Home / Browse projects / Thane, Maharashtra / SHREE MAULI PRABHA

Registration lapsed No litigation declared Residential / Group Housing project

SHREE MAULI PRABHA

By SHREE PRABHA CONSTRUCTION

RG-MH-29905 · RERA P51700029414 · Last updated on MahaRERA portal: 13 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 24 months past the filed date
  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2024Possession promised24 months past this date
8 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

SHREE MAULI PRABHA is a Residential / Group Housing project by SHREE PRABHA CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700029414 on 29 May 2021. Possession was promised by 31 Oct 2024 and is now 24 months past that date. The completion date has moved by 3 months from the original filing.

At a glance

Project

  • NameSHREE MAULI PRABHA
  • TypeResidential / Group Housing
  • Location
    • TANDON CROSS ROAD
    • RAM NAGAR
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700029414
  • ReraGenie IDRG-MH-29905

Builder

  • NameSHREE PRABHA CONSTRUCTION
  • Entity typePartnership
  • GSTIN27ADDFS8351C1Z3
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersVIHANG DILIP PUSALKAR, MANDAR SHRIKANT HALBE
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

24 months past promisethis monthRegisteredMay 2021First promiseJul 2024Revised toOct 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 May 2021
  • Promised completion31 Oct 2024
  • Revised completionRevised to 31 Oct 2024 (originally 31 Jul 2024)
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE MAULI PRABHANA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

SHREE MAULI PRABHA: 93% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area896 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SMITA SITARAM KHANOLKARDOMBIVLIThane
RAJANI KAMLAKAR TIRODKARDOMBIVLIThane

Approvals and building plan

Permissible FSI2948.8
Proposed, not sanctioned2,949 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDOMBIVLI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANAMIKA DATAR
EngineerPANKAJ KULKARNI
Chartered AccountantMANGESH GHANEKAR
PartnerRole in project
SHREE PRABHA CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700023047Jul 2024 → Oct 2024

Reason as filed by the promoterDUE TO NON AVAILABILITY OF MATERIALS IN TIME SUCH AS TILES, GI BALCONY DOOR, WPC BATHROOM DOORS, SOLAR PANELS AND SANITORY FITTINGS.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Dec 2024

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 4 Commencement Certificates _ NA Order for plotted development.pdf13 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MANDAR SIR_241213_132703.pdf13 Dec 2024
Layout approvalFile: Part Competion.pdf12 Dec 2024
Copy of Layout Approval (in case of layout)File: Part Competion.pdf12 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Part Occupancy Certificate.pdf12 Dec 2024
Declaration in FORM BFile: SMP RERA FORM B.pdf28 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SMP RERA Architect certificate June-24.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SMP RERA Engineer certificate June-24.pdf28 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SMP RERA Quality Assurance certificate Jun-24.pdf28 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SMP RERA CA Certificate June-24.pdf28 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SMP Architect certificate June-24.pdf18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SMP Engineer Certificate June-24.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Adobe Scan 18 Jun 2024.pdf18 Jun 2024
Disclosure of sold/ booked inventoryFile: SMP Sold-Unsold Inventory.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Shree Mauli Prabha.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Shree Prabha Constructions_ FY 22-23.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Updation Architect Certificate V (1).pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Updation Engineer Certificate V (1).pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List (2).pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Prabha Constructions (2).pdf29 Jan 2024
Layout approvalFile: SPC SANCTION PLAN.pdf24 Aug 2023
Copy of Layout Approval (in case of layout)File: SPC SANCTION PLAN.pdf24 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: SMP Latest CC.pdf24 Aug 2023
Declaration about Commencement CertificateFile: SPC Rera correction.pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SPC Architect Rera Updation IV.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPC Engineer Rera Updation IV.pdf24 Aug 2023
Layout approvalFile: KDMC Sanction Plan sheets.pdf28 Jun 2023
Copy of Layout Approval (in case of layout)File: KDMC Sanction Plan sheets.pdf28 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: KDMC Sanction Letter II.pdf28 Jun 2023
Declaration about Commencement CertificateFile: Rera Format C 15 foor.pdf28 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_Shree Prabha Constructions_FY 2021-22.pdf9 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Shree Prabha Constructions_FY 2021-22.pdf9 May 2023
Other - LegalFile: Adobe Scan 11 Apr 2023.pdf11 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrance RERA.pdf22 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance RERA.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Rera Update III (1).pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Rera update III (1).pdf22 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Adobe Scan 22 Feb 2023.pdf22 Feb 2023
Disclosure of sold/ booked inventoryFile: Inventory RERA.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Prabha Constructions_compressed.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A RERA.pdf22 Feb 2023
Proforma of Agreement for saleFile: Draft Agreement SPC Updated.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate II.pdf9 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate II.pdf9 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Site engineer certificate II.pdf9 Sep 2022
Disclosure of sold/ booked inventoryFile: sold-unsold Summery II.pdf9 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate II_compressed.pdf9 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account details.pdf9 Sep 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf2 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf2 Jan 2022
CERSAI detailsFile: CERSAI Declaration.pdf2 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf2 Jan 2022
PAN CardFile: PAN Shree Prabha.pdf18 May 2021
Copy of the legal title reportFile: Shree Prabha Construction Title Report.pdf17 May 2021
Details of encumbrancesFile: Encumberance Letter.pdf17 May 2021
Layout approvalFile: sanction plan sheet - 1.pdf14 May 2021
Building plan approvalFile: sanction plan sheet - 1.pdf14 May 2021
Copy of Layout Approval (in case of layout)File: sanction plan sheet - 1.pdf14 May 2021
Building Plan Approval / NA Order for plotted developmentFile: sanction plan sheet - 1.pdf14 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Shree Mauli Prabha comp.pdf14 May 2021
Copy of the legal title reportFile: Title copy.pdf13 May 2021
Details of encumbrancesFile: Title copy.pdf13 May 2021
Commencement Certificates / NA Order for plotted developmentFile: KDMC Sanction Letter-comp.pdf13 May 2021
Declaration in FORM BFile: Developers Affidavit.pdf13 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate comp.pdf13 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: structural certificate comp.pdf13 May 2021
Proforma of Allotment letterFile: Draft Sale Deed and Allotment.pdf13 May 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREE MAULI PRABHACTS NO. 8873 88721CompletedJul 2024Jul 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 3 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE MAULI PRABHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAM NAGAR7,600+ in Thane

2 kmSHREE MAULI PRABHACompleted 39Lapsed / revoked 29Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: SHREE PRABHA CONSTRUCTION

SHREE PRABHA CONSTRUCTION has 3 registrations on MahaRERA, including SHREE MAULI PRABHA and SHREERANG KUTIR. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that SHREE MAULI PRABHA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE MAULI PRABHA is delayed beyond 31 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE MAULI PRABHA?

The registered promoter entity is SHREE PRABHA CONSTRUCTION, a partnership as per the filing. Its GSTIN 27ADDFS8351C1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE MAULI PRABHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE MAULI PRABHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE MAULI PRABHA?

The professionals named in the filing: Architect: ANAMIKA DATAR; Engineer: PANKAJ KULKARNI; Chartered Accountant: MANGESH GHANEKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE MAULI PRABHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE MAULI PRABHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE MAULI PRABHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.