Home / Browse projects / Mumbai Suburban, Maharashtra / Shree Siidha Pride

Registered No litigation declared Others project

Shree Siidha Pride

By Ganalaxmi Homes

RG-MH-95075 · RERA P51800047845 · Last updated on MahaRERA portal: 21 May 2025

Source: official MahaRERA filing

Red flags

  • Rs 6.00 crore secured on the land, in favour of Choice Finserv Private Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Staircases, 25%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Shree Siidha Pride is a Others project by Ganalaxmi Homes in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047845 on 28 Nov 2022. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameShree Siidha Pride
  • TypeOthers
  • Location
    • GOSHALA ROAD
    • MULUND WEST
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • RERA no.P51800047845
  • ReraGenie IDRG-MH-95075

Builder

  • NameGanalaxmi Homes
  • Entity typePartnership
  • PartnersBharti Harakchand Poladia, Prakash Dhanji Rudani, Nirmal Prakash Rudani

Key dates

this monthRegisteredNov 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE SIIDHA PRIDENA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 25%.

SHREE SIIDHA PRIDE: 30% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area580 sq m
Land owned byThe promoter, with other names on the file
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofChoice Finserv Private Limited
Secured amountRs 6.00 crore
CERSAI search filedYes
Declared on2 Jul 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI535.0
Proposed, not sanctioned535 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMULUND WEST MUMBAI 400080

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR P ASUNDARIYA
EngineerSHANTI CONSULTANTS
Chartered AccountantSTP & Associates
PartnerRole in project
Ganalaxmi Homes-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 24-25.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 24-25.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 24-25.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 24-25.pdf21 May 2025
CERSAI detailsFile: 5 CERSAI Q4 24-25.pdf21 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Details Quater 1 of 23-24.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Details Quater 2 of 23-24.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Details Quater 3 of 23-24.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Details Quater 4 of 23-24.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Details Quater 1 of 24-25.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Details Quater 2 of 24-25.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Details Quater 3 of 24-25.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Details Quater 4 of 24-25.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Annually of 23-24.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 23-24.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 23-24.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1 24-25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 24-25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 24-25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 24-25.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 23-24.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 23-24.pdf28 Apr 2025
CERSAI detailsFile: CERSAI Q1 23-24.pdf28 Apr 2025
CERSAI detailsFile: CERSAI Q2 23-24.pdf28 Apr 2025
CERSAI detailsFile: CERSAI Q3 23-24.pdf28 Apr 2025
CERSAI detailsFile: CERSAI Q4 23-24.pdf28 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 2425.pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 24-25.pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 2425.pdf17 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf15 Mar 2025
PAN CardFile: Ganalaxmi PAN.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 -FY-22-23 Annual.pdf8 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect form 1 30-06-2022.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect from 1 30-09-2022.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect form 1 31-12-2022.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect form 1 31-03-2023.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect form 1 30-06-2023.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect form 1 30-09-2023.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate Form 2 30-06-2022.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate form 2 30-09-2022.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer Certificate form 2 31-03-2023.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer certificate Form 2 30-06-2023.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer Certificate Form 2 30-09-2023.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Form 3 1-Agree.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca form 3-2-Agree.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca form 3- 3-Agree.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca form 3 - 4-Agree.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca form 3 - 5-Agree.pdf1 Mar 2024
Disclosure of sold/ booked inventoryFile: 29 Rudani Antares.pdf24 Dec 2022
Proforma of Allotment letterFile: Allotment Rudani.pdf15 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Format Form 3 - Rudani Antares_compressed.pdf11 Nov 2022
Details of encumbrances concerned to LegalFile: No Encumb Legal Revised 4Oct22.pdf11 Oct 2022
Proforma of Agreement for saleFile: Allotment Letter Format Compressed.pdf11 Oct 2022
Proforma of Agreement for saleFile: Agreement for sale part 1 Rev Compre.pdf11 Oct 2022
Proforma of Agreement for saleFile: Agreement for sale part 2 Rev Compr.pdf11 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Report Rev 11Oct.pdf11 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report Rev 11Oct.pdf11 Oct 2022
Building plan approvalFile: PLAN_APPROVED.pdf28 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN_APPROVED.pdf28 Sep 2022
Details of encumbrances concerned to FinanceFile: no encumbrance finance_Rev22Sept22.pdf23 Sep 2022
Other - FinanceFile: no encumbrance finance_Rev22Sept22.pdf23 Sep 2022
Layout approvalFile: IOD.pdf8 Sep 2022
PAN CardFile: PAN of Rudani Developers.pdf8 Sep 2022
Copy of the legal title reportFile: Legal Title Report 24Aug22.pdf8 Sep 2022
Copy of Layout Approval (in case of layout)File: IOD.pdf8 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Sep 2022
Declaration about Commencement CertificateFile: Declaration of CC form D.pdf8 Sep 2022
Declaration in FORM BFile: Form B Promoter_COMPRESSED.pdf8 Sep 2022
CERSAI detailsFile: CERSAI report.pdf8 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf8 Sep 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shree Siidha Pride on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

Builder: Ganalaxmi Homes

Ganalaxmi Homes has 1 registration on MahaRERA, including Shree Siidha Pride. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shree Siidha Pride is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Siidha Pride?

The registered promoter entity is Ganalaxmi Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Siidha Pride?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Siidha Pride?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Siidha Pride?

The professionals named in the filing: Architect: R P ASUNDARIYA; Engineer: SHANTI CONSULTANTS; Chartered Accountant: STP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Siidha Pride?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Siidha Pride. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Siidha Pride to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.