ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Shree Saai Forrtune

Registered No litigation declared Others project

Shree Saai Forrtune

By Mrunali Realty LLP

RG-MH-89659 · RERA P52100047346 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 45.00 crore secured on the land, in favour of SMFG India Home Finance Company Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
12 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
103 of 281Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 225 documents Report an error

Shree Saai Forrtune is a Others project by Mrunali Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100047346 on 20 Oct 2022. Possession is promised by 30 Dec 2027. The completion date has moved by 12 months from the original filing. 178 of the 281 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameShree Saai Forrtune
  • TypeOthers
  • Location
    • Moshi
    • Gat No 49P 50/1 P
    • Haveli
    • Pune
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047346
  • ReraGenie IDRG-MH-89659

Builder

  • NameMrunali Realty LLP
  • Entity typeOthers
  • PartnersMr Lalitkumar Sohanlal Jain Jain, Mr Rahul Hiraral Bhandari Hiralal Bhandari
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2022First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Oct 2022
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2026)
  • Buildings3 building records
  • Documents filed225 files

Current status

63%178 of 281 units booked
57.3%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA141212617143
B BuildingNA14111060106
C BuildingNA6503232

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

A Building85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
B Building38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1077

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,077
Closed/Covered1,077
BuildingClosed/CoveredTotal
A Building776776
B Building273273
C Building2828

Land and ownership6

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,997 sq m
Land owned byNot the promoter
Named landowners6
Encumbrance on the landDeclared present
Charge in favour ofSMFG India Home Finance Company Limited
Secured amountRs 45.00 crore
CERSAI search filedYes
Declared on28 Nov 2025
LandownerVillageDistrict
Mr Vinayak Mahadeo RaskarPethPune
Mr Vishwanath Mahadeo RaskarPethPune
Mr Aditya Nathu ShindeMoshiPune
Mr Rahul Hiraram BankarPimpri Chinchawad (M Corp.)Pune
Mr Navnath Narayan BorateMoshiPune
Mr Raju Narayan BorateMoshiPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI26696.44
Proposed, not sanctioned26,696 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhosari Pune
Estimated costRs 89.76 cr
Cost incurredRs 51.45 cr
Work done57.33%
BuildingWingEstimatedIncurred
A BuildingNARs 44.69 crRs 38.19 cr
B BuildingNARs 33.91 crRs 11.42 cr
-NARs 5.91 cr-
C BuildingNARs 5.25 crRs 1.85 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Sandeep Khatpe Khatpe
EngineerMr Rahul Bhandari Bhandari
Chartered AccountantM s Rinkesh Gupta and Associates
Chartered AccountantAzam Mulani and Associates
PartnerRole in project
Mrunali Realty LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024558Dec 2026 → Dec 2027

Reason as filed by the promoterDue to adding new building as per plan

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed225

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 225 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 1 plan(1).pdf22 Apr 2026
Building plan approvalFile: 2 plan (1).pdf22 Apr 2026
Building plan approvalFile: 3 plan (1).pdf22 Apr 2026
Building plan approvalFile: Sheet 10.pdf22 Apr 2026
Building plan approvalFile: Sheet 11.pdf22 Apr 2026
Building plan approvalFile: Sheet 13.pdf22 Apr 2026
Building plan approvalFile: Sheet 12.pdf22 Apr 2026
Building plan approvalFile: Sheet 14.pdf22 Apr 2026
Building plan approvalFile: Sheet 26.pdf22 Apr 2026
Building plan approvalFile: Sheet 15.pdf22 Apr 2026
Building plan approvalFile: Sheet 15.pdf22 Apr 2026
Building plan approvalFile: Sheet 25.pdf22 Apr 2026
Building plan approvalFile: Sheet 27.pdf22 Apr 2026
Building plan approvalFile: Sheet 23.pdf22 Apr 2026
Building plan approvalFile: Sheet 22.pdf22 Apr 2026
Building plan approvalFile: Sheet 23.pdf22 Apr 2026
Commencement certificateFile: Commencement_compressed (1).pdf22 Apr 2026
Building plan approvalFile: Sheet 21.pdf22 Apr 2026
Building plan approvalFile: Sheet 19.pdf22 Apr 2026
Building plan approvalFile: Sheet 18.pdf22 Apr 2026
Building plan approvalFile: Sheet 20.pdf22 Apr 2026
Building plan approvalFile: Sheet 07.pdf22 Apr 2026
Building plan approvalFile: Sheet 06.pdf22 Apr 2026
Building plan approvalFile: Sheet 08.pdf22 Apr 2026
Withdrawal Update Form 1File: FORM 1 (1).pdf22 Apr 2026
Withdrawal Update Form 2File: FORM 2 (2).pdf22 Apr 2026
Withdrawal Update Form 3File: Rera form 3 Mrunali Realty LLP (1).pdf22 Apr 2026
Layout approvalFile: 1 plan (1).pdf3 Apr 2026
Commencement certificateFile: Commencement_compressed.pdf3 Apr 2026
Withdrawal Update Form 1File: Architect Certificate _1_ (1).pdf3 Apr 2026
Withdrawal Update Form 1File: Architect Certificate _1_ (1).pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2 (1) (1).pdf3 Apr 2026
Withdrawal Update Form 2File: FORM 2 (1) (1).pdf3 Apr 2026
Withdrawal Update Form 3File: Rera form 3 Mrunali Realty LLP (1).pdf3 Apr 2026
Withdrawal Update Form 3File: Rera form 3 Mrunali Realty LLP (1).pdf3 Apr 2026
Layout approvalFile: 1 (1).pdf17 Mar 2026
Building plan approvalFile: 2 (1).pdf17 Mar 2026
Building plan approvalFile: Sheet 1_compressed.pdf17 Mar 2026
Building plan approvalFile: SHEET 06.pdf17 Mar 2026
Withdrawal Update Form 1File: Architect Certificate _1_ (1).pdf17 Mar 2026
Withdrawal Update Form 2File: FORM 2 (1) (1).pdf17 Mar 2026
Withdrawal Update Form 3File: Rera form 3 Mrunali Realty LLP (1).pdf17 Mar 2026
Withdrawal Update Form 1File: Architect Certificate (1) (1).pdf26 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf26 Feb 2026
Withdrawal Update Form 3File: Rinkesh Gupta & Associates-F3 (2).pdf26 Feb 2026
Layout approvalFile: 1 (2).pdf1 Dec 2025
Building plan approvalFile: 2 (6).pdf1 Dec 2025
Building plan approvalFile: 3 (3).pdf1 Dec 2025
Building plan approvalFile: 4.pdf1 Dec 2025
Building plan approvalFile: 5 (65).pdf1 Dec 2025
Building plan approvalFile: 7.pdf1 Dec 2025
Building plan approvalFile: 7.pdf1 Dec 2025
Building plan approvalFile: 8.pdf1 Dec 2025
Building plan approvalFile: 9.pdf1 Dec 2025
Building plan approvalFile: 10 (1).pdf1 Dec 2025
Building plan approvalFile: SHEET 23.pdf1 Dec 2025
Building plan approvalFile: SHEET 25.pdf1 Dec 2025
Building plan approvalFile: SHEET 26.pdf1 Dec 2025
Building plan approvalFile: SHEET 27.pdf1 Dec 2025
Building plan approvalFile: SHEET 18.pdf1 Dec 2025
Building plan approvalFile: SHEET 12.pdf1 Dec 2025
Building plan approvalFile: SHEET 14.pdf1 Dec 2025
Layout approvalFile: SHEET 01.pdf30 Jul 2025
Building plan approvalFile: SHEET 02.pdf30 Jul 2025
Building plan approvalFile: SHEET 04.pdf30 Jul 2025
Building plan approvalFile: SHEET 05.pdf30 Jul 2025
Form 2File: FORM 2 (4).pdf24 Jul 2025
Form 1File: Architect Certificate_work Completion_compressed (1).pdf24 Jul 2025
Form 3File: Mrunali Realty LLP form 3 Q1_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD (3).pdf24 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 CA Certificate on Project Cost Fund withdrawal (Form 3) (1).pdf20 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold-Mrunali 1.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (6) (1).pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: mrunali form 3.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (4).pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD (3).pdf23 Apr 2025
Layout approvalFile: 1_compressed (2).pdf29 Jan 2025
Layout approvalFile: 1_compressed (2).pdf29 Jan 2025
Layout approvalFile: 1_compressed (2).pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (3).pdf29 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sai HiraMoshi Pune123CompletedDec 2019Dec 2019

How this compares with Pune

63%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shree Saai Forrtune on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gat No 49P 50/1 P13,700+ in Pune

2 kmShree Saai ForrtuneCompleted 77Lapsed / revoked 40Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: Mrunali Realty LLP

MRUNALI REALTY LLP has 3 registrations on MahaRERA, including Sai Hira and K11. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shree Saai Forrtune is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Saai Forrtune?

The registered promoter entity is Mrunali Realty LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Saai Forrtune?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Saai Forrtune?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Saai Forrtune?

The professionals named in the filing: Architect: Ar Sandeep Khatpe Khatpe; Engineer: Mr Rahul Bhandari Bhandari; Chartered Accountant: M s Rinkesh Gupta and Associates; Chartered Accountant: Azam Mulani and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Saai Forrtune?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Saai Forrtune. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Saai Forrtune to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.