SHREE VIHAR
By M/s SHREE SAIDARSHAN DEVELOPERS
RG-MH-17515 · RERA P52700029745 · Last updated on MahaRERA portal: 2 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 16 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE VIHAR is a Residential / Group Housing project by M/s SHREE SAIDARSHAN DEVELOPERS in Satara, Maharashtra, registered with MahaRERA as P52700029745 on 29 Jun 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 16 months from the original filing. 33 of the 78 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.
At a glance
Project
- NameSHREE VIHAR
- TypeResidential / Group Housing
- Location
- -
- KARANGE
- Karanje Tarf Satara (CT)
- Satara
- 415002
- Pincode415002
- RERA no.P52700029745
- ReraGenie IDRG-MH-17515
Builder
- NameM/s SHREE SAIDARSHAN DEVELOPERS
- Entity typePartnership
- PartnersJANARDHAN KASHIRAM MANE, SANTOSH ASHOK SATARKAR, GANESH BALIRAM GUJAR, MUKESH BALASAHEB MAHAMULKAR, SAGAR CHANDRAKANT GOLE, DARSHANA VISHAL BHOSALE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Jun 2021
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 30 Nov 2025)
- Buildings2 building records
- Documents filed61 files
Current status
Figures as on 2 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A AND B | NA | 7 | 6 | 48 | 0 | 48 |
| WING C AND D | NA | 5 | 4 | 30 | 0 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 88%.
WING A AND B71%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 88% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING C AND D54%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 72% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHREE VIHAR | Satara | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A AND B | NA | Rs 9.18 cr | Rs 6.00 cr |
| WING C AND D | NA | Rs 9.18 cr | Rs 6.00 cr |
| - | NA | Rs 47.00 lakh | Rs 25.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUMIT SHIVAJI BAGADE |
| Engineer | SHWETA S PATIL |
| Engineer | SHAMBHURAJ PATIL |
| Chartered Accountant | S M RAJHANS AND CO |
| Chartered Accountant | TRIPTI PIMPALKAR |
| Chartered Accountant | shripad durgawade |
| Partner | Role in project |
|---|---|
| M/s SHREE SAIDARSHAN DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 31/03/2027 to complete the project
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jun 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: SHREE VIHAR (1).pdf | 2 May 2026 |
| Withdrawal Update Form 2File: SHREE VIHAR (2).pdf | 2 May 2026 |
| Withdrawal Update Form 3File: SHREE VIHAR.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: ART.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2 | 30 Apr 2026 |
| Withdrawal Update Form 3File: Registration Application Form3-7.pdf | 30 Apr 2026 |
| Form 1File: FORM 1.pdf | 29 Jan 2026 |
| Form 2File: FORM2.pdf | 29 Jan 2026 |
| Form 3File: FORM3.pdf | 29 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SHREE VIHAR SOLD UNSOLD.pdf | 29 Jan 2026 |
| Form 1File: FORM 1_page-0001.pdf | 29 Jan 2026 |
| Form 2File: FORM 2.pdf | 29 Jan 2026 |
| Form 3File: FORM3_page-0001.pdf | 29 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SHREE VIHAR SOLD UNSOLD_page-0001.pdf | 29 Jan 2026 |
| Form 1File: 30032023.pdf | 22 Aug 2025 |
| Form 2File: 30032023.pdf | 22 Aug 2025 |
| Form 3File: FROM NO 3(22-23).pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UN SOLD 1-4-2023 to 31-3-2024.pdf | 22 Aug 2025 |
| Form 1File: 30032024.pdf | 22 Aug 2025 |
| Form 2File: 30032024.pdf | 22 Aug 2025 |
| Form 3File: FROM NO (23-24).pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UN SOLD 1-4-2023 to 31-3-2024.pdf | 22 Aug 2025 |
| Form 1File: 30032025.pdf | 22 Aug 2025 |
| Form 2File: 30032025.pdf | 22 Aug 2025 |
| Form 3File: FROM NO 3 (24-25).pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UN SOLD 1-4-2024 to 31-3-2025.pdf | 22 Aug 2025 |
| Form 1File: 30062025.pdf | 22 Aug 2025 |
| Form 2File: 30062025.pdf | 22 Aug 2025 |
| Form 3File: FROM NO 3(apr25-jun25).pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UN SOLD 1-4-2025 to 30-6-2025.pdf | 22 Aug 2025 |
| Form 2A (FY 2024-2025)File: 0 (24).pdf | 22 Aug 2025 |
| Form 2A (FY 2023-2024)File: 0 (24).pdf | 22 Aug 2025 |
| Form 5 (FY 2024-2025)File: 0 (22).pdf | 22 Aug 2025 |
| Form 5 (FY 2023-2024)File: 0 (23).pdf | 22 Aug 2025 |
| Layout approvalFile: 1-3.pdf | 25 Jun 2021 |
| Layout approvalFile: 2-3.pdf | 25 Jun 2021 |
| Layout approvalFile: 3-3.pdf | 25 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: 1-3.pdf | 25 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: 2-3.pdf | 25 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: 3-3.pdf | 25 Jun 2021 |
| Declaration in FORM BFile: hanumant kirdat.pdf | 25 Jun 2021 |
| Declaration in FORM BFile: siya kirdat.pdf | 25 Jun 2021 |
| Declaration in FORM BFile: maruti kirdat b form.pdf | 25 Jun 2021 |
| Declaration in FORM BFile: vaishali kirdat.pdf | 25 Jun 2021 |
| Declaration in FORM BFile: shrirang.pdf | 25 Jun 2021 |
| Declaration in FORM BFile: PROMOTAR B.pdf | 25 Jun 2021 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 25 Jun 2021 |
| Building plan approvalFile: 2-3.pdf | 24 Jun 2021 |
| Building plan approvalFile: 2-3.pdf | 24 Jun 2021 |
| Building plan approvalFile: 3-3.pdf | 24 Jun 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-3.pdf | 24 Jun 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-3.pdf | 24 Jun 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-3.pdf | 24 Jun 2021 |
| Declaration in FORM BFile: dilip kirdat.pdf | 24 Jun 2021 |
| Proforma of Allotment letterFile: Draft Agreement for Sale.pdf | 24 Jun 2021 |
| Copy of the legal title reportFile: full adv.pdf | 23 Jun 2021 |
| Declaration about Commencement CertificateFile: final comm certif.pdf | 23 Jun 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ART.pdf | 16 Jun 2021 |
| Details of encumbrancesFile: encumbrance.pdf | 15 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf | 15 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: PERMTION.pdf | 14 Jun 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 61 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE VIHAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KARANGE1,100+ in Satara
Sukhodayam Villas
M/s Ultra Urban Greene Realty LLP
YASHWANT ELITE
RAHULDEV PROMOTERS SATARA
KRISHNAKUNJ VIHAR PHASE-3
Pooja Shridhar Kangralkar
SHATAKSHI TOWER
VISHAL DILIP PAWAR
SHIVSAMARTH RESIDENCY
MS BHOSALE AND NALAWADE
SKYVIEW TOWERS
Rajan Namdeo Pore
See every Satara project, with the district possession charts
Builder: M/s SHREE SAIDARSHAN DEVELOPERS
M/s SHREE SAIDARSHAN DEVELOPERS has 1 registration on MahaRERA, including SHREE VIHAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if SHREE VIHAR is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE VIHAR?
The registered promoter entity is M/s SHREE SAIDARSHAN DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE VIHAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE VIHAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE VIHAR?
The professionals named in the filing: Architect: SUMIT SHIVAJI BAGADE; Engineer: SHWETA S PATIL; Engineer: SHAMBHURAJ PATIL; Chartered Accountant: S M RAJHANS AND CO; Chartered Accountant: TRIPTI PIMPALKAR; Chartered Accountant: shripad durgawade. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE VIHAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback