Home / Browse projects / Pune, Maharashtra / SHREE SWAMI SAMARATH RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

SHREE SWAMI SAMARATH RESIDENCY

By SHARAYU AND SAANVI CONSTRUCTION

RG-MH-27501 · RERA P52100033938 · Last updated on MahaRERA portal: 2 Mar 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 20 documents Report an error

SHREE SWAMI SAMARATH RESIDENCY is a Residential / Group Housing project by SHARAYU AND SAANVI CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100033938 on 14 Mar 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameSHREE SWAMI SAMARATH RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • KATEWASTI
    • VIJAYNAGAR COLONY NO. 5
    • DIGHI
    • PUNE - 411015. KATEWASTI
    • VIJAY NAGAR COLONY NUMBER 05
    • DIGHI
    • PUNE
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411015
  • Pincode411015
  • RERA no.P52100033938
  • ReraGenie IDRG-MH-27501

Builder

  • NameSHARAYU AND SAANVI CONSTRUCTION
  • Entity typePartnership
  • PartnersKULDEEP GENBA PARANDE, VIKAS HARISHCHANDRA DOLAS

Key dates

10 months past promisethis monthRegisteredMar 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed20 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA70000
WING BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered28
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
WING A8210
WING B20222

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area900 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
DEEPAK BALASAHEB PARANDE-Pune
UTTAM NARAYAN PARANDE-Pune
DILIP JYOTIBA BHOSALE-Pune

Approvals and building plan

Permissible FSI1954.8
Proposed, not sanctioned1,555 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDIGHI

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectINTEGRITY ARCH AND ASSOCIATES
EngineerRAVINDRA A. KARNAVAT
EngineerINTEGRITY ARCH AND ASSOCIATES
Chartered AccountantVINIT D ACHHA AND ASSOCIATES
Chartered AccountantDnyanesh V Shinde
PartnerRole in project
SHARAYU AND SAANVI CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed20

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Adobe Scan Feb 3, 2022 (1).pdf2 Mar 2022
Building plan approvalFile: plan sanavi Building.pdf2 Mar 2022
Building plan approvalFile: Plan Sharayu And Saanvi Construction.pdf2 Mar 2022
PAN CardFile: Pan Card - Sharayu and Sanavi Construction.pdf2 Mar 2022
Copy of the legal title reportFile: Legal Report - Sharayu And Saanvi Construction_compressed_compressed.pdf2 Mar 2022
Details of encumbrancesFile: No Encumbrance Declaration.pdf2 Mar 2022
Copy of Layout Approval (in case of layout)File: Adobe Scan Feb 3, 2022 (1).pdf2 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: plan sanavi Building.pdf2 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan Sharayu And Saanvi Construction.pdf2 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Mar 2022
Declaration about Commencement CertificateFile: declaration about commentment.pdf2 Mar 2022
Declaration in FORM BFile: Form B_compressed.pdf2 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sharayu sanvi.pdf2 Mar 2022
Disclosure of sold/ booked inventoryFile: disclosure of sold unsold Wing A.pdf2 Mar 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory WING B Sharayu sanavi.pdf2 Mar 2022
CERSAI detailsFile: CERSAI_Search_200231461751.pdf2 Mar 2022
CERSAI detailsFile: CERSAI Report sharayu sanavi.pdf2 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 sharayu sanavi_compressed.pdf2 Mar 2022
Proforma of Allotment letterFile: Agreement to sale_sharayu and saanvi construction 14022022.pdf2 Mar 2022
Proforma of Allotment letterFile: allotment letter.pdf2 Mar 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SWAMI SAMARATH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DIGHI,PUNE13,700+ in Pune

Builder: SHARAYU AND SAANVI CONSTRUCTION

SHARAYU AND SAANVI CONSTRUCTION has 1 registration on MahaRERA, including SHREE SWAMI SAMARATH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SHREE SWAMI SAMARATH RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE SWAMI SAMARATH RESIDENCY is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SWAMI SAMARATH RESIDENCY?

The registered promoter entity is SHARAYU AND SAANVI CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SWAMI SAMARATH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE SWAMI SAMARATH RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SWAMI SAMARATH RESIDENCY?

The professionals named in the filing: Architect: INTEGRITY ARCH AND ASSOCIATES; Engineer: RAVINDRA A. KARNAVAT; Engineer: INTEGRITY ARCH AND ASSOCIATES; Chartered Accountant: VINIT D ACHHA AND ASSOCIATES; Chartered Accountant: Dnyanesh V Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SWAMI SAMARATH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SWAMI SAMARATH RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SWAMI SAMARATH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.