Home / Browse projects / Aurangabad, Maharashtra / SHRINIVAS PARK

Completed No litigation declared Others project

SHRINIVAS PARK

By SHRINIVAS BUILDCON

RG-MH-08821 · RERA P51500022271 · Last updated on MahaRERA portal: 11 Oct 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

SHRINIVAS PARK is a Others project by SHRINIVAS BUILDCON in Aurangabad, Maharashtra, registered with MahaRERA as P51500022271 on 9 Sep 2019. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameSHRINIVAS PARK
  • TypeOthers
  • Location
    • NEAR AURANGABAD TO MUMBAI ROAD
    • CIDCO WALUJ MAHANAGAR 1
    • Tisgaon
    • Aurangabad
    • 431136
  • Pincode431136
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500022271
  • ReraGenie IDRG-MH-08821

Builder

  • NameSHRINIVAS BUILDCON
  • Entity typePartnership
  • PartnersANURADHA PRADEEP MOTARWAR, PRADEEP BALAJI MOTARWAR, PRAMOD KASTURCHAND MUTHA, SUWALAL GOPIRAM YADAV, SHARDUL SURESH DESHPANDE

Key dates

this monthRegisteredSep 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Sep 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA40000
B AND CNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B AND C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 11 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Others Compound Wall and Entrance GateYes100%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered35
Open Space21
BuildingClosed/CoveredOpen SpaceTotal
A14014
B AND C212142

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6300.0
Proposed, not sanctioned4,529 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW OSMANPURA COLONY AURANGABAD

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMIL ARCHITECTS
EngineerMILIND MADHUKARRAO WADEKAR
Chartered AccountantSHANTANU N AMBEKAR
Chartered AccountantVAIBHAV VIJAY DANDE
PartnerRole in project
SHRINIVAS BUILDCON-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500018431Dec 2023 → Dec 2024

Reason as filed by the promoterDue to technical issues getting delayed for full completion so need 12 months extension

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Apr 2024

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 22092024 Form No5 CA FY 202324 OK.pdf11 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: New Merged file.pdf19 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion.pdf6 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 15.pdf4 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 25.pdf4 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 35.pdf4 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 45.pdf4 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 55.pdf4 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 16022024 Completion Certificate.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A (2019-20).pdf21 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A (2020-21).pdf21 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A (2021-22).pdf21 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A (2022-23).pdf21 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SBNAC.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22 Signed.pdf17 Jan 2024
Declaration in FORM BFile: Form B.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold ( 10-01-2024 ).pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 13092023 Form No 5 CA FY 202223.pdf23 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20072023 Form 1 Architect Certificate Upto April To June 2023.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20072023 Form 2 Engineer Certificate Upto April To June 2023.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03042022 Form 1 Architect Certificate Upto 31 March2022.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03042023 Form 1 Architect Certificate Upto 31 March2023.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03042022 Form 2 Engineer Certificate As on 31 March2022.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03042023 Form 2 Engineer Certificate As on 31 March2023.pdf18 Jul 2023
Copy of the legal title reportFile: 04042023 Title Search Report.pdf15 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10082021 Form 1 Architect Certificate Up To March 2021.pdf1 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10082021 Form 2 Engineer Certificate Up To March 2021.pdf1 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2022_compressed.pdf7 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf7 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: shrinivas form 5 (21-22).pdf7 Jan 2023
Disclosure of sold/ booked inventoryFile: Shrinivas Park Sold And Unsold details_compressed.pdf16 Dec 2022
Layout approvalFile: 1 LAYOUT PLAN.pdf25 Nov 2022
Layout approvalFile: 1 LAYOUT PLAN.pdf25 Nov 2022
Building plan approvalFile: 2 BC BLDG GROUND AND FIRST FLOOR PLAN.pdf25 Nov 2022
Building plan approvalFile: 3 BC BLDG SECOND, THIRD TO FIFTH FLOOR PLAN.pdf25 Nov 2022
Building plan approvalFile: 4 BC BLDG SIX FLOOR PLAN.pdf25 Nov 2022
Building plan approvalFile: 5 BC BLDG SECTION PLAN.pdf25 Nov 2022
Copy of Layout Approval (in case of layout)File: 1 LAYOUT PLAN.pdf25 Nov 2022
Copy of Layout Approval (in case of layout)File: 1 LAYOUT PLAN.pdf25 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: 2 BC BLDG GROUND AND FIRST FLOOR PLAN.pdf25 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: 3 BC BLDG SECOND, THIRD TO FIFTH FLOOR PLAN.pdf25 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: 4 BC BLDG SIX FLOOR PLAN.pdf25 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: 5 BC BLDG SECTION PLAN.pdf25 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: 31102022 Commecement Certificate.pdf25 Nov 2022
Proforma of Allotment letterFile: 25072022 BLANK ATS DRAFT with R P.pdf25 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 06122021 Completion Certificate.pdf20 Dec 2021
Architect’s Certificate on Completion of Project (Form 4)File: 16122021 Form No 4 A Bulding Completion.pdf20 Dec 2021
Layout approvalFile: 1 Layout.pdf23 Oct 2021
Building plan approvalFile: 2 A Bldg.pdf23 Oct 2021
Building plan approvalFile: 3 A Bldg Typical Floor Plan.pdf23 Oct 2021
Building plan approvalFile: 4 BC Bldg Typical Floor Plan.pdf23 Oct 2021
Building plan approvalFile: 5 BC Bldg Terrace Floor Plan.pdf23 Oct 2021
Building plan approvalFile: 6 BC Bldg Section Dwg.pdf23 Oct 2021
Copy of Layout Approval (in case of layout)File: 1 Layout.pdf23 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 2 A Bldg.pdf23 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 3 A Bldg Typical Floor Plan.pdf23 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 4 BC Bldg Typical Floor Plan.pdf23 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 5 BC Bldg Terrace Floor Plan.pdf23 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 6 BC Bldg Section Dwg.pdf23 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Developement Order.pdf23 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Up To March 2020.pdf20 Feb 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Up To March 2020.pdf20 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form No 5 CA.pdf20 Feb 2021
Details of encumbrancesFile: Encumbrance.pdf30 Jan 2021
Copy of the legal title reportFile: Title Search Report.pdf11 Jan 2020
Layout approvalFile: Layout Plan.pdf3 Sep 2019
Building plan approvalFile: A Type Bldg.pdf3 Sep 2019
Building plan approvalFile: A Type Building.pdf3 Sep 2019
Building plan approvalFile: B1 B2 Type Building.pdf3 Sep 2019
PAN CardFile: Pan Card.pdf3 Sep 2019
Copy of the legal title reportFile: Title Search Report.pdf3 Sep 2019
Details of encumbrancesFile: No Encumbrance.pdf3 Sep 2019
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: A Type Bldg.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: A Type Building.pdf3 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: B1 B2 Type Building.pdf3 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Sep 2019

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SHRINIVAS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CIDCO WALUJ MAHANAGAR 11,400+ in Aurangabad

2 kmSHRINIVAS PARKCompleted 25Lapsed / revoked 10Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: SHRINIVAS BUILDCON

SHRINIVAS BUILDCON has 1 registration on MahaRERA, including SHRINIVAS PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SHRINIVAS PARK is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRINIVAS PARK?

The registered promoter entity is SHRINIVAS BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRINIVAS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRINIVAS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRINIVAS PARK?

The professionals named in the filing: Architect: SAMIL ARCHITECTS; Engineer: MILIND MADHUKARRAO WADEKAR; Chartered Accountant: SHANTANU N AMBEKAR; Chartered Accountant: VAIBHAV VIJAY DANDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRINIVAS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRINIVAS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRINIVAS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.