SHREE SANKET GARDEN PHASE II

By SHREE SANKET DEVELOPERS

RG-MH-67346 · RERA P51600015055 · Last updated on MahaRERA portal: 23 Jul 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 33 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jan 2024Possession promised33 months past this date
18 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

SHREE SANKET GARDEN PHASE II is a Others project by SHREE SANKET DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600015055 on 22 Jan 2018. Possession was promised by 30 Jan 2024 and is now 33 months past that date.

At a glance

Project

  • NameSHREE SANKET GARDEN PHASE II
  • TypeOthers
  • Location
    • MALEGAON NAMPUR ROAD
    • NILGAVHAN
    • Malegaon
    • Nashik
    • 423103
  • Pincode423103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600015055
  • ReraGenie IDRG-MH-67346

Builder

  • NameSHREE SANKET DEVELOPERS
  • Entity typePartnership
  • PartnersYOGESH NEMICHAND MODI, DEEPAK NEMICHAND MODI, RAJENDRA MADHUKAR BHAMARE
  • Other registrations6 more →
  • Completed3 of 7
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

33 months past promisethis monthRegisteredJan 2018PromisedJan 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Jan 2018
  • Promised completion30 Jan 2024
  • Revised completionNone
  • Buildings5 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-WINGNA60000
F-WINGNA60000
E-WINGNA60000
G-WINGNA60000
H-WINGNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 23 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

A-WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F-WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G-WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H-WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered38
BuildingClosed/CoveredTotal
A-WING1414
E-WING88
G-WING88
H-WING88

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,969 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10751.75
Proposed, not sanctioned10,752 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANTOSH ARCADE, SHIVAJI PUTLA, MALEGAON-423203

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMADHUSUDAN KABRA
EngineerPRASANNA MANOHAR BHORE
PartnerRole in project
SHREE SANKET DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 May 2023

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Phase II Garden_310324_Stamp.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory_23072024.PDF23 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_23-24_Garden P 2.PDF15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Phase II Garden_310324.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory_31032024.PDF8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase II Garden_310324.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A_SSG_II_23-24.pdf6 Jul 2024
Certificates of CA (Form 3)File: Form 3 - Garden P2_310324.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: From 2 a A Engineers Certificate Pranesh Sir Documents.PDF14 Dec 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-1.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-2.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-3.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-4.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-5.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-6.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-7.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-7.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-8.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-9.pdf30 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SSG Declaration Phase 2_compressed-10.pdf30 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked Inventory _311023.PDF8 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 310323.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase II Garden_300923.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Phase II Garden_300923.pdf21 Oct 2023
Certificates of CA (Form 3)File: Form 3 - Garden P2_310323.pdf9 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Garden P2_310323.pdf16 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SSG_Phase 2_OC.PDF23 May 2023
Other - TechnicalFile: SSG Phase 2_Annexure A.PDF23 May 2023
Other - TechnicalFile: SSG Phase 2_Annxure B_Com.pdf23 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase II Garden_310321.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase II Garden_310322.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Phase II Garden_310321.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Phase II 2021-22_310322.pdf6 May 2023
Certificates of CA (Form 3)File: Form 3 - Garden P2_310321.pdf6 May 2023
Certificates of CA (Form 3)File: Form 3 - Garden P2_310322.pdf6 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DNM_Disclosure of Int_Garden P2.PDF6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase II Garden_310318.pdf5 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase II Garden_310319.pdf5 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Phase II Garden_310320.pdf5 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1 Phase II Garden_310318.pdf5 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Phase II Garden_310319.pdf5 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Phase II Garden_310320.pdf5 May 2023
Certificates of CA (Form 3)File: Form-1 Phase II Garden_310318.pdf5 May 2023
Certificates of CA (Form 3)File: Form 3 - Garden P2_310319.pdf5 May 2023
Certificates of CA (Form 3)File: Form 3 - Garden P2_310318.pdf5 May 2023
Certificates of CA (Form 3)File: Form 3 - Garden P2_310320.pdf5 May 2023
Details of encumbrances concerned to FinanceFile: SSG P2_Non Enc Legal.PDF21 Dec 2022
Details of encumbrances concerned to LegalFile: SSG P2_Non Enc Legal.PDF21 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SSG P2_Sep Bank.PDF21 Dec 2022
Deviation Report with respect to Allotment letterFile: SSG P2_Deviation AL.PDF21 Dec 2022
Deviation Report with respect to model copy of AgreementFile: SSG P2_Deviation ATS.PDF21 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Garden Phase 2.PDF9 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Garden Phase 2.pdf16 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2A_Garden Ph2_31032020.pdf1 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From 2A_Garden Ph2_31032021.pdf1 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Sanket Garden 2_compressed.pdf23 Jul 2022
CERSAI detailsFile: Garden P 2.pdf12 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-Booked Inventory(SSG Phase 2)_compressed.pdf8 Sep 2021
Declaration about Commencement CertificateFile: Garden Phase II_Form D.pdf25 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Phase II_compressed.pdf31 Mar 2021
Certificates of CA (Form 5)File: Garden Phase II RERA Audit.pdf3 Oct 2019
Certificates of CA (Form 5)File: Shree Sanket Garden Phase II Form 5.pdf6 Oct 2018
Certificates of CA (Form 3)File: Form 3 Shree Sanket Developers- Phase 2 FINAL.pdf13 Jan 2018
Building plan approvalFile: Building Plan A wing.pdf11 Jan 2018
Building plan approvalFile: Building Plan E, G, H Wing.pdf11 Jan 2018
Building plan approvalFile: Building Plan F Wing.pdf11 Jan 2018
Layout approvalFile: layout Plan.pdf11 Jan 2018
PAN CardFile: PAN CARD.pdf11 Jan 2018
Copy of the legal title reportFile: Search Report Sanket Garden.pdf11 Jan 2018
Details of encumbrancesFile: No Encumbrance Certificate.pdf11 Jan 2018
Copy of Layout Approval (in case of layout)File: layout Plan.pdf11 Jan 2018
Building Plan Approval (IOD)File: Building Plan A wing.pdf11 Jan 2018
Building Plan Approval (IOD)File: Building Plan E, G, H Wing.pdf11 Jan 2018
Building Plan Approval (IOD)File: Building Plan F Wing.pdf11 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Phase II Plot No 1 Final Permition.pdf11 Jan 2018
Declaration in FORM BFile: Affidavit cum Declaration.pdf11 Jan 2018
Proforma of Allotment letterFile: Allotment Letter.pdf11 Jan 2018
Proforma of Allotment letterFile: Agreement Draft.pdf11 Jan 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHREE SANKET GARDENP51600003519Near Hotel Yash Garden, Nilgavhan Shivar, Nashik-Aug 2017CompletedAug 2023Registered original: Jan 2022May 2023
SANKET EMPIRESHREE SANKET EMPIRE BEHIND DISTRICT COURT STATE BANK ROAD MALEGAON92-CompletedDec 2018Dec 2018

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SANKET GARDEN PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NILGAVHAN4,100+ in Nashik

2 kmSHREE SANKET GARDEN PHASCompleted 3Lapsed / revoked 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: SHREE SANKET DEVELOPERS

SHREE SANKET DEVELOPERS has 7 registrations on MahaRERA, including SHREE SANKET GARDEN and SHREE SANKET EMPIRE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that SHREE SANKET GARDEN PHASE II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE SANKET GARDEN PHASE II is delayed beyond 30 Jan 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SANKET GARDEN PHASE II?

The registered promoter entity is SHREE SANKET DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SANKET GARDEN PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE SANKET GARDEN PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SANKET GARDEN PHASE II?

The professionals named in the filing: Architect: MADHUSUDAN KABRA; Engineer: PRASANNA MANOHAR BHORE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SANKET GARDEN PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SANKET GARDEN PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SANKET GARDEN PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.