Home / Browse projects / Nashik, Maharashtra / SHREE GANESH UNIVERSE

Completed No litigation declared Commercial project

SHREE GANESH UNIVERSE

By PRAKASH RAMAN CHAUDHARI

RG-MH-14207 · RERA P51600031309 · Last updated on MahaRERA portal: 5 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

SHREE GANESH UNIVERSE is a Commercial project by PRAKASH RAMAN CHAUDHARI in Nashik, Maharashtra, registered with MahaRERA as P51600031309 on 15 Oct 2021. The registration is recorded completed; possession was promised by 3 Oct 2025.

At a glance

Project

  • NameSHREE GANESH UNIVERSE
  • TypeCommercial
  • Location
    • PIPE LINE ROAD
    • OPP. NAKSHATRA LAWNS
    • ANANDWALLI
    • Aanandwali
    • Nashik
    • 422013
  • Pincode422013
  • RERA no.P51600031309
  • ReraGenie IDRG-MH-14207

Builder

  • NamePRAKASH RAMAN CHAUDHARI
  • Entity typeIndividual
  • Other registrations10 more →
  • Completed7 of 11
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredOct 2021PromisedOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Oct 2021
  • Promised completion3 Oct 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE GANESH UNIVERSENA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHREE GANESH UNIVERSE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes1%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Open Space5

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,019 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8741.3
Proposed, not sanctioned6,562 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA-1 2 PRATHAMESH, THATTE NAGAR, GANGAPUR ROAD, NASHIK 422005

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectER ASHOK JAMDAR
EngineerVINIT PRAKASH CHAUDHARI
Chartered AccountantCA AMOL ANIL MISHRA
PartnerRole in project
PRAKASH RAMAN CHAUDHARI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 May 2024

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shree Ganesh Universe - Audit Report 23-24.pdf5 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf3 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate S G Universe - Dec 23.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Mar 24 Universe.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Mar 24 Universe.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Shree Ganesh Universe - DEC 23.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-March 24 Universe.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate S G Universe - Dec 23.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate S G Universe - Dec 23.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate S G Universe - Dec 23.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shree Ganesh Universe.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep 23 Universe.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Certificate S G Universe Sept 23.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Universe Sept 23.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - S G Universe - June 23.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate S G Universe FY 23-24-Q1.pdf23 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate S G Universe FY 23-24 Q1.pdf23 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 23.pdf23 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate universe - Mar'23.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er certificate universe- Mar'23.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Universe Mar'23.pdf22 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate S G Universe 30062022.pdf6 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate S G Universe 30092022.pdf6 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate S G Universe 31122022.pdf6 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SG Universe ER June 22.pdf6 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SG Universe ER Sept 22.pdf6 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SG Universe ER Dec 22 compressed.pdf6 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ganesh Universe June 22 Signed Copy.pdf6 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ganesh Universe Sept 22 Signed Copy.pdf6 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ganesh universe Dec 22 Signed Copy.pdf6 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate - S G Universe - 12-21.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate - S G Universe - 03-22.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Certificate - S G Universe - 12-21.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Certificate - S G Universe - 03-22.pdf28 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree ganesh universe CA.pdf28 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree ganesh Universe CAA.pdf28 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Shree ganesh universe AR.pdf28 Feb 2023
Layout approvalFile: CTS Map.pdf1 Oct 2021
Building plan approvalFile: NA Order.pdf1 Oct 2021
Building plan approvalFile: Building Plan 1-2.pdf1 Oct 2021
Building plan approvalFile: Building Plan 2-2.pdf1 Oct 2021
Layout approvalFile: DILR SN 30.pdf1 Oct 2021
PAN CardFile: Pan Card.pdf1 Oct 2021
Copy of the legal title reportFile: Title Report.pdf1 Oct 2021
Details of encumbrancesFile: Affidavit.pdf1 Oct 2021
Copy of Layout Approval (in case of layout)File: CTS Map.pdf1 Oct 2021
Copy of Layout Approval (in case of layout)File: DILR SN 30.pdf1 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf1 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1-2.pdf1 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2-2.pdf1 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Shree Ganesh Universe.pdf1 Oct 2021
Declaration about Commencement CertificateFile: Declaration.pdf1 Oct 2021
Declaration in FORM BFile: Form B Declaration.pdf1 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SG UNIVERSE.pdf1 Oct 2021
Proforma of Allotment letterFile: Draft Allottment Letter.pdf1 Oct 2021
Proforma of Allotment letterFile: Draft Agreement Of Sale.pdf1 Oct 2021
OtherFile: 7-12 Extract.pdf1 Oct 2021
OtherFile: CTS Extarct.pdf1 Oct 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREE GANESH BLISSPLOT NO. 02 S.NO. 835 1 3 6 2 1 UTTARA NAGAR TAPOVAN ROAD NASHIK28CompletedFeb 2021Oct 2020
GENESISGENESIS ON S.NO. 603-3A CTS NO. 7293-1A FP NO. 140 AS PER TPS II MUMBAI NAKA NASHIK 42200230CompletedAug 2020Jan 2019

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE GANESH UNIVERSE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP. NAKSHATRA LAWNS, ANANDWALLI4,100+ in Nashik

Builder: PRAKASH RAMAN CHAUDHARI

PRAKASH RAMAN CHAUDHARI has 11 registrations on MahaRERA, including SHREE GANESH IMPERIAL and GENESIS. Its filings disclose 9 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHREE GANESH UNIVERSE is delayed beyond 3 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE GANESH UNIVERSE?

The registered promoter entity is PRAKASH RAMAN CHAUDHARI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE GANESH UNIVERSE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE GANESH UNIVERSE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE GANESH UNIVERSE?

The professionals named in the filing: Architect: ER ASHOK JAMDAR; Engineer: VINIT PRAKASH CHAUDHARI; Chartered Accountant: CA AMOL ANIL MISHRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE GANESH UNIVERSE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE GANESH UNIVERSE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE GANESH UNIVERSE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.