Home / Browse projects / Palghar, Maharashtra / SHREE RAM KRISHNA TOWER

Registered No litigation declared Residential / Group Housing project

SHREE RAM KRISHNA TOWER

By SHEETAL BUILDERS AND DEVELOPERS

RG-MH-19343 · RERA P99000078472 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 30%
126 of 126Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

SHREE RAM KRISHNA TOWER is a Residential / Group Housing project by SHEETAL BUILDERS AND DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000078472 on 17 Dec 2024. Possession is promised by 31 Dec 2029. 0 of the 126 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE RAM KRISHNA TOWER
  • TypeResidential / Group Housing
  • Location
    • TULINJ ROAD
    • TULINJ
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401209
  • Pincode401209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000078472
  • ReraGenie IDRG-MH-19343

Builder

  • NameSHEETAL BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnerPANKAJ SINGH
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredDec 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Dec 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed106 files

Current status

0%0 of 126 units booked
31.7%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE RAM KRISHNA TOWER BUILDING NO 2, A AND B WINGNA17171260126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 30%.

SHREE RAM KRISHNA TOWER BUILDING NO 2, A AND B WING: 30% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered1
Open Space116

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area590 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
MAHIMA SHIVPRASAD PANDEYMumbai CityMumbai City
RAJESH HAUSILAPRASAD PANDEYMumbai CityMumbai City
SUSHILADEVI MATAPRASAD PANDEYMumbai CityMumbai City
SANTOSH HAUSILAPRASAD PANDEYMumbai CityMumbai City
SANJAY HAUSILAPRASAD PANDEYMumbai CityMumbai City
RAMADEVI P TIWARIMumbai CityMumbai City
NAVNEET ASSOCIATESVasai-Virar City (M Corp)Palghar
POOJA RAHUL TIWARIMumbai CityMumbai City
VANDANA KAMLESH DUBEYMumbai CityMumbai City
RUPALI SHIVPRASAD PANDEYMumbai CityMumbai City
SURAJ SHIVPRASAD PANDEYMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityVasai-Virar Municipal Corporation
Permissible FSI5838.79
Proposed, not sanctioned5,839 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFRENCY ARCADE,SAMELPADA,UMRALE,POST:SOPARA, NALLASOPARA(W), TAL:VASAI, 401 203
Estimated costRs 21.16 cr
Cost incurredRs 6.71 cr
Work done31.68%
BuildingWingEstimatedIncurred
SHREE RAM KRISHNA TOWER BUILDING NO 2, A AND B WINGNARs 18.63 crRs 6.71 cr
-NARs 2.54 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEN CON PROJECT CONSULTANT AND STRUCTURAL WORKS
EngineerSHIPLEKHA ASSOCIATES
EngineerAZHARUDDIN NIZAMUDDIN GOAD
EngineerJatin V Patil
Chartered AccountantR D LUKAD
Chartered AccountantRD LUKAD
PartnerRole in project
SHEETAL BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: sheetal 2a 24-25 (2).pdf30 Jun 2026
Form 2A (FY 2025-2026)File: 2A sheetal bhuilders (1).pdf30 Jun 2026
Form 5 (FY 2025-2026)File: SHETAL BUILDERS AND DEV 25-26.pdf11 Jun 2026
Withdrawal Update Form 1File: form 1 q4.pdf8 Jun 2026
Withdrawal Update Form 2File: 25 Qtr3.pdf8 Jun 2026
Withdrawal Update Form 3File: sheetal builders Form 3.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1 -A and B Wing.pdf13 May 2026
Withdrawal Update Form 1File: 25 Qtr3 (1).pdf13 May 2026
Withdrawal Update Form 1File: 25 Qtr3 (1).pdf13 May 2026
Withdrawal Update Form 1File: 25 Qtr3 (1).pdf13 May 2026
Withdrawal Update Form 2File: 25 Qtr3.pdf13 May 2026
Withdrawal Update Form 2File: 25 Qtr3.pdf13 May 2026
Withdrawal Update Form 2File: 25 Qtr3.pdf13 May 2026
Withdrawal Update Form 2File: 25 Qtr3.pdf13 May 2026
Withdrawal Update Form 3File: sheetal builders Form 3 11 .pdf13 May 2026
Withdrawal Update Form 3File: sheetal builders Form 3 11 .pdf13 May 2026
Withdrawal Update Form 3File: sheetal builders Form 3.pdf13 May 2026
Withdrawal Update Form 3File: sheetal builders Form 3.pdf13 May 2026
Form 5 (FY 2024-2025)File: sheetal from 5 24-25.pdf11 May 2026
Withdrawal Update Form 1File: Form 1 -A and B Wing.pdf29 Dec 2025
Withdrawal Update Form 2File: Form 2 a and b.pdf29 Dec 2025
Withdrawal Update Form 3File: CA FORM 3.pdf29 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wing a b.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: wing ab shilp.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JAN-MAR 25_0001.pdf3 May 2025
Building plan approvalFile: 0070037_11zon.pdf4 Apr 2025
Building plan approvalFile: 0070036_11zon.pdf4 Apr 2025
Building plan approvalFile: 0070034_11zon.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 0070037_11zon.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 0070036_11zon.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 0070034_11zon.pdf4 Apr 2025
Other - TechnicalFile: WingA.pdf4 Apr 2025
Other - TechnicalFile: WingB.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: En Con Arch 2.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 AB.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf11 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf11 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf11 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf11 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf11 Dec 2024
Other - FinanceFile: Sheetal letter head.pdf6 Dec 2024
Other - FinanceFile: Sheetal letter head.pdf6 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: promoter bank.pdf4 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: img20241127_19185824.pdf4 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: promoter bank.pdf4 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: img20241127_19185824.pdf4 Dec 2024
Proforma of Agreement for saleFile: SHEETAL DRAFT AGREEMENT.pdf15 Nov 2024
Proforma of Agreement for saleFile: SHEETAL DRAFT AGREEMENT.pdf15 Nov 2024
Other - LegalFile: Finance Encumbrance_page-0001.pdf14 Nov 2024
Other - FinanceFile: Lndowner Flat-A and B Wing.pdf14 Nov 2024
Other - FinanceFile: Power Of attorny New Dp_compressed (1).pdf14 Nov 2024
Other - LegalFile: Finance Encumbrance_page-0001.pdf14 Nov 2024
Other - FinanceFile: Lndowner Flat-A and B Wing.pdf14 Nov 2024
Other - FinanceFile: Power Of attorny New Dp_compressed (1).pdf14 Nov 2024
Building plan approvalFile: Bldg-2.pdf26 Oct 2024
Building plan approvalFile: Bldg-1_11zon.pdf26 Oct 2024
Layout approvalFile: Layout_11zon.pdf26 Oct 2024
Building plan approvalFile: Bldg-2.pdf26 Oct 2024
Building plan approvalFile: Bldg-1_11zon.pdf26 Oct 2024
Layout approvalFile: Layout_11zon.pdf26 Oct 2024
PAN CardFile: Pan Card SBD.pdf26 Oct 2024
Copy of the legal title reportFile: Title - Shree Krishna Tower_11zon.pdf26 Oct 2024
Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf26 Oct 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf26 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout_11zon.pdf26 Oct 2024
Proforma of Allotment letterFile: Allotment Letter.pdf26 Oct 2024
Declaration in FORM BFile: form b pankaj singh.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -A and B Wing.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 a and b.pdf26 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_11zon.pdf26 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg-1_11zon.pdf26 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg-2.pdf26 Oct 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf26 Oct 2024
CERSAI detailsFile: cerasi.pdf26 Oct 2024
Deviation Report with respect to Allotment letterFile: Daviation rera agreement.pdf26 Oct 2024
Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf26 Oct 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf26 Oct 2024
Other - TechnicalFile: Declaration Cum Undertaking-Anx A.pdf26 Oct 2024

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE RAM KRISHNA TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TULINJ3,200+ in Palghar

2 kmSHREE RAM KRISHNA TOWERCompleted 50Lapsed / revoked 37Other 87Dot size: filed unitsN

Filed coordinates, straight-line distance. 174 registered projects within 2 km.

Builder: SHEETAL BUILDERS AND DEVELOPERS

SHEETAL BUILDERS AND DEVELOPERS has 3 registrations on MahaRERA, including TULSI APARTMENT and SHREE RAM KRISHNA TOWER C WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHREE RAM KRISHNA TOWER is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE RAM KRISHNA TOWER?

The registered promoter entity is SHEETAL BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE RAM KRISHNA TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE RAM KRISHNA TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE RAM KRISHNA TOWER?

The professionals named in the filing: Architect: EN CON PROJECT CONSULTANT AND STRUCTURAL WORKS; Engineer: SHIPLEKHA ASSOCIATES; Engineer: AZHARUDDIN NIZAMUDDIN GOAD; Engineer: Jatin V Patil; Chartered Accountant: R D LUKAD; Chartered Accountant: RD LUKAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE RAM KRISHNA TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE RAM KRISHNA TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE RAM KRISHNA TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.