Home / Browse projects / Raigarh, Maharashtra / Shree G Square
Shree G Square
RG-MH-66986 · RERA P52000005415 · Last updated on MahaRERA portal: 18 Feb 2023
Source: official MahaRERA filing
Red flags
- Completion date moved by 21 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree G Square is a Others project by RAJESH AMARLAL THAKUR in Raigarh, Maharashtra, registered with MahaRERA as P52000005415 on 11 Aug 2017. The registration is recorded completed; possession was promised by 1 Dec 2019. The completion date has moved by 21 months from the original filing.
At a glance
Project
- NameShree G Square
- TypeOthers
- Location
- Dhamote
- Karjat
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000005415
- ReraGenie IDRG-MH-66986
Builder
- NameRAJESH AMARLAL THAKUR
- Entity typeIndividual
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Aug 2017
- Promised completion1 Dec 2019
- Revised completionRevised to 1 Dec 2019 (originally 1 Mar 2018)
- Buildings2 building records
- Documents filed47 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE G SQUARE | NA | 5 | 0 | 0 | 0 | 0 |
| RAJ LEGACY | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
SHREE G SQUARE100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RAJ LEGACY100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | THE DESIGN INDIA |
| Partner | Role in project |
|---|---|
| RAJESH AMARLAL THAKUR | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTYPOGRAPHICAL ERROR IN COMPLETION DATE. While applying for Registration due to typographical error we have entered completion date for the project as 31st March 2018. As we have started our project in June 2017 and it is impossible to complete such big project on the said date. We have planned to complete the project by 31st Dec 2019. Whereas we have provided the date of completion as 31 Dec 2019, in sale agreement as well.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Feb 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Feb 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Feb 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Jun 2020
Documents filed47
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 18 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 18 Feb 2023 |
| Details of encumbrancesFile: updated Details of encumbrances.pdf | 3 Nov 2021 |
| Declaration about Commencement CertificateFile: rajesh thakur cc.pdf | 16 Jul 2021 |
| Details of encumbrancesFile: sHREE g SQUARE.pdf | 3 Jun 2021 |
| OtherFile: download (2).pdf | 9 Jan 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: Shree g square RERA FORM 4.pdf | 1 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rajesh thakur engineer crt(1).pdf | 27 Jun 2020 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 27 Jun 2020 |
| Certificates of CA (Form 5)File: FDORM 5.pdf | 27 Jun 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FDORM 5.pdf | 27 Jun 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC OF SHREE G SQUARE.pdf | 27 Jun 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT FORM 4.pdf | 27 Jun 2020 |
| OtherFile: ShreeG mall.pdf | 28 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch-certificate-shree-g-square-fEB2019-1-2.pdf | 14 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch-certificate-shree-g-square-fEB2019-3-4.pdf | 14 Feb 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg-certificate-shree-g-square-11-FEB2019-1-2.pdf | 14 Feb 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg-certificate-shree-g-square-11-FEB2019-3-5.pdf | 14 Feb 2019 |
| Certificates of CA (Form 5)File: Certificate CA FORM.pdf | 14 Feb 2019 |
| Proforma of Allotment letterFile: Document 9.pdf | 6 Aug 2018 |
| OtherFile: Document 9.pdf | 6 Aug 2018 |
| Layout approvalFile: TP ORDER COPY-ilovepdf-compressed.pdf | 14 Feb 2018 |
| Building plan approvalFile: TP ORDER COPY-ilovepdf-compressed.pdf | 14 Feb 2018 |
| Copy of the legal title reportFile: SEARCH TITLE REPORT.pdf | 14 Feb 2018 |
| Details of encumbrancesFile: BANK UPDATE.pdf | 14 Feb 2018 |
| Copy of Layout Approval (in case of layout)File: TP ORDER COPY-ilovepdf-compressed.pdf | 14 Feb 2018 |
| Building Plan Approval (IOD)File: TP ORDER COPY-ilovepdf-compressed.pdf | 14 Feb 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: ORDER COPY TP.pdf | 14 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCT CER.pdf | 14 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER.pdf | 14 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER.pdf | 14 Feb 2018 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf | 14 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architech.pdf | 12 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer.pdf | 12 Feb 2018 |
| Certificates of CA (Form 3)File: FORM_3_PLOT_NO_3.pdf | 12 Feb 2018 |
| Layout approvalFile: layout.pdf | 31 Jul 2017 |
| Building plan approvalFile: layout.pdf | 31 Jul 2017 |
| PAN CardFile: Pancard.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: output.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: yukti encrabramnce.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: layout.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: output (1).pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rajesh thakur - architect.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rajesh thakur engineering.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: ca cetificate.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Agreement For Sale.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 47 filed documents as one ZIP, foldered, with a manifest
Keep Shree G Square on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dhamote5,900+ in Raigarh
Filed coordinates, straight-line distance. 179 registered projects within 2 km.
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: RAJESH AMARLAL THAKUR
RAJESH AMARLAL THAKUR has 2 registrations on MahaRERA, including Shree G Square and Shree G Funzone. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Shree G Square is delayed beyond 1 Dec 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree G Square?
The registered promoter entity is RAJESH AMARLAL THAKUR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree G Square?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree G Square?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree G Square?
The professionals named in the filing: Architect: THE DESIGN INDIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree G Square?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback