registered with MahaRERA as P51500033100 on 9 Feb 2022. Possession was promised by 1 Jun 2025 and is now 16 months past that date. 7 of the 16 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.
At a glance
Project
- NameSHUBH GRAM PHASE-I HRIDEYA NAGAR
- TypeResidential / Group Housing
- Location
- Plot no. 01
- Gut no.194
- Ohargaon
- Aurangabad
- Ohar
- Aurangabad
- 431001
- Pincode431001
- RERA no.P51500033100
- ReraGenie IDRG-MH-62123
Builder
- NameSHUBHGRAM HOMES
- Entity typePartnership
- PartnersBalkrishna Dasrao Bhakre, Ajay Devanand Kotgire
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Feb 2022
- Promised completion1 Jun 2025
- Revised completionNone
- Buildings2 building records
- Documents filed64 files
Current status
Figures as on 18 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RH 01 TO 08 | NA | 4 | 4 | 8 | 0 | 8 |
| RH 35 TO 42 | NA | 4 | 4 | 8 | 0 | 8 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
RH 01 TO 0880%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RH 35 TO 4280%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| RH 01 TO 08 | 6 | 6 |
| RH 35 TO 42 | 2 | 2 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ketki Nilesh Shinde | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RH 01 TO 08 | NA | Rs 1.60 cr | Rs 1.65 cr |
| RH 35 TO 42 | NA | Rs 1.60 cr | Rs 1.65 cr |
| - | NA | Rs 91.00 lakh | Rs 93.86 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMIL ARCHITECHTS |
| Engineer | N.G. Karkhane |
| Chartered Accountant | YASH NAGAR |
| Partner | Role in project |
|---|---|
| SHUBHGRAM HOMES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 2025-26 Q2.pdf | 18 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 2025-26 Q2.pdf | 18 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 2025-26 Q2-Sign.pdf | 18 Nov 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf | 6 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf | 6 Nov 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 24-25 Sign-New.pdf | 6 Nov 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 23-24- Sign.pdf | 5 Nov 2025 |
| Form 1File: Form 1 2024-25 Q4.pdf | 19 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q1.pdf | 28 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q2.pdf | 28 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q3.pdf | 28 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q3_.pdf | 1 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q3.pdf | 1 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SGH - Form 1 - 2022-23 Q4.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SGH - Form 2 2022-23 Q3.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shubhgram architect certificate june 2024.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shubhgram architect certificate sep 2024.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shubhgram architect certificate dec 2024.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2024-25 Q1.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2024-25 Q2.pdf | 10 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 2024-25 Q1.pdf | 10 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 2024-25 Q2.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubhagram HOme Form 1.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Shubhagram Home Sold Unsold 2023-24 Q3.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubhgram Homes Form 1 22-23 Q4.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shubhgram Homes Form 3 23-24 Q4.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubhagram HOme Form 1.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubhgram Homes Form 1 22-23 Q4.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shubhgram Homes Form 3 23-24 Q4.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Shubhagram Home Sold Unsold 2023-24 Q3.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate .pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shubh-Gram Homes .pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf | 7 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 21-22.pdf | 7 Apr 2023 |
| Declaration about Commencement CertificateFile: Disclosure of Commencement Certificate .pdf | 1 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Quality Assurance Certificate .pdf | 1 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Booked Inventory .pdf | 1 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest In Other Real Estate Organizations - Ajay Kotgire Sir.pdf | 1 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate projects.pdf | 1 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrance concern to legal.pdf | 20 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrance concern to legal.pdf | 20 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declatation about spaprate bank account.pdf | 20 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report With Respect To Allotment Letter.pdf | 20 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report With Respect To Model Copy Of Agreement (1).pdf | 20 Mar 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf | 16 Jan 2023 |
| Copy of the legal title reportFile: Shubhgram RERA search report_compressed.pdf | 6 Jan 2022 |
| Building plan approvalFile: 1-1_Building permission drawings_PLOT NO 01-1_compressed.pdf | 5 Jan 2022 |
| Building plan approvalFile: 1-2_Building permission drawings_PLOT NO 01-2_compressed.pdf | 5 Jan 2022 |
| Building plan approvalFile: 1-3_Building permission drawings_PLOT NO 01-3_compressed.pdf | 5 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-1_Building permission drawings_PLOT NO 01-1_compressed.pdf | 5 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-2_Building permission drawings_PLOT NO 01-2_compressed.pdf | 5 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-3_Building permission drawings_PLOT NO 01-3_compressed.pdf | 5 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building permission_PLOT NO 01_compressed.pdf | 5 Jan 2022 |
| Declaration about Commencement CertificateFile: Declaration of commencement certificate.pdf | 5 Jan 2022 |
| Layout approvalFile: Final layout drawing_compressed (1).pdf | 4 Jan 2022 |
| PAN CardFile: 1 PAN Card.pdf | 4 Jan 2022 |
| Details of encumbrancesFile: 1 Details of encumbrances.pdf | 4 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: Final layout drawing_compressed (1).pdf | 4 Jan 2022 |
| Declaration in FORM BFile: 1 Declaration in FORM B.pdf | 4 Jan 2022 |
| CERSAI detailsFile: 1 CERSAI details.pdf | 4 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 4 Jan 2022 |
| Proforma of Allotment letterFile: 1 Proforma of the allotment letter and agreement for sale.pdf | 4 Jan 2022 |
| Proforma of Allotment letterFile: 2 Proforma of the allotment letter and agreement for sale.pdf | 4 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 64 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHUBH GRAM PHASE-I HRIDEYA NAGAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ohargaon, Aurangabad1,400+ in Aurangabad
Capital Trade Centre
KRK Landmark LLP
AQ TOWN
AQ INFRASTRUCTURE PRIVATE LIMITED
KALYANI SAI VISHWA
RAJASHREE UDYOG
AMRUT SAI PLAZA PH 2
Shree Amrut Sai Developer Pvt.Ltd
PRASSANA HIGH CLASS CITY PHASE - I
SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SA
SHRIRAM RESIDENCY
UNIQUE BUILDCON
See every Aurangabad project, with the district possession charts
Builder: SHUBHGRAM HOMES
SHUBHGRAM HOMES has 1 registration on MahaRERA, including SHUBH GRAM PHASE-I HRIDEYA NAGAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that SHUBH GRAM PHASE-I HRIDEYA NAGAR shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHUBH GRAM PHASE-I HRIDEYA NAGAR is delayed beyond 1 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHUBH GRAM PHASE-I HRIDEYA NAGAR?
The registered promoter entity is SHUBHGRAM HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHUBH GRAM PHASE-I HRIDEYA NAGAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHUBH GRAM PHASE-I HRIDEYA NAGAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHUBH GRAM PHASE-I HRIDEYA NAGAR?
The professionals named in the filing: Architect: SAMIL ARCHITECHTS; Engineer: N.G. Karkhane; Chartered Accountant: YASH NAGAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHUBH GRAM PHASE-I HRIDEYA NAGAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback