Completed No litigation declared Others project

Shreeji Atlantis Wing A

By Shreeji Construction

RG-MH-21083 · RERA P51800004400 · Last updated on MahaRERA portal: 5 Apr 2024

Source: official MahaRERA filing

Red flags

  • 15 complaints at MahaRERA
  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
15Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

Shreeji Atlantis Wing A is a Others project by Shreeji Construction in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004400 on 9 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2023. The completion date has moved by 42 months from the original filing. 15 complaints are on record with the regulator.

At a glance

Project

  • NameShreeji Atlantis Wing A
  • TypeOthers
  • Location
    • ORLEM
    • MALAD WEST
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004400
  • ReraGenie IDRG-MH-21083

Builder

  • NameShreeji Construction
  • Entity typePartnership
  • PartnersNimesh Uttambhai Desai, Bhushan Khanderao Patil, Ashok Phootarmal Jain
  • Other registrations14 more →
  • Completed4 of 15
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017First promiseJun 2020Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 30 Jun 2020)
  • Buildings1 building record
  • Documents filed131 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shreeji Atlantis Wing ANA430000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Shreeji Atlantis Wing A: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities18

As on 5 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
COVERED PARKINGYes0%
Fitness CentreYes0%
Swimming PoolYes0%

Parking filed134

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots134
Closed/Covered134

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,385 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15404.0
Proposed, not sanctioned6,659 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAI BABA NAGAR, BORIVALI WEST

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Shreeji Construction-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800016756Jun 2020 → Dec 2023

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 31/12/2023

EXT51800005870Jun 2020 → Jun 2021

Reason as filed by the promoterDUE TO TECHNICAL ISSUE IN SRA WE WE UNABLE TO COMPLETE THE PROJECT IN TIME. ALSO WE HAVE REVISE SUBMISSION AS PER NEW DP 2034. THEREFORE WE WOULD LIKE TO REQUEST YOU TO PLEASE GRANT US EXTENSION FOR 1 YEAR.

EXT51800011402Jun 2020 → Jun 2023

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY, THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 30-06-2023

Litigation declared5

CaseCourtStatus
3040 OF 2011/2011Bombay city civil courtPENDING
3041 OF 2011/2011Bombay city civil courtPENDING
3042 OF 2011/2011Bombay city civil courtPENDING
3043 OF 2011/2011Bombay City civil courtPENDING
1753 OF 2016/2016Bombay city civil courtPENDING

Complaints filed with MahaRERA15

Case no.ComplainantRespondentFiled
CC006000000110797Mr A Felix and Mrs Pramila FelixShreeji Construction04/09/2019
CC006000000110799Eric Michael Almeida and Anne Cynthia Alexzandria Gonsalves AlmeidaShreeji Construction05/09/2019
CC006000000110806Andrea Tellis and Ambrose TellisShreeji Construction06/09/2019
CC006000000110853Anne Rodrigues and Adra RodriguesShreeji Construction10/09/2019
CC006000000120930Noel DMelloShreeji Construction17/09/2019
CC006000000120937Noel DMelloShreeji Construction16/09/2019
CC006000000120967Sunil ButelloShreeji Construction19/09/2019
CC006000000141186Mr Napoleon Estibeiro and Mrs Vanda EstibeiroShreeji Construction06/10/2019
CC006000000181986Gerald Wilson CoutinhoShreeji Construction26/12/2019
CC006000000193065Mr Oliver Fernandes and Mrs Lizia FernandesShreeji Construction18/03/2020
CC006000000195521Herman DCruz and Sharon DCruzShreeji Constructions05/01/2021
CC006000000196950Michele DharmaiShreeji Construction11/05/2021
CC006000000199041Mr Teejey Barretto and Mrs Vandana BarrettoShreeji Construction15/11/2021
CC006000000364526Faheem Faisal KapdiShreeji Construction27/02/2023
CC006000000395543Johnson PereiraM/s. Shreeji Construction19/05/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Feb 2024

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf5 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: shreeji atlantis a wing 22-23.pdf6 Mar 2024
Certificates of Architect (Form 4)File: Signed Form 4 Atlantis A Wing.pdf14 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Copy.pdf7 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Dec 23 ATLANTIS WING A.pdf23 Jan 2024
Certificates of CA (Form 3)File: Form 3 Ca Certificate Dec 23 Atlantis A Wing.pdf23 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 atlantis A OCT DEC 23.pdf10 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Atlantis A Wing.pdf26 Oct 2023
Certificates of CA (Form 3)File: Signed CA Certificate Shreeji Atlantis A Wing (1).pdf16 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed Engineer Certificate of Cost Incurred Atlantis A Wing.pdf3 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sign Atlantis A Wing arc.pdf24 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sign Atlantis A Wing arc.pdf24 Jul 2023
Certificates of CA (Form 3)File: Signed CA Certificate Atlantis A Wing as on june 23.pdf24 Jul 2023
Certificates of CA (Form 3)File: Latest Final CA Certificate Atlantis A Wing (1).pdf18 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shreeji Construction Atlantis A Wing Rera.pdf15 Jul 2023
Certificates of CA (Form 3)File: Atlantis A wing CA Certified revised.pdf14 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA From 5 Atlantis A wing FY 21-22.pdf10 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Signed Architect cer Atlantis A wing.pdf27 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed Engineer Certificate Atlantis A Wing.pdf27 Apr 2023
Certificates of CA (Form 3)File: FORM 3 ATLANTIS A.pdf21 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Signed Atlantis A architect certificate dec 22 (1).pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed engineer certificate Atlantis A dec22 (1).pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer form 2.pdf18 Oct 2022
Layout approvalFile: plans 1 - 2.pdf14 Oct 2022
Layout approvalFile: plans 3 - 4.pdf14 Oct 2022
Layout approvalFile: plans 5 - 6.pdf14 Oct 2022
Layout approvalFile: plans 7 - 8.pdf14 Oct 2022
Layout approvalFile: plans 9 - 10.pdf14 Oct 2022
Copy of Layout Approval (in case of layout)File: plans 1 - 2.pdf14 Oct 2022
Copy of Layout Approval (in case of layout)File: plans 3 - 4.pdf14 Oct 2022
Copy of Layout Approval (in case of layout)File: plans 5 - 6.pdf14 Oct 2022
Copy of Layout Approval (in case of layout)File: plans 7 - 8.pdf14 Oct 2022
Copy of Layout Approval (in case of layout)File: plans 9 - 10.pdf14 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Atlantis A sep 22 architect cer 12-Oct-2022 13-42-52 (1).pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Atlantis A engineer certificate june 22.pdf6 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Atlantis A Engineer March 22.pdf29 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Atlantis A wing as on June 22(1).pdf13 Aug 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society certificate Atlantis A wing_compressed.pdf14 Jul 2022
CERSAI detailsFile: Cersai Declaration.pdf20 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect form1.pdf23 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY CERTIFICATE-SHREEJI ATLANTIS.pdf12 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA FORM 5 20-21.pdf31 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Atlantis Wing A_compressed.pdf4 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Full CC Shreeji Atlantis.pdf18 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Atlantis A WING.pdf6 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Atlantis Sep-21.pdf6 Oct 2021
Form 2AFile: Form2 A - Atlantis.pdf6 Oct 2021
Certificates of CA (Form 3)File: Signed CA Certificate- SHREEJI ATLANTIS Sept'21.pdf6 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE JAN TO MARCH SHREEJI ATLANTIS A WING.pdf30 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE APRIL TO JUNE 2021SHREEJI ATLANTIS A WING.pdf30 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter for Society Formation -Atlantis.pdf20 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURE 2A (ATLANTIS) (1).pdf16 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate atlantis.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality assurance certificate Atlantis.pdf11 Aug 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate SHREEJI ATLANTIS.pdf11 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 19-20.pdf3 Aug 2021
Certificates of CA (Form 3)File: signed CA Certificate- SHREEJI ATLANTIS mar (1).pdf30 Jul 2021
Declaration about Commencement CertificateFile: declaration for CC -Atlantis.pdf21 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM- 2A Engineer-s Certificate 21-Jul-2021 17-22-44.pdf21 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate -Atlantis A Wing.pdf19 Jun 2021
Disclosure of sold/ booked inventoryFile: Atlantis A Wing 05-Jun-2021 13-19-58_compressed.pdf7 Jun 2021
Certificates of CA (Form 3)File: CA Certificate SHREEJI ATLANTIS SEP.pdf1 Mar 2021
Certificates of CA (Form 3)File: CA Certificate SHREEJI ATLANTIS DEC.pdf1 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: shreeji atlantis.pdf27 Feb 2021
Proforma of Allotment letterFile: allotment and agreement.pdf21 Jan 2021
Proforma of Allotment letterFile: draft of Allotment letter - Atlantis.pdf3 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHREEJI ATLANTIS ARCH.pdf2 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ATLANTIS.pdf15 Oct 2020
Building plan approvalFile: Atlantis IOA pg 1.pdf13 Oct 2020
Building Plan Approval (IOD)File: Atlantis IOA pg 1.pdf13 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: CC Atlantis_compressed.pdf13 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Ceriticate - Atlantis.pdf9 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shreeji Atlantis wing A.pdf30 Sep 2020
Certificates of CA (Form 3)File: ATLANTIS.pdf30 Sep 2020
Details of Restarting of Construction work post lockdownFile: ATLANTIS.pdf29 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Ceriticate - Atlantis_compressed.pdf13 Feb 2020
Certificates of CA (Form 3)File: Form 3 - Atlantis_compressed.pdf13 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ATLANTIS.pdf24 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ATLANTIS FORM -5 CA CERTIFICATE.pdf18 Nov 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 42 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shreeji Atlantis Wing A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

2 kmShreeji Atlantis Wing ACompleted 144Lapsed / revoked 98Other 145Dot size: filed unitsN

Filed coordinates, straight-line distance. 387 registered projects within 2 km.

Builder: Shreeji Construction

SHREEJI CONSTRUCTION has 15 registrations on MahaRERA, including SHREEJI CENTRUM and Shreeji Atlantis Wing A. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shreeji Atlantis Wing A is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shreeji Atlantis Wing A?

The registered promoter entity is Shreeji Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shreeji Atlantis Wing A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Shreeji Atlantis Wing A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Shreeji Atlantis Wing A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Shreeji Atlantis Wing A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shreeji Atlantis Wing A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shreeji Atlantis Wing A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.