ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / SHRI SIDHESHWAR COMPLEX

Completed No litigation declared Residential / Group Housing project

SHRI SIDHESHWAR COMPLEX

By RADHEY ENTERPRISES

RG-MH-24395 · RERA P52900012882 · Last updated on MahaRERA portal: 14 Dec 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 97 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedregistration recorded completed
18 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 30%
0Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

SHRI SIDHESHWAR COMPLEX is a Residential / Group Housing project by RADHEY ENTERPRISES in Sindhudurg, Maharashtra, registered with MahaRERA as P52900012882 on 7 Sep 2017. The registration is recorded completed; possession was promised by 30 Nov 2026. The completion date has moved by 97 months from the original filing.

At a glance

Project

  • NameSHRI SIDHESHWAR COMPLEX
  • TypeResidential / Group Housing
  • Location
    • Kolgaon
    • Sawantwadi
    • Sindhudurg
    • 416510
  • Pincode416510
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900012882
  • ReraGenie IDRG-MH-24395

Builder

  • NameRADHEY ENTERPRISES
  • Entity typePartnership
  • PartnersVIJAYA VIVEK PATIL, PRIYA NITESH PATIL, EKTA VINAY PATIL
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2017First promiseOct 2018Revised toNov 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Sep 2017
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 12 Oct 2018)
  • Buildings3 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A SINDHUDURGNA30000
BUILDING B VIJAYDURGNA30000
BUILDING C SUVARNADURGNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 30%.

BUILDING A SINDHUDURG36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B VIJAYDURG39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C SUVARNADURG91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,370 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SANJAY SHANTARAM SHETKARTalvadeSindhudurg
RAJESH PRABHAKAR RAUTVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI1283.46
Proposed, not sanctioned1,283 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASAI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJ M FAROZ
EngineerJ M FAROZ AND ASSOCIATES
PartnerRole in project
RADHEY ENTERPRISES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900008435Oct 2018 → Nov 2023

Reason as filed by the promoterBelow are reasons for Delay 1. We had received the First extension granted from 12/10/2018 to 11/10/2019. But during the said period, sand was not available for construction till and during the whole year of 2020. 2. This period of extension was followed by the COVID lockdown period, which compelled us to seek a further extension for the A and B wings of the Project and hence, we have applied again on 02/22/2020. 3. Now, as per the e mail received by you, the Condition given for extension is - "Consent of 50 % of the allottees". 4. But this stipulation does not apply here because - out of 21 f

EXT52900000636Oct 2018 → Oct 2019

Reason as filed by the promoterAs Per sheet Attached

EXT52900017965Oct 2018 → Nov 2026

Reason as filed by the promoterDear Sir, 1. We have applied on 02/22/2020 for the extension period for our Project “Shri Siddheshwar Complex” for the A and B wings of the Project, after paying the requisite fee of Rs.24,290/- that has been paid on 0003/11/2020. 2. We have completed the C Wing of our project and have received the Occupancy Certificate for the same from the Sub Divisional Officer of Sawantwadi on 29/01/2019 and this OC has been uploaded on the website of the RERA. 3. We had received the First extension granted from 12/10/2018 to 11/10/2019. But during the said period, sand was not available for construction t

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Feb 2021

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH A WING.pdf14 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AECH B WING.pdf14 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 1.pdf14 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 3.pdf14 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A 1920.pdf14 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: DocScanner 14-Dec-2023 12-03 pm.pdf14 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf14 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DocScanner 14-Dec-2023 12-08.pdf14 Dec 2023
Declaration about Commencement CertificateFile: Commencement Certificate_compressed.pdf9 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Doc_4344_compressed.pdf9 Dec 2023
CERSAI detailsFile: Order no 26 CERSAI.pdf9 Dec 2023
Disclosure of sold/ booked inventoryFile: Doc_7910_compressed.pdf9 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Doc_2187_compressed.pdf9 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2021-2022_11zon.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 2017-2018_11zon.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-2019_11zon.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-2020_11zon.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-2021_11zon.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-2022_11zon.pdf4 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Radhey C Wing.pdf4 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1.pdf9 Aug 2017
Certificates of CA (Form 3)File: CA Certificate.pdf9 Aug 2017
Proforma of Allotment letterFile: Agreement to sale 1.pdf9 Aug 2017
Proforma of Allotment letterFile: Agreement to Sale 2.pdf9 Aug 2017
Proforma of Allotment letterFile: Agreement to Sale 3.pdf9 Aug 2017
Copy of the legal title reportFile: Search Report Part 1.pdf8 Aug 2017
Copy of the legal title reportFile: Search Report Part 2.pdf8 Aug 2017
Declaration in FORM BFile: Form B.pdf8 Aug 2017
Proforma of Allotment letterFile: Letter Of Allotment.pdf8 Aug 2017
Layout approvalFile: PLAN.pdf31 Jul 2017
Building plan approvalFile: Building Plan.pdf31 Jul 2017
PAN CardFile: Pan Card Vivek Patil.pdf31 Jul 2017
PAN CardFile: Pan Card Vijaya Patil.pdf31 Jul 2017
PAN CardFile: Pan Card Radhey Enterprises.pdf31 Jul 2017
PAN CardFile: Pan Card Priya Patil.pdf31 Jul 2017
PAN CardFile: Pan Card Ekta Patil.pdf31 Jul 2017
Details of encumbrancesFile: Details of encumbrances.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: PLAN.pdf31 Jul 2017
Building Plan Approval (IOD)File: Building Plan.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf31 Jul 2017
Certificates of Architect (Form 4)File: Certificates of Architect (Form 4).pdf31 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RUSHI GOVINDNEAR HUMPANCHWADI AT BARAMPUR VASAI RD TAL VASAI DIST PALGHAR 40120212CompletedDec 2016Oct 2016
SAIKRUPA APARTMENTNEAR HAMPACHWADI AT BARAMPUR POST VASAI RD TAL VASAI DIST PALGHAR 40120216CompletedSep 2014May 2014

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one moved by 97 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is completed

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep SHRI SIDHESHWAR COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolgaon530+ in Sindhudurg

2 kmSHRI SIDHESHWAR COMPLEXCompleted 2Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: RADHEY ENTERPRISES

RADHEY ENTERPRISES has 1 registration on MahaRERA, including SHRI SIDHESHWAR COMPLEX. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if SHRI SIDHESHWAR COMPLEX is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRI SIDHESHWAR COMPLEX?

The registered promoter entity is RADHEY ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRI SIDHESHWAR COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRI SIDHESHWAR COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRI SIDHESHWAR COMPLEX?

The professionals named in the filing: Architect: J M FAROZ; Engineer: J M FAROZ AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRI SIDHESHWAR COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRI SIDHESHWAR COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRI SIDHESHWAR COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.