ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / SHREE VAKRATUNDA HIEGHTS

Registration lapsed No litigation declared Residential / Group Housing project

SHREE VAKRATUNDA HIEGHTS

By SHREE SADGURU REALTOR

RG-MH-45714 · RERA P99000045408 · Last updated on MahaRERA portal: 27 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 6 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Apr 2026Possession promised6 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
14 of 130Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

SHREE VAKRATUNDA HIEGHTS is a Residential / Group Housing project by SHREE SADGURU REALTOR in Palghar, Maharashtra, registered with MahaRERA as P99000045408 on 18 May 2022. Possession was promised by 1 Apr 2026 and is now 6 months past that date. 116 of the 130 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE VAKRATUNDA HIEGHTS
  • TypeResidential / Group Housing
  • Location
    • DATTA NAGAR
    • NALLASOPARA EAST
    • Vasai
    • Palghar
    • 401209
  • Pincode401209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000045408
  • ReraGenie IDRG-MH-45714

Builder

  • NameSHREE SADGURU REALTOR
  • Entity typePartnership
  • GSTIN27AEPFS7547M1Z0
  • PartnersSUREKHA BABURAO JADHAV, NITIN BABURAO JADHAV
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

6 months past promisethis monthRegisteredMay 2022PromisedApr 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 May 2022
  • Promised completion1 Apr 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

89%116 of 130 units booked
100.0%Work done, per cost certificate

Figures as on 27 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE VAKRATUNDA HIEGHTSNA14141300130

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SHREE VAKRATUNDA HIEGHTS: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,070 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Sep 2024
LandownerVillageDistrict
BABURAO S JADHAVVasai-Virar City (M Corp)Palghar
SHEKHAR H JADHAVVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI VIRAR MUNCIPAL CORPORATION
Permissible FSI7275.98
Proposed, not sanctioned7,276 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAI KIRAN,NARAYAN NAGAR,NALLASOPARA EAST
Estimated costRs 16.36 cr
Cost incurredRs 16.36 cr
Work done100.0%
BuildingWingEstimatedIncurred
SHREE VAKRATUNDA HIEGHTSNARs 15.55 crRs 15.55 cr
-NARs 81.82 lakhRs 81.82 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA & ASSOCIATES
EngineerSHILPA LEKA CONSULTATNT
EngineerSANAT MEHTA & ASSOCIATES
EngineerFAROOQ NAGORI
Chartered AccountantASHWIN NAIR & ASSOCIATES
Chartered Accountantashwin nair
Chartered AccountantJAIN & NAIR ASSOCIATES
Chartered AccountantAKSHAY JAIN
PartnerRole in project
SHREE SADGURU REALTOR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 AB wing.pdf27 Dec 2025
Withdrawal Update Form 1File: Form 1 AB wing.pdf27 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Cft Wing Au0026B April-June 2025.pdf27 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Cft Wing Au0026B April-June 2025.pdf27 Dec 2025
Withdrawal Update Form 3File: form 3 A B Wing jun 25.pdf27 Dec 2025
Withdrawal Update Form 3File: form 3 A B Wing jun 25.pdf27 Dec 2025
Form 1File: form 1 Oct-Dec wing AB.pdf7 Jun 2025
Form 2File: form 2 Oct-Dec wing AB.pdf7 Jun 2025
Form 3File: FORM 3 DEC 24.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD MAR 25.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration.pdf7 Jun 2025
Form 1File: form 1 jan to march wing AB.pdf7 Jun 2025
Form 2File: Form-2-Jan-March 25-AB (1)-1.pdf7 Jun 2025
Form 3File: form 3 mar 25.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD MAR 25.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration.pdf7 Jun 2025
Withdrawal Update Form 1File: form 1 jan to march wing AB.pdf7 Jun 2025
Withdrawal Update Form 2File: Form-2-Jan-March 25-AB (1)-1.pdf7 Jun 2025
Withdrawal Update Form 3File: form 3 mar 25.pdf7 Jun 2025
Withdrawal Update Form 1File: form 1 jan to march wing AB.pdf28 May 2025
Withdrawal Update Form 2File: Form-2-Jan-March 25-AB (1)-1.pdf28 May 2025
Withdrawal Update Form 3File: form 3 mar 25.pdf28 May 2025
Form 2A (FY 2023-2024)File: 2A 23-24.pdf28 May 2025
Form 2A (FY 2024-2025)File: 2A 24-25.pdf28 May 2025
Form 5 (FY 2023-2024)File: form 5 23-24.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I April June 2024 AB.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 julysep24 AB wing.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 A B May JUNE 24.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 WING A B jul sep.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 A BMay JUNE 24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 july sep AB wing.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 24.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 Aug 2022.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Aug 23.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec 2023.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 march 24_rotated.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 jan 2023.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Aug 2023.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 2023.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 24.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FEB 23.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEP 23.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 23.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR 24.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan 14-Mar-2024.pdf8 Apr 2024
Copy of the legal title reportFile: title search new rera.pdf11 May 2022
Declaration in FORM BFile: form B rera.pdf22 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: SN101.pdf19 Apr 2022
Layout approvalFile: layout.pdf29 Mar 2022
Copy of Layout Approval (in case of layout)File: layout.pdf29 Mar 2022
Proforma of Allotment letterFile: allotment letter.pdf29 Mar 2022
Proforma of Allotment letterFile: SHREE VAKRATUNDA HEIGHTS DRAFT AGREEMENT.pdf29 Mar 2022
Building plan approvalFile: layout.pdf26 Mar 2022
Building plan approvalFile: typical plan.pdf26 Mar 2022
Building plan approvalFile: sectional.pdf26 Mar 2022
PAN CardFile: pan card.pdf26 Mar 2022
Details of encumbrancesFile: letter encumbrance.pdf26 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: layout.pdf26 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: typical plan.pdf26 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: sectional.pdf26 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: NA ORder.pdf26 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: new NA Order.pdf26 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf26 Mar 2022
Declaration about Commencement CertificateFile: declaration of commencement.pdf26 Mar 2022
Declaration in FORM BFile: affidivate cum declaration.pdf26 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architech form 1.pdf26 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: architech form 2.pdf26 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf26 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf26 Mar 2022

How this compares with Palghar

89%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE VAKRATUNDA HIEGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALLASOPARA EAST3,200+ in Palghar

2 kmSHREE VAKRATUNDA HIEGHTSCompleted 33Lapsed / revoked 30Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 168 registered projects within 2 km.

Builder: SHREE SADGURU REALTOR

SHREE SADGURU REALTOR has 2 registrations on MahaRERA, including SHREE VAKRATUNDA HIEGHTS and SHREE VAKRATUNDA HEIGHTS C WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that SHREE VAKRATUNDA HIEGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE VAKRATUNDA HIEGHTS is delayed beyond 1 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE VAKRATUNDA HIEGHTS?

The registered promoter entity is SHREE SADGURU REALTOR, a partnership as per the filing. Its GSTIN 27AEPFS7547M1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE VAKRATUNDA HIEGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE VAKRATUNDA HIEGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE VAKRATUNDA HIEGHTS?

The professionals named in the filing: Architect: SANAT MEHTA & ASSOCIATES; Engineer: SHILPA LEKA CONSULTATNT; Engineer: SANAT MEHTA & ASSOCIATES; Engineer: FAROOQ NAGORI; Chartered Accountant: ASHWIN NAIR & ASSOCIATES; Chartered Accountant: ashwin nair. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE VAKRATUNDA HIEGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE VAKRATUNDA HIEGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE VAKRATUNDA HIEGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.