Registration lapsed No litigation declared Residential / Group Housing project

SHREEJI ASHISH D- WING AND CFC

By SHREEJI DEVELOPERS

RG-MH-12458 · RERA P99000001991 · Last updated on MahaRERA portal: 25 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 43 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2023Possession promised43 months past this date
6 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

SHREEJI ASHISH D- WING AND CFC is a Residential / Group Housing project by SHREEJI DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000001991 on 31 Jul 2017. Possession was promised by 30 Mar 2023 and is now 43 months past that date.

At a glance

Project

  • NameSHREEJI ASHISH D- WING AND CFC
  • TypeResidential / Group Housing
  • Location
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401202
  • Pincode401202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000001991
  • ReraGenie IDRG-MH-12458

Builder

  • NameSHREEJI DEVELOPERS
  • Entity typePartnership
  • PartnersJAY RAJESH PARIKH, JASMIN KANAIYALAL MEHTA, TEJAS SHAILESH MEHTA, SHAILESH JUGALDAS MEHTA, NALIN BHUPATRAI MEHTA, BHUPATRAI MANGILAL MEHTA, KEVAL JASMIN MEHTA, RAJESH KANTILAL PARIKH HUF, TEJAS SHAILESH MEHTA, SHAILESH JUGALDAS MEHTA, KEVAL JASMIN MEHTA, RAJESH KANTILAL PARIKH HUF and 12 more
  • Other registrations26 more →
  • Completed11 of 27
  • No longer live4 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects7 →

Key dates

43 months past promisethis monthRegisteredJul 2017PromisedMar 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Jul 2017
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREEJI ASHISH D WINGNA70000
CFC BUILDINGNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

SHREEJI ASHISH D WING27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CFC BUILDING27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Open Space9
BuildingOpen SpaceTotal
SHREEJI ASHISH D WING77
CFC BUILDING22

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,320 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1190.49
Proposed, not sanctioned836 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASAI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE
EngineerSURESH PANIKER AND ASSOCIATES
Chartered AccountantCA ALPESH BHOGILAL SHAH
Chartered AccountantCA DEVESH KANTILAL PARIKH
PartnerRole in project
SHREEJI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: SHREEJI ASHISH FORM 3 30-09-24.PDF25 Nov 2024
Certificates of CA (Form 3)File: SHREEJI ASHISH D WING - FORM 3.PDF22 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SHREEJI ASHISH D WING FORM - 5.PDF22 Nov 2024
Details of encumbrances concerned to FinanceFile: SHREEJI ASHISH NO ENCUMBRANCES.PDF3 May 2024
Details of encumbrancesFile: SHREEJI ASHISH NO ENCUMBRANCES.PDF3 May 2024
Details of encumbrances concerned to LegalFile: SHREEJI ASHISH NO ENCUMBRANCES.PDF3 May 2024
Declaration about Commencement CertificateFile: SHREEJI ASHISH FORMAT D.PDF3 May 2024
CERSAI detailsFile: SHREEJI ASHISH CERSAI CERTIFICATE.PDF3 May 2024
Disclosure of sold/ booked inventoryFile: SHREEJI ASHISH SOLD BOOKED INVENTORY.PDF3 May 2024
Certificates of CA (Form 3)File: SHREEJI DEVELOPERS ASHISH - FORM 3 - 31-03-2022.PDF25 Apr 2024
Certificates of CA (Form 3)File: SHREEJI DEVELOPERS ASHISH - FORM 3 - 31-03-2023.PDF25 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SHREEJI DEVELOPERS ASHISH - FORM 5 - 31-03-2022.PDF25 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SHREEJI DEVELOPERS ASHISH - FORM 5 - 31-03-2023.PDF25 Apr 2024
Certificates of CA (Form 3)File: FORM-3 SHREEJI ASHISH D-WING CFC BUILDING.PDF19 Aug 2021
Certificates of CA (Form 3)File: FORM-3 D-WIN CFC BUILDING.PDF14 Aug 2021
Certificates of CA (Form 3)File: FORM-3 SHREEJI ASHISH CFC BLDG.PDF14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5 SHREEJI ASHISH CFC BLDG.PDF14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 D-WIN CFC BUILDING.PDF14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.PDF27 Nov 2019
Certificates of CA (Form 3)File: FORM 3.PDF28 Sep 2019
Certificates of CA (Form 5)File: FORM 5.PDF28 Sep 2019
Certificates of CA (Form 3)File: shreeji ashish d wing form 3.PDF26 Jun 2019
Certificates of CA (Form 5)File: form -5 vasai D Wing.PDF26 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE CFC 30-12-2017.PDF24 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE D WING 30-12-2017.PDF24 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE CFC 30-12-2017.PDF24 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE D WING 30-12-2017.PDF24 May 2018
Certificates of CA (Form 3)File: CA-CERT-shreeji developers -shreeji ashish 30-09-2017.PDF24 May 2018
Certificates of CA (Form 3)File: CA-CERT-shreeji developers shreeji ashish 31-12-2017.PDF24 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE CFC 30-09-2017.PDF29 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE D WING 30-9-2017.PDF29 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE CFC 30-09-2017.PDF29 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE d wing 30-09-2017.PDF29 Mar 2018
Proforma of Allotment letterFile: Final allotment letter CFC.pdf26 Jul 2017
Proforma of Allotment letterFile: Final Allotment Letter d wing .pdf26 Jul 2017
Layout approvalFile: Layout plan.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout plan.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Development Permission CFC (1).pdf25 Jul 2017
Certificates of CA (Form 3)File: Shreeji Dev Ca certificate D and CFC (3 files merged).pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cfc Revised Architects certificate.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Ec of Cfc.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New EC Of D Wing .pdf24 Jul 2017
Building plan approvalFile: D wing 5th floor plan _ REDUCED.pdf21 Jul 2017
Building plan approvalFile: Ground floor plan TO 4TH FLOOR PLAN.pdf21 Jul 2017
Building plan approvalFile: Plan Copy CFC (2).pdf21 Jul 2017
PAN CardFile: Company PAN Card.PDF21 Jul 2017
Copy of the legal title reportFile: Tital Search.pdf21 Jul 2017
Details of encumbrancesFile: Encumbrances.pdf21 Jul 2017
Details of encumbrancesFile: Encumbrances CFC.pdf21 Jul 2017
Building Plan Approval (IOD)File: Ground floor plan TO 4TH FLOOR PLAN.pdf21 Jul 2017
Building Plan Approval (IOD)File: D wing 5th floor plan _ REDUCED.pdf21 Jul 2017
Building Plan Approval (IOD)File: Plan Copy CFC (2).pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Revised Development permission D wing_REDUCED.pdf21 Jul 2017
Declaration in FORM BFile: Form B D wing.pdf21 Jul 2017
Declaration in FORM BFile: Form B CFC.pdf21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S Certificate D Wing_2.pdf21 Jul 2017
Proforma of Allotment letterFile: shreeji dev agreement vasai_REDUCED.pdf21 Jul 2017
Proforma of Allotment letterFile: shreeji dev agreement vasai (8).pdf21 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREEJI ARCADESURVEY NO 198 HISSA NO 1 3 - 1 3- 2A BUNGLI HOSPITAL ROAD SANDOR VAISAI WEST 4012028CompletedJul 2015Jun 2015
SHREEJI ASHISHS NO 198 SHREEJI ASHISH BUILDING BUNGLI HOSPITAL ROAD SANDOR BHAGOLA NAKA VASAI WEST DIST PALGHAR PIN 40120259CompletedJun 2013May 2013

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREEJI ASHISH D- WING AND CFC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai-Virar City (M Corp)3,200+ in Palghar

2 kmSHREEJI ASHISH D- WING ACompleted 47Lapsed / revoked 29Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: SHREEJI DEVELOPERS

SHREEJI DEVELOPERS has 27 registrations on MahaRERA, including SAHAJANAND INTEGRITY and SHREEJI DREAMS. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that SHREEJI ASHISH D- WING AND CFC shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREEJI ASHISH D- WING AND CFC is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEJI ASHISH D- WING AND CFC?

The registered promoter entity is SHREEJI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEJI ASHISH D- WING AND CFC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREEJI ASHISH D- WING AND CFC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEJI ASHISH D- WING AND CFC?

The professionals named in the filing: Architect: AJAY WADE; Engineer: SURESH PANIKER AND ASSOCIATES; Chartered Accountant: CA ALPESH BHOGILAL SHAH; Chartered Accountant: CA DEVESH KANTILAL PARIKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEJI ASHISH D- WING AND CFC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEJI ASHISH D- WING AND CFC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEJI ASHISH D- WING AND CFC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.