SHREE OMKAR RESIDENCY

By VIKAS LAXMAN CHAUDHARY

RG-MH-58483 · RERA P51500033245 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 68%
5 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

SHREE OMKAR RESIDENCY is a Residential / Group Housing project by VIKAS LAXMAN CHAUDHARY in Aurangabad, Maharashtra, registered with MahaRERA as P51500033245 on 9 Feb 2022. Possession is promised by 30 Dec 2026. 5 of the 10 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE OMKAR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • PLOT NO.30
    • C.T.S NO.12433
    • SURANA NAGAR
    • AURANGABAD
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500033245
  • ReraGenie IDRG-MH-58483

Builder

  • NameVIKAS LAXMAN CHAUDHARY
  • Entity typeIndividual
  • Other registrations13 more →
  • Completed5 of 14
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

this monthRegisteredFeb 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Feb 2022
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

50%5 of 10 units booked

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE OMKAR RESIDENCYNA6610010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 68%.

SHREE OMKAR RESIDENCY: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area388 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
ANIKET MADHUKAR RAJHANSAurangabad (M Corp.)Aurangabad
ABHAY MADHUKAR RAJHANSAurangabad (M Corp.)Aurangabad
PRITEE ATUL RAJHANSAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation
Permissible FSI944.61
Proposed, not sanctioned945 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch6,ANNAPURNA TOWER, KUSHAL NAGAR, ADALAT ROAD, AURANGABAD, MAHARASHTRA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH KALE & ASSOCIATES
EngineerMANISH KALE & ASSOCIATES
Chartered AccountantYASH NAGAR
PartnerRole in project
VIKAS LAXMAN CHAUDHARY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: F-1 ARCHITECT CERTIFICATE.pdf1 Jun 2026
Form 2File: F-2 ENGINEER CERTIFICATE.pdf1 Jun 2026
Form 3File: FORM-3 CA CERTIFICATE.pdf1 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 2025-26 Q4.pdf1 Jun 2026
Form 1File: Form 1 2025-26 Q1.pdf1 Apr 2026
Form 2File: Form 2 2025-26 Q1.pdf1 Apr 2026
Form 3File: Form 3 2025-26 Q1 Shree Omkara Residency.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 2025-26 Q1.pdf1 Apr 2026
Form 1File: Form 1 2025-26 Q2.pdf1 Apr 2026
Form 2File: Form 2 2025-26 Q2.pdf1 Apr 2026
Form 3File: Form 3 2025-26 Q2 Shree Omkara Residency.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 2025-26 Q2.pdf1 Apr 2026
Form 1File: Form 1 2025-26 Q3.pdf1 Apr 2026
Form 2File: Form 2 2025-26 Q3.pdf1 Apr 2026
Form 3File: Form 3 2025-26 Q3 Shree Omkara Residency.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 2025-26 Q3.pdf1 Apr 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q3.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q2.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q2.pdf26 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q1.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q1.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q1.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F-1 ARCHITECT CERTIFICATE.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F-1 ARCHITECT CERTIFICATE.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F-1 ARCHITECT CERTIFICATE.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F-1 ARCHITECT CERTIFICATE.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-2 ENGINEER CERTIFICATE.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-2 ENGINEER CERTIFICATE.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-2 ENGINEER CERTIFICATE.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-2 ENGINEER CERTIFCATE.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: F-2A ENGINEER CERTIFICATE.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: S0LD N BOOKED INVENTORY.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD N BOOKED INVENTORY.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD N BOOKED INVENTORY.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD N BOOKED INVENTORY.pdf18 Apr 2024
Details of encumbrances concerned to FinanceFile: Encrabance Leagal.pdf10 Apr 2023
Details of encumbrances concerned to FinanceFile: Encrabance Leagal.pdf10 Apr 2023
Details of encumbrances concerned to LegalFile: Encrabance Leagal.pdf10 Apr 2023
Details of encumbrances concerned to LegalFile: Encrabance Leagal.pdf10 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank.pdf10 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf10 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Aggremnt.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F-1 ARCH CERTIFICATE.pdf24 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F-1 ARCH CERTIFICATE.pdf24 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-2 ENG CERTIFICATE.pdf24 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-2 ENG CERTIFICATE_page-0001 -1111 (1).pdf24 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: F-2A ENG CERTFICATE.pdf24 Feb 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf24 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_.pdf24 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Omkar Residency.pdf24 Feb 2023
Proforma of Allotment letterFile: AGREEMENT TO SALE SHREE OMKAR RESIDENCY RERA-converted.pdf8 Jan 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf20 Dec 2021
CERSAI detailsFile: Asset Based Search.pdf20 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Dec 2021
Proforma of Allotment letterFile: proforma_allotment_letter.pdf14 Dec 2021
Declaration in FORM BFile: Form B -Developer.pdf13 Dec 2021
Layout approvalFile: LAYOUT.pdf11 Dec 2021
Building plan approvalFile: Block Plan0297_compressed-compressed.pdf11 Dec 2021
PAN CardFile: Pan.pdf11 Dec 2021
Copy of the legal title reportFile: LEGAL1.pdf11 Dec 2021
Details of encumbrancesFile: ENCRABANCE.pdf11 Dec 2021
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf11 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Block Plan0297_compressed-compressed.pdf11 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT.pdf11 Dec 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHREE OMKAR RESIDENCYPLOT NO. 30 C.T.S NO. 12433 SURANA NAGAR AURANGABAD 4310011OngoingDec 2026Dec 2026
SNEH MANJIRIPLOT NO. 09 CTS NO 17822 SANMITRA COLONY CHHATRAPATI SAMBHAJI NAGAR AURANGABAD 4310011OngoingJan 2023Late, Jan 2027

How this compares with Aurangabad

50%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SHREE OMKAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SURANA NAGAR, AURANGABAD1,400+ in Aurangabad

2 kmSHREE OMKAR RESIDENCYCompleted 38Lapsed / revoked 27Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: VIKAS LAXMAN CHAUDHARY

VIKAS LAXMAN CHAUDHARY has 14 registrations on MahaRERA, including SAI ASPIRE and SILVER PEARLSS. Its filings disclose 11 earlier MahaRERA projects: declares 10 of 11 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SHREE OMKAR RESIDENCY is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE OMKAR RESIDENCY?

The registered promoter entity is VIKAS LAXMAN CHAUDHARY, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE OMKAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE OMKAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE OMKAR RESIDENCY?

The professionals named in the filing: Architect: MANISH KALE & ASSOCIATES; Engineer: MANISH KALE & ASSOCIATES; Chartered Accountant: YASH NAGAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE OMKAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE OMKAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE OMKAR RESIDENCY to a free account