Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Nov 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
4Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

Shreeji Aspire is a Residential / Group Housing project by Shreeji Construction in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003919 on 7 Aug 2017. The registration is recorded completed; possession was promised by 28 Nov 2022. The completion date has moved by 24 months from the original filing. 4 complaints are on record with the regulator.

At a glance

Project

  • NameShreeji Aspire
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003919
  • ReraGenie IDRG-MH-24045

Builder

  • NameShreeji Construction
  • Entity typePartnership
  • PartnersNimesh Desai, Bhushan Patil
  • Other registrations14 more →
  • Completed4 of 15
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017First promiseNov 2020Revised toNov 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Aug 2017
  • Promised completion28 Nov 2022
  • Revised completionRevised to 28 Nov 2022 (originally 30 Nov 2020)
  • Buildings1 building record
  • Documents filed111 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Composite Building 1NA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Composite Building 1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 16 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
COVERED CAR PARKYes100%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,054 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Mr Rajesh Manohar Patil and Mr Maksud Rana-Mumbai City

Approvals and building plan

Permissible FSI8152.0
Proposed, not sanctioned8,152 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSealord Chs, Saibaba Nagar, Ram Nagar, Borivali West, Mumbai, Maharashtra,pin 400092

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Shreeji Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005957Nov 2020 → Nov 2021

Reason as filed by the promoterThe said Project is being developed on all that piece and parcel of land bearing C.T.S. Nos. 1 (part) and 2 (part) admeasuring 2054.02 sq. mtrs., being, lying and situate at Village Valnai, Taluka Borivali, Gautam Buddha Marg, Orlem, Malad (West), Mumbai - 400064 (“said Land”) in accordance with the slum rehabilitation scheme under the provisions of Regulation 33 (10) of the Development Control Regulations for Greater Mumbai, 1991 (“DCR”). At the time of registering the said Project, we had furnished certain details regarding the Floor Space Index (“FSI”) available in respect of the said Land.

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000375059Samantha Tellis and Ambrose TellisShreeji Construction31/03/2023
CC006000000375286Ryan Ghanshyam JashnaniShreeji Construction17/04/2023
CC006000000395454Mr Steven Victor Nazareth Mrs Philomena Steven Nazareth Mr Brian NazarethShreeji Construction01/05/2023
CC006000000395545Shreeji ConstructionSonica Baptist19/05/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Sep 2023

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Aspire Form-5 FY 22-23.pdf16 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Shreeji Aspire Completion certificate 21-Sep-2023 18-50-53.pdf19 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shreeji Aspire - Full OC.pdf18 Sep 2023
Proforma of Agreement for saleFile: DRAFT OF ASPIRE AFS.pdf21 Aug 2023
Certificates of CA (Form 3)File: Signed CA Certificate Shreeji Construction Aspire Jun-23 (1).pdf3 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Aspire as on June 23 01-Aug-2023 18-26-45.pdf2 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC COPY.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Aspire.pdf21 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aspire Architect Certificate Rera as on Date 01-Jun-2023 17-52-10.pdf1 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: composite bulding 1 full oc wing B.pdf10 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Signed architect certificate Aspire.pdf27 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Apire_compressed.pdf27 Apr 2023
Certificates of CA (Form 3)File: FORM 3 ASPIRE.pdf21 Apr 2023
Certificates of CA (Form 3)File: Signed CA certificate Aspire dec 22.pdf28 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Signed Aspire architect cer Dec22.pdf27 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed Aspire Annual certificate 21-22.pdf27 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: registration certificate - shreeji aspire.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf4 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Aspire 21-22.pdf22 Dec 2022
Declaration about Commencement CertificateFile: cc declaration.pdf14 Dec 2022
CERSAI detailsFile: cersai declaration.pdf14 Dec 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: bare shell part oc composite building 1 aspire.pdf9 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer form 2.pdf19 Oct 2022
Certificates of CA (Form 3)File: CA form 3.pdf19 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aspire sep 22 architect cer 12-Oct-2022 13-37-39 (1).pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aspire engineer certificate june 22.pdf6 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aspire Engineer March 22.pdf29 Sep 2022
Certificates of CA (Form 3)File: Aspire CA certificate June 22.pdf16 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aspire as on June 22(1).pdf13 Aug 2022
Certificates of CA (Form 3)File: aspire CA certificate March 22(1).pdf3 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM -1 Architect certificate.pdf16 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY CERTIFICATE SHREEJI ASPIRE.pdf12 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aspire_compressed.pdf4 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Aspire - FY 19-20.pdf10 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Aspire - FY 20-21.pdf10 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Aspire SEP 2021.pdf7 Oct 2021
Certificates of CA (Form 3)File: Signed CA Certificate- ASPIRE - Sept'21.pdf7 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Aspire.pdf6 Oct 2021
Form 2AFile: Form2 A - Aspire.pdf6 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE JAN TO MARCH SHREEJI ASPIRE WING.pdf30 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE APRIL TO JUNE 2021SHREEJI ASPIRE.pdf30 Aug 2021
Certificates of CA (Form 3)File: CA Certificate- ASPIRE - MAR'21_compressed.pdf21 Aug 2021
Certificates of CA (Form 3)File: CA Certificate- ASPIRE - jun'21 (1)_compressed.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURE 2A (ASPIRE) (1).pdf16 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate -Aspire.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate aspire.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA Aspire.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate -Aspire.pdf19 Jun 2021
Disclosure of sold/ booked inventoryFile: Aspire 09-Jun-2021 11-40-48 (1).pdf9 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHREEJI ASPIRA.pdf27 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ASPIRE.pdf15 Oct 2020
Building plan approvalFile: ioa aspire.pdf13 Oct 2020
Building Plan Approval (IOD)File: ioa aspire.pdf13 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: CC Aspire.pdf13 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Ceriticate - Aspire.pdf9 Oct 2020
Certificates of CA (Form 3)File: ASPIRE.pdf30 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shreeji Aspire wing A_compressed.pdf28 Sep 2020
Details of Restarting of Construction work post lockdownFile: ASPIRE.pdf29 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Ceriticate - Aspire_compressed.pdf13 Feb 2020
Certificates of CA (Form 3)File: Form 3 - ASPIRE_compressed.pdf13 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ASPIRE.pdf24 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ASPIRE.pdf14 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ASPIRE.pdf12 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ASPIRE.pdf9 Nov 2019
Certificates of CA (Form 3)File: ASPIRE.pdf9 Nov 2019
Form 2AFile: FORM 2A ASPIRE.pdf7 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG.pdf27 Aug 2019
Certificates of CA (Form 3)File: CA.pdf27 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Aspire.pdf14 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: aspire.pdf17 Jun 2019
Certificates of CA (Form 3)File: ASPIRE.pdf16 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ASPIRE.pdf3 May 2019
Form 2AFile: aspire.pdf9 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aspire.pdf8 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng aspire.pdf7 Feb 2019
Certificates of CA (Form 3)File: FORM 3 ASPIRE.pdf6 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Shreeji Aspire compressed.pdf1 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch aspire.pdf29 Nov 2018
Certificates of CA (Form 3)File: CA Shreeji Aspire.pdf29 Nov 2018
Certificates of CA (Form 5)File: Aspire 15-Oct-2018 15-01-33.pdf15 Oct 2018

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shreeji Aspire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmShreeji AspireCompleted 140Lapsed / revoked 97Other 144Dot size: filed unitsN

Filed coordinates, straight-line distance. 381 registered projects within 2 km.

Builder: Shreeji Construction

SHREEJI CONSTRUCTION has 15 registrations on MahaRERA, including SHREEJI CENTRUM and Shreeji Atlantis Wing A. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shreeji Aspire is delayed beyond 28 Nov 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shreeji Aspire?

The registered promoter entity is Shreeji Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shreeji Aspire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Shreeji Aspire?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Shreeji Aspire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Shreeji Aspire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shreeji Aspire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shreeji Aspire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.