Home / Browse projects / Satara, Maharashtra / Shree Gurumauli Residency
Shree Gurumauli Residency
By M/s. Shree and Gashmir Associates
RG-MH-73806 · RERA P52700051492 · Last updated on MahaRERA portal: 22 Feb 2025
Source: official MahaRERA filing
Red flags
- De-registered
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Gurumauli Residency is a Residential / Group Housing project by M/s. Shree and Gashmir Associates in Satara, Maharashtra, registered with MahaRERA as P52700051492 on 23 Jun 2023. Possession is promised by 10 Nov 2026.
At a glance
Project
- NameShree Gurumauli Residency
- TypeResidential / Group Housing
- Location
- Gat No. 384/A/1A/1
- Plot No. 41
- Shahupuri
- Karanje Tarf Satara (CT)
- Satara
- 415002
- Pincode415002
- RERA no.P52700051492
- ReraGenie IDRG-MH-73806
Builder
- NameM/s. Shree and Gashmir Associates
- Entity typePartnership
- PartnersDhiraj Prataprao Barge, Vinay Balkrishna Bhujbal, Santosh Ashok Satarkar, Madhuri Pravin Gore
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on23 Jun 2023
- Promised completion10 Nov 2026
- Revised completionNone
- Buildings1 building record
- Documents filed55 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shree Gurumauli Residency | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Shree Gurumauli Residency: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership9
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Rajesh Suryakant Suryawanshi | Karanje Tarf Satara (CT) | Satara |
| Sonali Mohan Suryawanshi | Karanje Tarf Satara (CT) | Satara |
| Yash Mohan Suryawanshi | Karanje Peth Satara (CT) | Satara |
| Ansh Mohan Suryawanshi | Karanje Tarf Satara (CT) | Satara |
| Namrata Mohan Suryawanshi | Karanje Tarf Satara (CT) | Satara |
| Nikita Mohan Suryawanshi | Karanje Tarf Satara (CT) | Satara |
| Mahindra Suryakant Suryawanshi | Karanje Tarf Satara (CT) | Satara |
| Gajanan Ramchandra Suryawanshi | Karanje Tarf Satara (CT) | Satara |
| Sunita Ramchandra Suryawanshi | Karanje Tarf Satara (CT) | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shambhuraj Patil |
| Engineer | Alok N Pawar |
| Chartered Accountant | M S Chandan Udhani & Company |
| Partner | Role in project |
|---|---|
| M/s. Shree and Gashmir Associates | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 10 Nov 2026
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate 30 June 2024.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Q2 -24-25.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Q3- 24-25.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Q1 -24-25.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Q2 - 24-25.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q3- 24-25.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate -Q1 - 24-25.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q2 -24-25.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q3-24-25.pdf | 22 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 22 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 uploaded.pdf | 5 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate - Form 1.pdf | 29 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate - Form 1.pdf | 10 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - Q3.pdf | 9 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16-01-24.pdf | 9 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold 16-10.pdf | 9 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 uploaded.pdf | 9 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - Q2.pdf | 8 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-7-23.pdf | 8 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 - Engineer's Certificate.pdf | 8 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 8 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold - Unsold.pdf | 8 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 uploaded_compressed.pdf | 8 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 uploaded.pdf | 8 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architectural certificate 10-7.pdf | 7 Mar 2024 |
| Copy of the legal title reportFile: Legal Title Report with Challan.pdf | 7 Jun 2023 |
| Proforma of Agreement for saleFile: 25 04 2023.pdf | 8 May 2023 |
| Layout approvalFile: Layout.pdf | 21 Feb 2023 |
| Building plan approvalFile: TYP FLOOR PLAN.pdf | 21 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: no financial encumbarance certificate.pdf | 21 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance Report.pdf | 21 Feb 2023 |
| Details of encumbrances concerned to LegalFile: no financial encumbarance certificate.pdf | 21 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance Report.pdf | 21 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 21 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: TYP FLOOR PLAN.pdf | 21 Feb 2023 |
| Declaration about Commencement CertificateFile: format D.pdf | 21 Feb 2023 |
| CERSAI detailsFile: No Security Interest Charged.pdf | 21 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Madhuri.pdf | 21 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Santosh.pdf | 21 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Vinay.pdf | 21 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Dhiraj Sign.pdf | 21 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Shambhuraj Patil Sign.pdf | 21 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Formate A_merged.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 27 Jan 2023 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 26 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation for allotment letter.pdf | 26 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation for Agreement for sale.pdf | 26 Dec 2022 |
| Declaration in FORM BFile: Form B.pdf | 11 Nov 2022 |
| Building plan approvalFile: Layout.pdf | 10 Nov 2022 |
| PAN CardFile: Firm PAN Card.pdf | 10 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout.pdf | 10 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: बांधकाम परवाना.pdf | 10 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- All 55 filed documents as one ZIP, foldered, with a manifest
Keep Shree Gurumauli Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shahupuri1,100+ in Satara
Sukhodayam Villas
M/s Ultra Urban Greene Realty LLP
YASHWANT ELITE
RAHULDEV PROMOTERS SATARA
KRISHNAKUNJ VIHAR PHASE-3
Pooja Shridhar Kangralkar
SHATAKSHI TOWER
VISHAL DILIP PAWAR
SHREE VIHAR
M/s SHREE SAIDARSHAN DEVELOPERS
SHIVSAMARTH RESIDENCY
MS BHOSALE AND NALAWADE
See every Satara project, with the district possession charts
Builder: M/s. Shree and Gashmir Associates
M/s. Shree and Gashmir Associates has 1 registration on MahaRERA, including Shree Gurumauli Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What does it mean that Shree Gurumauli Residency shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Shree Gurumauli Residency is delayed beyond 10 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Gurumauli Residency?
The registered promoter entity is M/s. Shree and Gashmir Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Gurumauli Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree Gurumauli Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Gurumauli Residency?
The professionals named in the filing: Architect: Shambhuraj Patil; Engineer: Alok N Pawar; Chartered Accountant: M S Chandan Udhani & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Gurumauli Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback