ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SHRISHTI

Completed No litigation declared Residential / Group Housing project

SHRISHTI

By Gera Developments Private Limited

RG-MH-16221 · RERA P52100026148 · Last updated on MahaRERA portal: 9 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 24 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

SHRISHTI is a Residential / Group Housing project by Gera Developments Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100026148 on 25 Aug 2020. The registration is recorded completed; possession was promised by 15 Sep 2025.

At a glance

Project

  • NameSHRISHTI
  • TypeResidential / Group Housing
  • Location
    • 24 mts RP road
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100026148
  • ReraGenie IDRG-MH-16221

Builder

  • NameGera Developments Private Limited
  • Entity typeCompany
  • CINU70102PN1988PTC049303
  • GSTIN27AAACG6703F1ZW
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorRohit Gera
  • ChairpersonKumar Gera
  • Other registrations24 more →
  • Completed11 of 25
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

this monthRegisteredAug 2020PromisedSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2020
  • Promised completion15 Sep 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ShrishtiNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Shrishti: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,168 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15775.56
Proposed, not sanctioned15,776 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKoregaon Park

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGridlines Design LLP
EngineerSantosh Tiwatne
Chartered AccountantK Ray & Co
PartnerRole in project
Gera Developments Private Limited-

Litigation declared3

CaseCourtStatus
1504/2018CivilClosed
1848/2019CivilOngoing
154/2020DistrictClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Sep 2023

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shrishti_compressed.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shrishti_compressed.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Notes_Shrishti.pdf11 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shrishti OC.pdf4 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shrishti OC Part One.pdf4 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf4 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SHRISHTI 2A -11-12.pdf19 Jun 2023
Disclosure of sold/ booked inventoryFile: Shrishti Disc Sold Booked Q4_compressed.pdf14 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Shrishti.pdf1 Feb 2023
Disclosure of sold/ booked inventoryFile: Shakti Disc Sold Q3 FY 2022 23.pdf16 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Stamp Asso of Allottes SHRISHTI.pdf21 Dec 2022
Proforma of Allotment letterFile: Shrishti-V1-Clean.pdf7 Nov 2022
Proforma of Allotment letterFile: SHRISHTI-V2-14-Oct-22-cLEAN.pdf7 Nov 2022
Proforma of Agreement for saleFile: agreement letter V1.pdf7 Nov 2022
Proforma of Agreement for saleFile: V2 Agreement for sale.pdf7 Nov 2022
Proforma of Agreement for saleFile: V2-Shrishti.pdf21 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4B-Arch-WOJ Srishti.pdf17 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5B-EngCerti Shristi.pdf17 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6B- CA cerf-Shrishti.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Shrishti_Form_5_Notes_Signed.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Inv-Shrishti_compressed.pdf11 Oct 2022
OtherFile: Shrishti_Form_5_Notes_Signed.pdf27 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_GPPL Shrishti.pdf12 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Notes to Form 5_GPPL Shrishti.pdf12 Jul 2022
Layout approvalFile: Layout_compressed.pdf8 Jul 2022
Building plan approvalFile: Shrishti Podium.pdf8 Jul 2022
Building plan approvalFile: Shrishti-8-12 floor.pdf8 Jul 2022
Building plan approvalFile: Shrishti-Basement.pdf8 Jul 2022
Building plan approvalFile: Shrishti-Elev.pdf8 Jul 2022
Building plan approvalFile: Shrishti-floor plan.pdf8 Jul 2022
Building plan approvalFile: Shrishti-Sec.pdf8 Jul 2022
Building plan approvalFile: Shrishti-Stilt.pdf8 Jul 2022
Building plan approvalFile: Shrishti-Terrace.pdf8 Jul 2022
Details of encumbrances concerned to LegalFile: Self Declaration-no encumbrance- WOJ.pdf8 Jul 2022
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Shrishti Podium.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Shrishti-8-12 floor.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Shrishti-Basement.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Shrishti-Elev.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Shrishti-floor plan.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Shrishti-Sec.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Shrishti-Stilt.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Shrishti-Terrace.pdf8 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf8 Jul 2022
Declaration about Commencement CertificateFile: CC Dec- Shrishti.pdf8 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch-WOJ Srishti.pdf8 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EngCertshrushti 15062022.pdf8 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate WOJ Shrishti 15062022_compressed.pdf8 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Q-Shristi_compressed.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inv-Shrishti_compressed.pdf7 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PROJECT SHRISTI.PDF7 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_WOJ_Gera Properties Private Limited.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Inv- Shrishti.pdf7 Apr 2022
CERSAI detailsFile: CERSAI Report (Asset Based) - WOJ.pdf4 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: WOJ SHRISTI_compressed.pdf17 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_WOJ_Gera Properties Private Limited.pdf11 Jan 2022
Declaration in FORM BFile: Shrishti Form B.pdf12 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate - EWS_compressed.pdf12 Nov 2021
OtherFile: CERSAI Report_GPPL WOJ_ARKA.pdf19 Aug 2021
Details of encumbrancesFile: Self Declaration-no encumbrance- WOJ_12-Aug-21.pdf18 Aug 2021
Declaration in FORM BFile: Form B- Shrishti.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Geras World of Joy SHRISHTI.pdf18 Aug 2021
OtherFile: PROJECT SHRISTI.PDF20 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHRISHTI 30112020_compressed.pdf5 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHRISHTI 30112020_compressed.pdf24 Feb 2021
OtherFile: Quality Cerf-Dec-20.pdf24 Feb 2021
Proforma of Allotment letterFile: LOI-SHRISHTI.pdf18 Aug 2020
OtherFile: Maharera Letter-Final.pdf18 Aug 2020
OtherFile: Index II.pdf18 Aug 2020
OtherFile: COI after change of name- GERA PROPERTIES PRIVATE LIMITED.pdf18 Aug 2020
Details of encumbrancesFile: Encumbrance Cerf.pdf14 Jul 2020
Declaration in FORM BFile: Form B.pdf14 Jul 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHRISHTI- CA Cerf.pdf14 Jul 2020
Layout approvalFile: 1- Layout Plan.pdf21 Mar 2020
Building plan approvalFile: 52-Inclusive Hsg-Parking.pdf21 Mar 2020
Building plan approvalFile: 53-Inclusive Hsg-Plan.pdf21 Mar 2020
Building plan approvalFile: 54-Inclusive Hsg-Refuge.pdf21 Mar 2020
Building plan approvalFile: 55-Inclusive Hsg-Terrace.pdf21 Mar 2020
Building plan approvalFile: 56- Inclusive Hsg-Section.pdf21 Mar 2020
PAN CardFile: PAN Card_GPPL.pdf21 Mar 2020

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Geras Imperium GreenChalta no 13 part of PT Sheet no 73Plot no AX neogi nagar Rua de Ourem road61CompletedApr 2019May 2016
Geras Greenville Song of Joy A1 and A2Survey no 64 Hissa no 1 to 6 Kharadi120CompletedApr 2017Oct 2016
Geras Greenville Trinity TowerSurvey no 64 Hissa no 1 to 6248CompletedNov 2015Oct 2015
Regent TowerSurvey No 33 Hissa No 2 2 Village Baner9CompletedNov 2014Sep 2014
Geras Park View ISurvey no 73 Hissa No 1227CompletedApr 2014Late, Mar 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRISHTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

Builder: Gera Developments Private Limited

Gera Developments Private Limited has 25 registrations on MahaRERA, including A3, Song of Joy, Geras Greensville2 and Geras Misty Waters. Its filings disclose 10 earlier MahaRERA projects: declares 8 of 10 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHRISHTI is delayed beyond 15 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRISHTI?

The registered promoter entity is Gera Developments Private Limited, a company as per the filing. Its CIN U70102PN1988PTC049303 and GSTIN 27AAACG6703F1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRISHTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRISHTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRISHTI?

The professionals named in the filing: Architect: Gridlines Design LLP; Engineer: Santosh Tiwatne; Chartered Accountant: K Ray & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRISHTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRISHTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRISHTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.