Home / Browse projects / SHREE SAI MAULI
SHREE SAI MAULI
RG-MH-10204 · RERA P51900002897 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE SAI MAULI is a Residential / Group Housing project by DILIP SHRINIWAS HATE in Mahim -west, 400016, registered with MahaRERA as P51900002897 on 4 Aug 2017. Possession is promised by 30 Dec 2027. 6 of the 36 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE SAI MAULI
- TypeResidential / Group Housing
- Location
- Bhandar Gully
- Mahim -west
- 400016
- Pincode400016
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900002897
- ReraGenie IDRG-MH-10204
Builder
- NameDILIP SHRINIWAS HATE
- Entity typeIndividual
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Aug 2017
- Promised completion30 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed183 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE SAI MAULI | NA | 20 | 18 | 36 | 0 | 36 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 56%.
SHREE SAI MAULI: 53% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 56% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE SAI MAULI | NA | Rs 21.00 cr | Rs 6.10 cr |
| - | NA | Rs 3.00 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SMT SUMEDHA GORE |
| Engineer | GAUTAM UDAY CHANDE |
| Engineer | SWANIL JADHAV |
| Chartered Accountant | J B Patel & Associates |
| Chartered Accountant | RSL & CO. |
| Partner | Role in project |
|---|---|
| DILIP SHRINIWAS HATE | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 838/2013 | CITY CIVIL COURT MUMBAI | HEARING |
| 674/2015 | HIGH COURT MUMBAI | HEARING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2027
Documents filed183
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 183 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Shree sai mauli - Q4 - Form 1.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Shree sai mauli - Q4 - Form 2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Shree Sai Mauli -Q4- Form 3 .pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Q3 FORM-1.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: Q3 FORM-2.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3_Shree Sai Mauli_December 2025_Scanned.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: ARCHITECTS_CERTIFICATE__FORM_1_.pdf | 13 Dec 2025 |
| Withdrawal Update Form 1File: ARCHITECTS_CERTIFICATE__FORM_1_.pdf | 13 Dec 2025 |
| Withdrawal Update Form 2File: ENGINEER_S_CERTIFICATE.pdf | 13 Dec 2025 |
| Withdrawal Update Form 2File: ENGINEER_S_CERTIFICATE.pdf | 13 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3_Sept 25.pdf | 13 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3_Sept 25.pdf | 13 Dec 2025 |
| Withdrawal Update Form 1File: ARCHITECTS_CERTIFICATE__FORM_1_.pdf | 9 Dec 2025 |
| Withdrawal Update Form 2File: ENGINEER_S_CERTIFICATE.pdf | 9 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3_Sept 25.pdf | 9 Dec 2025 |
| Form 5 (FY 2024-2025)File: Shree Sai Mauli_Form 5_FY 2024-25.pdf | 31 Oct 2025 |
| Form 1File: Form 1 - Dec 24.pdf | 9 Sep 2025 |
| Form 2File: Form 2 - Dec 24.pdf | 9 Sep 2025 |
| Form 3File: FORM 3.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked - Dec 24.pdf | 9 Sep 2025 |
| Form 1File: ARCHITECT'S CERTIFICATE.pdf | 9 Sep 2025 |
| Form 2File: ENGINEER'S CERTIFICATE.pdf | 9 Sep 2025 |
| Form 3File: Form 3.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf | 9 Sep 2025 |
| Form 1File: Form 1.pdf | 9 Sep 2025 |
| Form 2File: ENGINEER'S CERTIFICATE Form 2.pdf | 9 Sep 2025 |
| Form 3File: Form 3.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE_compressed.pdf | 9 Sep 2025 |
| Form 1File: Form 1.pdf | 9 Sep 2025 |
| Form 2File: form 2.pdf | 9 Sep 2025 |
| Form 3File: Form 3 Shree Sai Mauli.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE_OF_SOLD_31-03-25.pdf | 9 Sep 2025 |
| Form 1File: Form 1.pdf | 9 Sep 2025 |
| Form 2File: Form 2.pdf | 9 Sep 2025 |
| Form 3File: Form 3 Sep 2024.pdf | 9 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf | 9 Sep 2025 |
| Form 2A (FY 2024-2025)File: SWAPNIL_JADHAV.pdf | 14 Aug 2025 |
| Certificates of CA (Form 3)File: Form 3 Shree Sai Mauli.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Booked March 25.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold book.pdf | 18 Apr 2025 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec 24.pdf | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Booked - Dec 24.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Sep 2024.pdf | 24 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shree sai mauli (skylark Build)- FY 23-24.pdf | 24 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 18 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 15 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 15 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A skylark.pdf | 15 Oct 2024 |
| Copy of the legal title reportFile: TITLE CERTIFICATE.pdf | 29 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC UPTO 18TH FLOOR.pdf | 29 Jul 2024 |
| OtherFile: MHADA NOC.pdf | 29 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.pdf | 17 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf | 17 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 skylark_compressed.pdf | 17 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Revalidation_Letter.pdf | 3 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE Form 2.pdf | 17 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 15 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf | 15 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE_compressed.pdf | 15 Apr 2024 |
| Building plan approvalFile: Plan-compressed.pdf | 29 Mar 2024 |
| Building Plan Approval (IOD)File: Plan-compressed.pdf | 29 Mar 2024 |
| Layout approvalFile: 1.pdf | 28 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 28 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 28 Mar 2024 |
| Certificates of CA (Form 3)File: Final Form 3.pdf | 28 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD- BOOKED INVENTORY final.pdf | 17 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE SIGNED.pdf | 11 Jan 2024 |
| Certificates of CA (Form 3)File: SELF- DECLARATION OF WITHDRAWAL LIMIT.pdf | 11 Jan 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 18 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A Seperate Bank Account details.pdf | 18 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Site Supervisor's Certificate.pdf | 7 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf | 15 Nov 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE SAI GODAVARI | NASHIK | 8 | Completed | Jul 2017 | May 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 183 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE SAI MAULI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mahim -west
Filed coordinates, straight-line distance. 60 registered projects within 2 km.
Island Cove
LH Residential Housing Private Limited
Midtown Bay
Rising Sun Impex Private Limited
Island Cove Tower 4
LH Residential Housing Private Limited, Sh
Bayline Residences
HRUB Infra Projects Pvt Ltd
VITALIS
SURAJ ESTATE DEVELOPERS LTD
Suraj One Business Bay
ICONIC PROPERTY DEVELOPERS PVT LTD
Builder: DILIP SHRINIWAS HATE
DILIP SHRINIWAS HATE has 1 registration on MahaRERA, including SHREE SAI MAULI. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if SHREE SAI MAULI is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE SAI MAULI?
The registered promoter entity is DILIP SHRINIWAS HATE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE SAI MAULI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE SAI MAULI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE SAI MAULI?
The professionals named in the filing: Architect: SMT SUMEDHA GORE; Engineer: GAUTAM UDAY CHANDE; Engineer: SWANIL JADHAV; Chartered Accountant: J B Patel & Associates; Chartered Accountant: RSL & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE SAI MAULI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback